Abstract
The technical system for assessing the technical condition of the weir method of tunnels cannot match the current specifications. To comprehensively assess the structural technical condition of the weir method of highway tunnels, this paper built a multi-level assessment system consisting of sections, parts, subitems, and components by adopting the structural analysis concept. Meanwhile, the analytic hierarchy process (AHP) was employed to determine the weights of the subitems for each section of the tunnel structure, and develop a method for assessing the technical condition of the civil structure of highway tunnels via the weir method. The technical condition assessment of the Yangcheng West Lake Tunnel in Suzhou shows that the technical condition score of this tunnel is basically consistent with the current standards. Additionally, the assessment results are more comprehensive, which can provide references for the technical condition assessment of civil structures of highway tunnels with similar weir methods.
Publication Date
11-8-2022
DOI
10.14048/j.issn.1671-2579.2022.05.027
First Page
151
Last Page
155
Submission Date
April 2025
Recommended Citation
Xun, Quan; Qiang, Xu; and Hongzhe, Li
(2022)
"Discussion on Highway Tunnel Civil Structure Technical Condition Assessment of Weir Method,"
Journal of China & Foreign Highway: Vol. 42:
Iss.
5, Article 27.
DOI: 10.14048/j.issn.1671-2579.2022.05.027
Available at:
https://zwgl1980.csust.edu.cn/journal/vol42/iss5/27
Reference
[1] 王梦恕. 水下交通隧道的设计与施工[J]. 中国工程科学, 2009, 11(7): 4-10. WANG Mengshu. Design and construction technology of underwater tunnel[J]. Strategic Study of CAE, 2009, 11(7): 4-10. [2] 陈建芹, 冯晓燕, 魏怀, 等. 中国水下隧道数据统计[J]. 隧道建设(中英文), 2021, 41(3): 483-516. CHEN Jianqin, FENG Xiaoyan, WEI Huai, et al. Statistics on underwater tunnels in China[J]. Tunnel Construction, 2021, 41(3): 483-516. [3] 重庆市交通委员会. 公路隧道养护技术规范: JTG H12—2015[S]. 北京: 人民交通出版社, 2015. Chongqing Municipal Transportation Commission. Technical Specifications for highway tunnel maintenance: JTG H12—2015 [S]. Beijing: China Communications Press, 2015. [4] 同济大学.盾构法隧道结构服役性能鉴定规范:DG/T J08-2123—2013[S].北京:中国建筑工业出版社,2013. Tongji University. Specifications for performance evaluation of shield tunnel structures: DG/T J08-2123—2013 [S]. Beijing: China Architecture & Building Press, 2013. [5] 广州市城市道路养护管理中心,广州市市政集团有限公司.内河沉管隧道管养技术规范:DBJ/T15-156—2019 [S].北京:中国城市出版社,2019. Guangzhou Urban Road Maintenance Management Center, Guangzhou Municipal Group Co., Ltd. Technical specifications for maintenance of immersed tube tunnels in inland waterways: DBJ/T15-156—2019 [S]. Beijing: China City Press, 2019. [6] 林志, 陈思, 陈相. 隧道土建结构技术状况评定方法研究[J]. 隧道建设, 2017, 37(5): 537-542. LIN Zhi, CHEN Si, CHEN Xiang. Study of technical status assessment method for tunnel construction[J]. Tunnel Construction, 2017, 37(5): 537-542. [7] 蒋雅君, 陶双江, 杨露, 等. 基于DERU评价方法的运营公路隧道土建结构技术状况综合评价技术研究[J]. 隧道建设(中英文), 2017, 37(10): 1239-1245. JIANG Yajun, TAO Shuangjiang, YANG Lu, et al. Study of comprehensive evaluation system for operation highway tunnel structure technical conditions based on DERU evaluation method[J]. Tunnel Construction, 2017, 37(10): 1239-1245. [8] 吴华勇. 城市盾构隧道技术状况评定方法研究[J]. 城市道桥与防洪, 2020(6): 220-223. WU Huayong. Urban Roads Bridges & Flood Control, 2020(6): 220-223. Wu Huayong. Research on the evaluation method for the technical condition of urban shield tunnels [J]. Urban Roads Bridges & Flood Control, 2020(6): 220–223. [9] 王永东, 叶铭, 郑卓琦, 等. 基于病害关联性的运营隧道衬砌技术状况评价研究[J]. 隧道建设(中英文), 2021, 41(4): 684-691. WANG Yongdong, YE Ming, ZHENG Zhuoqi, et al. Study on evaluation of lining technical condition of operating tunnel based on disease correlation[J]. Tunnel Construction, 2021, 41(4): 684-691. [10] 张素磊, 张顶立, 陈淮, 等. 运营隧道衬砌结构技术状况的评定方法研究[J]. 北京交通大学学报, 2013, 37(4): 19-23, 29. ZHANG Sulei, ZHANG Dingli, CHEN Huai, et al. Study on lining structure technical condition assessment method for operational tunnel[J]. Journal of Beijing Jiaotong University, 2013, 37(4): 19-23, 29. [11] 彭张林. 综合评价过程中的相关问题及方法研究[D]. 合肥: 合肥工业大学, 2015. PENG Zhanglin. Research on related problems and methods in the process of comprehensive evaluation[D]. Hefei: Hefei University of Technology, 2015. [12] 斯新华, 黄倩文, 黄文韬, 等. 基于层次分析法的常规公路桥梁技术状况评定方法[J]. 公路交通技术, 2020, 36(6): 91-97. SI Xinhua, HUANG Qianwen, HUANG Wentao, et al. Evaluation method of technical condition of conventional highway bridges based on analytic hierarchy process (AHP)[J]. Technology of Highway and Transport, 2020, 36(6): 91-97. [13] 洪平, 刘鹏举. 层次分析法在铁路运营隧道健康状态综合评判中的应用[J]. 现代隧道技术, 2011, 48(1): 28-32. HONG Ping, LIU Pengju. Application of analytic hierarchy process in comprehensive assessment for health condition of railway tunnels in operation[J]. Modern Tunnelling Technology, 2011, 48(1): 28-32. [14] 洪志国, 李焱, 范植华, 等. 层次分析法中高阶平均随机一致性指标(RI)的计算[J]. 计算机工程与应用, 2002, 38(12): 45-47, 150. HONG Zhiguo, LI Yan, FAN Zhihua, et al. Caculation on high-ranked R I of analytic hierarchy process[J]. Computer Engineering and Applications, 2002, 38(12): 45-47, 150.