•  
  •  
 

Abstract

The Guangling System in Taizhou, Jiangsu is a complex multi-limb hub for transportation transfer between the G2 Beijing-Shanghai Expressway, G40 Shanghai-Shaanxi Expressway, and G1515 Yancheng-Jingjiang Expressway. Based on the Guangling System, this paper conducted analysis of the current situation and long-term adaptability of the system, formulated principles for reconstruction and extension, and proposed multiple reconstruction and extension schemes. Meanwhile, it carried out comprehensive comparison and research from the aspects of service functions, technical indicators, economic benefits, and construction guarantee to determine the suitable recommended scheme.

Publication Date

11-8-2022

DOI

10.14048/j.issn.1671-2579.2022.05.048

First Page

263

Last Page

268

Submission Date

April 2025

Reference

[1] 国家发展改革委.长江干线过江通道布局规划(2020— 2035年)[Z],2020. National Development and Reform Commission. Layout plan for cross-river channels along the yangtze river mainline (2020–2035) [Z], 2020. [2] 江苏省交通运输厅.江苏省高速公路网规划(2017—2035 年)[Z],2017. Jiangsu Provincial Department of Transportation. Jiangsu provincial expressway network plan (2017–2035) [Z], 2017. [3] 华设设计集团股份有限公司.京沪高速公路广陵至靖江段扩建工程广陵枢纽方案研究报告[R],2021. China Design Group Co., Ltd. Feasibility study report on the guangling hub for the expansion project of the guangling to jingjiang section of the Beijing-Shanghai expressway [R], 2021. [4] 江苏交通控股股份有限公司.江苏交控系统高速公路改扩建时机研究报告[R],2020. Jiangsu Transportation Holdings Co., Ltd. Research report on the timing of expressway expansion and reconstruction in the jiangsu transportation holdings system [R], 2020. [5] 华设设计集团股份有限公司.沪陕高速公路平潮至广陵段扩建工程施工图设计[Z],2020. China Design Group Co., Ltd. Construction drawing design for the expansion project of the pingchao to guangling section of the Shanghai-Shaanxi expressway [Z], 2020. [6] 中交第一公路勘察设计研究院有限公司. 公路路线设计规范: JTGD20—2017[S].北京:人民交通出版社股份有限公司,2017. CCCC First Highway Consultants Co., Ltd. Specifications for highway route design: JTG D20—2017 [S]. Beijing: China Communications Press Co., Ltd., 2017. [7] 中国公路工程咨询集团有限公司. 公路立体交叉设计细则: JTG/T D21—2014[S]. 北京: 人民交通出版社, 2014. China Highway Engineering Consulting Group Co., Ltd. Detailed guidelines for the design of highway interchanges: JTG/T D21—2014 [S]. Beijing: China Communications Press, 2014. [8] 李迎春, 韦剑, 杨和平. 高速公路多肢枢纽互通立交改扩建方案设计研究[J]. 中外公路, 2010, 30(5): 7-10. Li Yingchun, Wei Jian, Yang Heping. Research on the design of reconstruction and expansion plans for multi-leg hub interchanges on expressways [J]. Journal of Chinese and Foreign Highway, 2010, 30(5): 7-10. [9] 邱万军. 浅论互通式立交改扩建方案的设计[J]. 公路, 2011, 56(4): 95-98. Qiu Wanjun. A brief discussion on the design of reconstruction and expansion plans for interchanges [J]. Highway, 2011, 56(4): 95-98. [10] 樊火印, 侯明哲. 鉴湖复合式枢纽互通立交方案研究[J]. 公路, 2019, 64(7): 52-56. FAN Huoyin, HOU Mingzhe. Study on interchange scheme of Jianhu composite hub[J]. Highway, 2019, 64(7): 52-56. [11] 曹文涛,李志涛,孙学琴.沪武高速董浜枢纽改扩建方案研究[J].公路与汽运,2020(6):115-118. Cao Wentao, Li Zhitao, Sun Xueqin. Research on the reconstruction and expansion plan of dongbin hub on the Shanghai-Wuhan expressway [J]. Highways & Automotive Applications, 2020(6): 115-118.

Share

COinS