•  
  •  
 

Abstract

In the high-intensity dangerous mountainous areas of western China, the terrain is complex, and geological disasters are developing. Highway routes need to avoid major geological disasters and choose favorable terrain layout. Meanwhile, highway construction also faces difficulties in the approach of construction and emergency rescue during operation. In the design of the route scheme for Tongtou Gorge section of Leying–Baoxing Expressway in Sichuan Province, two Yonglin combined cableway bridges across the canyon were cleverly set up, making the laying of the route on the opposite bank of the existing road possible. It transformed one ultra-long tunnel into three long tunnels. Meanwhile, problems such as ventilation and emergency rescue during the construction approach and operation period were solved, and comprehensive disaster resistance was improved. It saved project investment and could provide a reference for similar projects in mountainous areas.

Publication Date

11-24-2023

DOI

10.14048/j.issn.1671-2579.2023.05.046

First Page

273

Last Page

276

Submission Date

March 2025

Reference

[1] 杨昌凤, 李树鼎, 殷强, 等. 映秀~汶川高速公路设计中的关键技术对策[J]. 公路, 2013, 58(5): 102-106. YANG Changfeng, LI Shuding, YIN Qiang, et al. Key technical countermeasures in yingxiu-Wenchuan expressway design[J]. Highway, 2013, 58(5): 102-106. [2] 杨昌凤, 余蜀予, 汪晓锋, 等. 芦山地震后宝兴生命线通道恢复重建规划研究[J]. 山西建筑, 2015, 41(23): 1-2,3. YANG Changfeng, YU Shuyu, WANG Xiaofeng, et al. Research on Baoxing lifeline passageway restoration and reconstruction planning of Lushan after earthquake[J]. Shanxi Architecture, 2015, 41(23): 1-2,3. [3] 杨昌凤,殷强,李树鼎,等.高烈度山区公路选线策略[J].中外公路,2015,35(6):1‑4. YANG Changfeng, YIN Qiang, LI Shuding, et al. High intensity mountainous area highway alignment strategy [J]. Journal of China & Foreign Highway, 2015,35(6):1‑4. [4] 王宏权. 粤东山区复杂地质条件下特长公路隧道路段线路方案研究[J]. 中外公路, 2021, 41(2): 256-260. WANG Hongquan. Study on route scheme of extra-long highway tunnel section under complex geological conditions in mountainous areas of eastern Guangdong Province[J]. Journal of China & Foreign Highway, 2021, 41(2): 256-260. [5] 翟正平. 特长公路隧道方案选择[J]. 中外公路, 2018, 38(4): 223-229. ZHAI Zhengping. Scheme selection of extra-long highway tunnel[J]. Journal of China & Foreign Highway, 2018, 38(4): 223-229. [6] 苏强, 吴东明, 谢正元. 多股成品索锚碇锚固系统关键技术研究[J]. 中外公路, 2018, 38(4): 197-200. SU Qiang, WU Dongming, XIE Zhengyuan. Research on key technology of the multi-strand finished tendon for anchorage system[J]. Journal of China & Foreign Highway, 2018, 38(4): 197-200. [7] 黄绍金, 刘陌生. 现代索道桥[M]. 北京: 人民交通出版社, 2004. HUANG Shaojin, LIU Mosheng. Modern cableway bridge[M]. Beijing: China Communications Press, 2004. [8] 四川省交通运输厅公路规划勘察设计研究院. 汶川地震灾后重建公路抗震减灾关键技术研究[Z],2013. Highway Planning, Survey and Design Institute of Sichuan Provincial Department of Transport. Research on key technologies of anti-seismic and disaster mitigation for highways reconstructed after Wenchuan earthquake [Z], 2013. [9]四川省交通运输厅公路规划勘察设计研究院. 国道351线乐英至夹金山垭口段恢复重建工程施工图设计文件[Z],2014. Highway Planning, Survey and Design Institute of Sichuan Provincial Department of Transport. Construction drawing design document for the restoration and reconstruction project of the section of National Highway 351 from Leying to Jiejinshan Pass [Z], 2014.

Share

COinS