•  
  •  
 

Abstract

Highway construction projects are mostly linear projects with zonal distribution, which contain multiple structures and are closely integrated with the geographical environment. During their applications in BIM, they often face the problems of massive data delivery and multi-source heterogeneous data fusion. Therefore, based on the secondary development of CATIA CAA, this paper proposed a lightweight method for the BIM model in bridge engineering, elaborated on the general lightweight concept, and then detailed the lightweight process, with a BIM model lightweight program independently developed. By taking the Heishuihe Bridge as an example, the functionality and stability of the program were tested, and the digital delivery and application of lightweight follow-up models on the BIM platform were achieved. Finally, the results indicate that this lightweight method has certain application prospects and practical significance.

Publication Date

1-18-2024

DOI

10.14048/j.issn.1671-2579.2023.06.016

First Page

101

Last Page

104

Submission Date

March 2025

Reference

[1] 邵艳, 丁璁. 公路工程建设阶段BIM技术实施探索[J]. 中外公路, 2018, 38(6): 327-331. SHAO Yan, DING Cong. Exploration on the implementation of BIM technology in highway engineering construction stage [J]. Journal of China & Foreign Highway, 2018, 38(6): 327-331. [2] 罗通, 练章华, 牟易升, 等. 基于CATIA二次开发的渠道三维设计研究[J]. 水资源与水工程学报, 2020, 31(1): 146-153. LUO Tong, LIAN Zhanghua, (MOU/MU) Yisheng, et al. Study on three dimensional design of channels based on secondary development technology of CATIA[J]. Journal of Water Resources and Water Engineering, 2020, 31(1): 146-153. [3] 黄成岑, 李洋溢, 袁通. BIM技术在桥隧相接部位方案设计中的应用[J]. 中外公路, 2020, 40(5): 236-239. HUANG Chengcen, LI Yangyi, YUAN Tong. The application of BIM technology in the scheme design of bridge and tunnel connection parts [J]. Journal of China & Foreign Highway, 2020, 40(5): 236-239. [4] 姜玉龙, 夏远靖, 贺波. 基于GIS的BIM轻量化技术在桥梁工程中应用研究[J]. 公路, 2020, 65(1): 123-127. JIANG Yulong, XIA Yuanjing, HE Bo. Research on the application of BIM lightweight technology based on GIS in bridge engineering [J]. Highway, 2020, 65(1): 123-127. [5] 郭思怡, 陈永锋. 建筑运维阶段信息模型的轻量化方法[J]. 图学学报, 2018, 39(1): 123-128. GUO Siyi, CHEN Yongfeng. Simplification method of information modeling in the building project operation and maintenance stage[J]. Journal of Graphics, 2018, 39(1): 123-128. [6] 金波. MicroStation三维模型导出ArcGIS SLPK格式探讨[J]. 智能制造, 2020(8): 29-35. JIN Bo. Discussion on ArcGIS SLPK format derived from MicroStation 3D model [J]. Intelligent Manufacturing, 2020(8): 29-35. [7] 孙建诚, 朱双晗, 蒋浩鹏. BIM技术在公路工程中的应用研究[J]. 中外公路, 2019, 39(4): 294-297. SUN Jiancheng, ZHU Shuanghan, JIANG Haopeng. Application of BIM technology to highway engineering[J]. Journal of China & Foreign Highway, 2019, 39(4): 294-297 [8] 邹威, 李磊, 龚其琛. 一种基于FME的空间数据属性更新方法[J]. 地理空间信息, 2020, 18(5): 99-101,114,8. ZOU Wei, LI Lei, GONG Qichen. Spatial data property update method based on FME[J]. Geospatial Information, 2020, 18(5): 99-101,114,8.

Share

COinS