Abstract

According to the theory of the non-stress state method, the elastic curve of the main girder during the central-span closure should remain continuous to ensure that the internal forces and alignment of the built cable-stayed bridge reach the target state after construction, which means the relative angle of the main girders on both sides of the closure should be zero. However, it is difficult to meet the condition of absolute zero of the relative angle in practical engineering. By taking the Chibi Changjiang River Highway Bridge as the engineering background, this paper studied the influence of relative angle error during the central-span closure of a large-span composite girder cable-stayed bridge on the final target state of the built bridge, thus determining the allowable range of relative angle error. The analysis results reveal that the relative angle error of the main girders on both sides of the closure gap during the central-span closure mainly has a significant influence on the stress of the main girders under the target state of the built bridge, with little effect exerted on tower deviation, cable force, and main girder alignment. For the Chibi Changjiang River Highway Bridge, the allowable relative angle error of the main girders on both sides of the closure can be set as ±1×10-3 rad during the central-span closure. Within this range, it can be considered that the elastic curves of the main girders on both sides of the closure are continuous.

Publication Date

1-18-2024

DOI

10.14048/j.issn.1671-2579.2023.06.018

First Page

115

Last Page

119

Submission Date

March 2025

Reference

[1] 张德平, 周健鸿, 王东晖. 赤壁长江公路大桥主桥主梁设计[J]. 桥梁建设, 2019, 49(4): 81-85. ZHANG Deping, ZHOU Jianhong, WANG Donghui. Design of main girder of Chibi Changjiang River highway bridge[J]. Bridge Construction, 2019, 49(4): 81-85. [2] 邵长宇, 陈亮, 汤虎. 大跨径组合梁斜拉桥试设计及力学性能研究[J]. 桥梁建设, 2017, 47(4): 101-106. SHAO Changyu, CHEN Liang, TANG Hu. Study of trial design and mechanical performance of long span composite girder cable-stayed bridges[J]. Bridge Construction, 2017, 47(4): 101-106. [3] 王岭军.钢‒混凝土组合梁斜拉桥梁结构的稳定性分析[J].公路工程,2019,44(2):201‑204. WANG Lingjun. Stability analysis of steel-concrete composite beam cable-stayed bridge structures [J]. Highway Engineering, 2019, 44(2): 201-204. [4] 龚臻, 李翠平, 雷洛. 复杂艰险条件下钢混组合桥梁设计应用[J]. 中外公路, 2022, 42(2): 131-137. GONG Zhen, LI Cuiping, LEI Luo. Design and application of steel-concrete composite bridge under complex and dangerous conditions[J]. Journal of China & Foreign Highway, 2022, 42(2): 131-137. [5] 田波, 宋路兵. 混合梁斜拉桥钢-混结合段设计关键技术[J]. 中外公路, 2023, 43(2): 117-120. TIAN Bo, SONG Lubing. Key technology of steel-concrete composite section design of matrix hybrid girder cable-stayed bridge [J]. Journal of China & Foreign Highway, 2023, 43(2): 117-120. [6] 秦顺全. 分阶段成形结构过程控制的无应力状态控制法[J]. 中国工程科学, 2009, 11(10): 72-78. QIN Shunquan. Unstressed state control method for process control of structure formed by stages[J]. Strategic Study of CAE, 2009, 11(10): 72-78. [7] 涂光亚,石洋,邹磊.大跨度钢混组合梁斜拉桥钢主梁截面参数对成桥状态主梁受力敏感性分析[J].中外公路,2022,42(1):108‑115. TU Guangya, SHI Yang, ZOU Lei. Sensitivity analysis of main beam stress in the completed state of long-span steel-concrete composite beam cable-stayed bridge to section parameters of steel main beam [J]. Journal of China and Foreign Highway, 2022, 42(1): 108-115. [8] 张玉平, 徐先鹏, 李香梅, 等. 混合式组合梁斜拉桥参数分析与施工控制[J]. 中外公路, 2022, 42(3): 85-92. ZHANG Yuping, XU Xianpeng, LI Xiangmei, et al. Parameter analysis and construction control of hybrid composite girder cable-stayed bridge [J]. Journal of China & Foreign Highway, 2022, 42(3): 85-92. [9] 徐先鹏. 不对称双悬臂施工混合梁斜拉桥施工控制与风险评估方法研究[D].长沙:长沙理工大学,2023. XU Xianpeng. Study on construction control and risk assessment methods for asymmetric double cantilever construction of hybrid beam cable-stayed bridges [D]. Changsha: Changsha University of Science and Technology, 2023. [10] 陈璐, 陈小佳. 多段索异形塔斜拉桥施工阶段索力计算[J]. 中外公路, 2021, 41(1): 143-148. CHEN Lu, CHEN Xiaojia. Cable force calculation of multi-segment cable-stayed bridge with special-shaped tower in construction stage [J]. Journal of China & Foreign Highway, 2021, 41(1): 143-148. [11] 秦顺全. 分阶段施工桥梁的无应力状态控制法[J]. 桥梁建设, 2008, 38(1): 8-14. QIN Shunquan. Unstressed state control method for bridges constructed in stages[J]. Bridge Construction, 2008, 38(1): 8-14. [12] 傅亚军,刘浩,陈常松,等.钢梁线形误差在组合梁斜拉桥中的传递研究[J].中外公路,2022,42(6):72‑76. FU Yajun, LIU Hao, CHEN Changsong, et al. Study on the propagation of steel beam shape errors in composite beam cable-stayed bridges [J]. Journal of China and Foreign Highway, 2022, 42(6): 72-76. [13] 熊先勇, 傅亚军, 黄茛. 钢‒混组合梁斜拉桥钢主梁安装方法分析与误差控制[J]. 中外公路, 2023, 43(3): 126-133. XIONG Xianyong, FU Yajun, HUANG Gen. Installation method analysis and error control of steel girder of steel-concrete composite girder cable-stayed bridge [J]. Journal of China & Foreign Highway, 2023, 43(3): 126-133. [14] 秦顺全. 无应力状态控制法: 斜拉桥安装计算的应用[J]. 桥梁建设, 2008, 38(2): 13-16,30. QIN Shunquan. Application of unstressed state control method to calculation for erection of cable-stayed bridge[J]. Bridge Construction, 2008, 38(2): 13-16,30. [15] 余昆, 李景成. 基于无应力状态法的悬臂拼装斜拉桥的线形控制[J]. 桥梁建设, 2012, 42(3): 44-49. YU Kun, LI Jingcheng. Geometric shape control of cantilever assembled cable-stayed bridge based on unstressed state method[J]. Bridge Construction, 2012, 42(3): 44-49. [16] 魏友良.叠合梁斜拉桥准无应力状态控制方法研究[D].重庆:重庆交通大学,2019. WEI Youliang. Study on quasi zero-stress state control method of composite beam cable-stayed bridges [D]. Chongqing: Chongqing Jiaotong University, 2019. [17] 任雷, 卢亮, 董正良. 深切峡谷叠合梁斜拉桥上构安装施工技术[J]. 中外公路, 2023, 43(1): 135-138. REN Lei, LU Liang, DONG Zhengliang. Installation and construction technology of superstructure of composite girder cable-stayed bridge in deep cutting canyon [J]. Journal of China & Foreign Highway, 2023, 43(1): 135-138. [18] 刘小刚.无应力状态法在钢桁梁斜拉桥施工控制中的应用[D].广州:华南理工大学,2012. LIU Xiaogang. Application of stress-free state method in construction control of steel truss cable-stayed bridges [D]. Guangzhou: South China University of Technology, 2012. [19] 郝超. 大跨度钢斜拉桥施工误差调整方法研究[J]. 浙江大学学报(工学版), 2003, 37(3): 310-313. HAO Chao. Study on construction error adjustment method of long-span steel cable-stayed bridge[J]. Journal of Zhejiang University (Engineering Science), 2003, 37(3): 310-313. [20] 涂光亚, 袁航. 大跨度钢管混凝土拱桥成桥状态钢管应力优化研究[J]. 中外公路, 2020, 40(2): 140-143. TU Guangya, YUAN Hang. Research on Steel Tube Stress Optimization of Long Span Concrete Filled Steel Tubular Arch Bridge in Completed State [J]. Journal of China & Foreign Highway, 2020, 40(2): 140-143.

Share

COinS