Abstract

To solve the initial construction cable forces of a completed cable-stayed bridge,a method that combines unstressed cable length and forward-iteration is proposed.Firstly,the unstressed length of each cable is calculated according to the completed bridge state.Then,the initial cable forces are obtained by using the unstressed cable length for the forward analysis.The initial construction cable forces are adjusted by difference iteration.Finally,the initial construction cable forces are fine-tuned according to the deformation of the pylon deformation to obtain the bridge completion state that satisfies the deviation requirements.The proposed method is employed in a cable-stayed bridge with a known completion state to calculate the initial construction cable forces.The example shows that the calculation workload can be reduced by this method.The deviation of this completed state from target meets engineering accuracy requirements.

Publication Date

10-28-2024

DOI

10.14048/j.issn.1671-2579.2024.05.022

First Page

201

Last Page

209

Submission Date

February 2025

Reference

[1]杜国华 ,姜林 .斜拉桥的合理索力及其施工张拉力 [J].桥梁建设 ,1989 ,19(3):11-17.DU Guohua ,JIANG Lin .Reasonable cable force of cable-stayed bridge and its construction tension [J].Bridge Construction ,1989 ,19(3):11-17.
[2]辛克贵 ,冯仲 .大跨度斜拉桥的施工非线性倒拆分析 [J].工程力学 ,2004 ,21(5):31-35.XIN Kegui ,FENG Zhong .Nonlinear static reverse analysis of long-span cable-stayed bridges during construction [J].Engineering Mechanics ,2004 ,21(5):31-35.
[3]范立础 ,杜国华 ,马健中 .斜拉桥索力优化及非线性理想倒退分析 [J].重庆交通学院学报 ,1992 ,11(1):1-12.FAN Lichu ,DU Guohua ,MA Jianzhong .Optimization of cable force of cable-stayed bridges and nonlinear ideal reverse analysis [J].Journal of Chongqing Jiaotong Unive rsity,1992 ,11(1):1-12.
[4]坎彬 .大跨钢桁梁斜拉桥索力优化方法研究 [D].成都 :西南交通大学 ,2020 .KAN Bin .Study on cable force optimization method of long-span steel truss girder cable-stayed bridge [D].Chengdu :Southwest Jiaotong University ,2020 .
[5]秦顺全 .分阶段施工桥梁的无应力状态控制法 [J].桥梁建设 ,2008 ,38(1):8-14.QIN Shunquan .Unstressed state control method for bridges constructed in stages [J].Bridge Construction ,2008 ,38(1):8-14.
[6]李炎 ,陈常松 ,董道福 .斜拉桥施工控制张拉力的计算方法研究 [J].中外公路 ,2019 ,39(2):157-161.LI Yan ,CHEN Changsong ,DONG Daofu .Research on calculation method of cable tension in construction control of cable-stayed bridge [J].Journal of China & Foreign Highway ,2019 ,39(2):157-161.
[7]吴月星 ,张博恒 ,周建庭 ,等.基于无应力正装迭代法的大跨混凝土斜拉桥合理施工状态分析 [J].公路工程 ,2020 ,45(5):15-20,72.WU Yuexing ,ZHANG Boheng ,ZHOU Jianting ,et al.Analysis of reasonable construction state of the long-span concrete cable-stayed bridge based on stress-free forward iteration method [J].Highway Engineering ,2020 ,45(5):15-20,72.
[8]涂光亚,周城勇 .大跨度组合梁斜拉桥中跨合龙口相对转角误差分析 [J].中外公路 ,2023 ,43(6) :115-119.TU Guanya ,ZHOU Chengyong .Error analysis of relative angle at the central-span closure of long-span composite girder cable-stayed bridges [J].Journal of China & Foreign Highway ,2023,43(6):115-119.
[9]施洲 ,胡豪 ,周文 ,等.大跨度混合梁斜拉桥施工控制关键技术 [J].桥梁建设 ,2018 ,48(3):111-115.SHI Zhou ,HU Hao ,ZHOU Wen ,et al .Construction control key technique of long-span hybrid girder cable-stayed bridge [J].Bridge Construction ,2018 ,48(3):111-115.
[10]徐林 ,刘琪 .基于无应力状态控制法的斜拉桥安装计算方法研究 [J].中外公路 ,2019 ,39(1):149-154.XU Lin ,LIU Qi .Study on calculation method of cable-stayed bridge installation based on unstressed state control method [J].Journal of China & Foreign Highway ,2019 ,39(1):149-154.
[11]岳青 ,严和仲 ,阙水杰 ,等.大跨度钢箱梁斜拉桥施工控制[J].桥梁建设 ,2013 ,43(4):54-60.YUE Qing ,YAN Hezhong ,QUE Shuijie ,et al .Construction control of long span steel box girder cable-stayed bridge[J].Bridge Construction ,2013 ,43(4):54-60.
[12]颜东煌 ,刘光栋 .确定斜拉桥合理施工状态的正装迭代法[J].中国公路学报 ,1999 ,12(2):59-64.YAN Donghuang ,LIU Guangdong .Forward iteration method for determining reasonable construction state of cable-stayed bridge [J].China Journal of Highway and Transport ,1999 ,12(2):59-64.
[13]李介立,夏永豪,张啸文,等.叠合梁斜拉桥合理施工状态确定的正装差值迭代法 [J].中外公路 ,2023 ,43(6):218-223.LI Jieli,XIA Yonghao ,ZHANG Xiaowen ,et al .Forward difference iteration method for determining reasonable construction state of cable-stayed bridges with stacked girders [J].Journal of China & Foreign Highway ,2023,43(6):218-223.
[14]曾三林 .大跨非对称叠合 /混合梁斜拉桥合理施工状态及过程参数识别研究 [D].成都 :西南交通大学 ,2019 .ZENG Sanlin .Study on reasonable construction state and process parameter identification of long-span asymmetric composite/mixed beam cable-stayed bridge [D].Chengdu :Southwest Jiaotong University ,2019 .
[15]李乔 ,单德山 ,卜一之 ,等.大跨度桥梁施工控制倒拆分析法的闭合条件 [C]//重庆 :第十七届全国桥梁学术会议论文集 ,2006 .LI Qiao ,SHAN Deshan ,BU Yizhi et al .Closure conditions of construction control inversion and demolition analysis method for large span bridges [C]//Chongqing :Proceedings of the 17th National Bridge Academic Conference ,2006 :42-46.
[16]梁志广 ,李建中 ,石现峰 .斜拉桥施工初始索力的确定 [J].工程力学 ,2000 ,17(3):121-126.LIANG Zhiguang ,LI Jianzhong ,SHI Xianfeng .The determination of the initlal cable forces for cable-stayed bridges [J].Engineering Mechanics ,2000 ,17(3):121-126.
[17]林桢楷 .差值法确定矮塔斜拉桥的初张索力 [J].科学技术与工程 ,2010 ,10(16):4068 -4070 ,4079 .LIN Zhenkai .Determined the construction cable tension force of the extradosed cable-stayed bridge based on the differential method [J].Science Technology and Engineering ,2010 ,10(16):4068 -4070 ,4079 .Unive rsity,1992 ,11(1):1-12.
[4]坎彬 .大跨钢桁梁斜拉桥索力优化方法研究 [D].成都 :西南交通大学 ,2020 .KAN Bin .Study on cable force optimization method of long-span steel truss girder cable-stayed bridge [D].Chengdu :Southwest Jiaotong University ,2020 .
[5]秦顺全 .分阶段施工桥梁的无应力状态控制法 [J].桥梁建设 ,2008 ,38(1):8-14.QIN Shunquan .Unstressed state control method for bridges constructed in stages [J].Bridge Construction ,2008 ,38(1):8-14.
[6]李炎 ,陈常松 ,董道福 .斜拉桥施工控制张拉力的计算方法研究 [J].中外公路 ,2019 ,39(2):157-161.LI Yan ,CHEN Changsong ,DONG Daofu .Research on calculation method of cable tension in construction control of cable-stayed bridge [J].Journal of China & Foreign Highway ,2019 ,39(2):157-161.
[7]吴月星 ,张博恒 ,周建庭 ,等.基于无应力正装迭代法的大跨混凝土斜拉桥合理施工状态分析 [J].公路工程 ,2020 ,45(5):15-20,72.WU Yuexing ,ZHANG Boheng ,ZHOU Jianting ,et al.Analysis of reasonable construction state of the long-span concrete cable-stayed bridge based on stress-free forward iteration method [J].Highway Engineering ,2020 ,45(5):15-20,72.
[8]涂光亚,周城勇 .大跨度组合梁斜拉桥中跨合龙口相对转角误差分析 [J].中外公路 ,2023 ,43(6) :115-119.TU Guanya ,ZHOU Chengyong .Error analysis of relative angle at the central-span closure of long-span composite girder cable-stayed bridges [J].Journal of China & Foreign Highway ,2023,43(6):115-119.
[9]施洲 ,胡豪 ,周文 ,等.大跨度混合梁斜拉桥施工控制关键技术 [J].桥梁建设 ,2018 ,48(3):111-115.SHI Zhou ,HU Hao ,ZHOU Wen ,et al .Construction control key technique of long-span hybrid girder cable-stayed bridge [J].Bridge Construction ,2018 ,48(3):111-115.
[10]徐林 ,刘琪 .基于无应力状态控制法的斜拉桥安装计算方法研究 [J].中外公路 ,2019 ,39(1):149-154.XU Lin ,LIU Qi .Study on calculation method of cable-stayed bridge installation based on unstressed state control method [J].Journal of China & Foreign Highway ,2019 ,39(1):149-154.
[11]岳青 ,严和仲 ,阙水杰 ,等.大跨度钢箱梁斜拉桥施工控制[J].桥梁建设 ,2013 ,43(4):54-60.YUE Qing ,YAN Hezhong ,QUE Shuijie ,et al .Construction control of long span steel box girder cable-stayed bridge[J].Bridge Construction ,2013 ,43(4):54-60.
[12]颜东煌 ,刘光栋 .确定斜拉桥合理施工状态的正装迭代法[J].中国公路学报 ,1999 ,12(2):59-64.YAN Donghuang ,LIU Guangdong .Forward iteration method for determining reasonable construction state of cable-stayed bridge [J].China Journal of Highway and Transport ,1999 ,12(2):59-64.
[13]李介立,夏永豪,张啸文,等.叠合梁斜拉桥合理施工状态确定的正装差值迭代法 [J].中外公路 ,2023 ,43(6):218-223.LI Jieli,XIA Yonghao ,ZHANG Xiaowen ,et al .Forward difference iteration method for determining reasonable construction state of cable-stayed bridges with stacked girders [J].Journal of China & Foreign Highway ,2023,43(6):218-223.
[14]曾三林 .大跨非对称叠合 /混合梁斜拉桥合理施工状态及过程参数识别研究 [D].成都 :西南交通大学 ,2019 .ZENG Sanlin .Study on reasonable construction state and process parameter identification of long-span asymmetric composite/mixed beam cable-stayed bridge [D].Chengdu :Southwest Jiaotong University ,2019 .
[15]李乔 ,单德山 ,卜一之 ,等.大跨度桥梁施工控制倒拆分析法的闭合条件 [C]//重庆 :第十七届全国桥梁学术会议论文集 ,2006 .LI Qiao ,SHAN Deshan ,BU Yizhi et al .Closure conditions of construction control inversion and demolition analysis method for large span bridges [C]//Chongqing :Proceedings of the 17th National Bridge Academic Conference ,2006 :42-46.
[16]梁志广 ,李建中 ,石现峰 .斜拉桥施工初始索力的确定 [J].工程力学 ,2000 ,17(3):121-126.LIANG Zhiguang ,LI Jianzhong ,SHI Xianfeng .The determination of the initlal cable forces for cable-stayed bridges [J].Engineering Mechanics ,2000 ,17(3):121-126.
[17]林桢楷 .差值法确定矮塔斜拉桥的初张索力 [J].科学技术与工程 ,2010 ,10(16):4068 -4070 ,4079 .LIN Zhenkai .Determined the construction cable tension force of the extradosed cable-stayed bridge based on the differential method [J].Science Technology and Engineering ,2010 ,10(16):4068 -4070 ,4079 .

Share

COinS