Abstract

To improve the industrial construction level of steel bridges,a prefabricated continuous steel box girder bridge was designed in this study,which is suitable for bidirectional four lanes and six lanes with spans ranging from 40 m to 80 m.The overall dimensions and local structures of the steel box girder bridge were determined according to the specifications and engineering experience,and the load-bearing capacity was checked.Modular industrial products were designed by defining the vertical and horizontal modular divisions for the steel box girders,resulting in 21 standardized modular components.Based on the concept of life cycle,an economic analysis of the prefabricated steel box girder bridge was carried out.Research results show that the overall dimensions and local structures of the prefabricated steel box girder bridge are reasonable.The modular product design improves the versatility of steel box girder bridges across different spans and lanes,greatly simplifying the construction process to meet industrial construction requirements.When considering the whole life cycle and the recovery of steel materials,the average annual cost of prefabricated steel box girder bridges is only about 30% of that of concrete girder bridges.Additionally,its carbon emissions during the construction phase are lower than those of concrete girder bridges,providing a significant economic advantage over the entire life cycle.

Publication Date

2-22-2025

DOI

10.14048/j.issn.1671-2579.2025.01.028

First Page

225

Last Page

234

Submission Date

March 2025

Reference

[1]中华人民共和国交通运输部.2021年交通运输行业发展统计公报 [R].北京:中华人民共和国交通运输部,2022.Ministry of Transport of the PRC.2021 transport industry development statistical bulletin [R].Beijing:Ministry of Transport of the PRC,2022.
[2]项贻强,竺盛,赵阳.快速施工桥梁的研究进展 [J].中国公路学报,2018,31(12):1-27.XIANG Yiqiang,ZHU Sheng,ZHAO Yang.Research and development on accelerated bridge construction technology [J].China Journal of Highway and Transport,2018,31(12):1-27.
[3]孙策.城市桥梁预制装配化绿色建造技术应用与发展[J].世界桥梁,2021,49(1):39-44.SUN Ce.Utilization and development of prefabrication and modular green construction for urban bridges [J].World Bridges,2021,49(1):39-44.
[4]田飞,夏昊,王敏,等.中小跨径全装配式梁桥一体化架设方法及装备 [J].中外公路,2022,42(5):83-87.TIAN Fei,XIA Hao,WANG Min,et al.Integrated erection method and equipment of full prefabrication medium and small span bridges [J].Journal of China & Foreign Highway,2022,42(5):83-87.
[5]苏权科,谢红兵.港珠澳大桥钢结构桥梁建设综述 [J].中国公路学报,2016,29(12):1-9.SU Quanke,XIE Hongbing.Summary of steel bridge construction of Hong Kong-Zhuhai-Macao Bridge [J].China Journal of Highway and Transport,2016,29(12):1-9.
[6]CHEN Z Y,LI C X,HE J,et al.Retrofit fatigue cracked diaphragm cutouts using improved geometry in orthotropic steel decks [J].Applied Sciences,2020,10(11):3983.
[7]麦鑫浩.斜交小箱梁中横隔板优化布设研究 [J].中外公路,2023,43(3):150-154.MAI Xinhao.Study on optimal layout of cross-diaphragm in oblique small box girder [J].Journal of China & Foreign Highway,2023,43(3):150-154.
[8]刘力,彭成明,罗航.超宽钢箱梁纵横向分块安装局部相对变形分析 [J].中外公路,2023,43(1):108-113.LIU Li,PENG Chengming,LUO Hang.Analysis on local relative deformation of vertical and horizontal split block section of ultra wide steel box-girder [J].Journal of China & Foreign Highway,2023,43(1):108-113.
[9]来猛刚,杨敏,翟敏刚,等.桥梁工业化智能建造 [J].公路,2021,66(7):195-202.LAI Menggang,YANG Min,ZHAI Mingang,et al.Industrialized intelligent construction of bridge [J].Highway,2021,66(7):195-202.
[10]陈思铭,陈常松,颜东煌.基于逐段安装线形的钢箱梁制造尺寸计算研究 [J].中外公路,2020,40(2):91-93.Chen Siming,Chen Changsong,Yan Donghuang.Research on calculation of manufacturing dimensions of steel box girder based on piecewise installation line [J].Journal of China & Foreign Highway,2020,40(2):91-93.
[11]周志祥,钟世祥,张江涛,等.桥梁装配式技术发展与工业化制造探讨 [J].重庆交通大学学报 (自然科学版 ),2021,40(10):29-40,72.ZHOU Zhixiang,ZHONG Shixiang,ZHANG Jiangtao,et al.Discussion on the development of bridge prefabricated technology and industrial manufacturing [J].Journal of Chongqing Jiaotong University (Natural Science ),2021,40(10):29-40,72.
[12]黄震伟,邢世玲,徐秀丽,等.中等跨径连续钢箱梁桥上部结构的标准化设计研究 [J].公路工程,2017,42(2):154-158,169.HUANG Zhenwei,XING Shiling,XU Xiuli,et al.The study of standardized design of superstructure of mid-span continuous steel box-girder bridges [J].Highway Engineering,2017,42(2):154-158,169.
[13]邢心魁,党浩,刘顺,等.新型装配式方钢桥受力性能研究[J].中外公路,2021,41(4):95-100.XING Xinkui,DANG Hao,LIU Shun,et al.Study on mechanical properties for new type prefabricated bridge with square steel [J].Journal of China & Foreign Highway,2021,41(4):95-100.
[14]赵秋,陈美忠,陈友杰.中国连续钢箱梁桥发展现状调查与分析 [J].中外公路,2015,35(1):98-102.ZHAO Qiu,CHEN Meizhong,CHEN Youjie.Investigation and analysis on development status of continuous steel box girder bridge in China [J].Journal of China & Foreign Highway,2015,35(1):98-102.
[15]刘永健,高诣民,周绪红,等.中小跨径钢 -混凝土组合梁桥技术经济性分析 [J].中国公路学报,2017,30(3):1-13.LIU Yongjian,GAO Yimin,ZHOU Xuhong,et al.Technical and economic analysis in steel-concrete composite girder bridges with small and medium span [J].China Journal of Highway and Transport,2017,30(3):1-13.
[16]交通运输部公路局,中交第一公路勘察设计研究院有限公司 .公路工程技术标准:JTG B 01—2014 [S].北京:人民交通出版社股份有限公司,2015.Highway Bureau of the Ministry of Transport,CCCC First Highway Consultants Co.,Ltd..Technical standard of highway engineering:JTG B 01—2014 [S].Beijing:China Communications Press Co.,Ltd.,2015.
[17]中交公路规划设计院有限公司 .公路钢结构桥梁设计规范:JTG D 64—2015 [S].北京:人民交通出版社,2015.CCCC Highway Consultants Co.,Ltd..Specifications for design of highway steel bridge:JTG D 64—2015 [S].Beijing:China Communications Press Co.,Ltd.,2015.
[18]交通部专家委员会,等.公路桥梁通用图 装配式预应力混凝土简支 T梁桥上部构造 [M].北京:人民交通出版社,2008.Committee of Experts of the Ministry of Transport,et al.Prefabricated prestressed concrete simply supported T beam bridge superstructure [M].Beijing:China Communications Press,2008.
[19]交通部专家委员会,等.公路桥梁通用图 装配式预应力混凝土箱型连续梁桥上部构造 [M].北京:人民交通出版社,2007.Committee of Experts of the Ministry of Transport,et al.Prefabricated prestressed concrete box type continuous girder bridge superstructure [M].Beijing:China Communications Press,2007.
[20]赵平,同继锋,马眷荣.建筑材料环境负荷指标及评价体系的研究 [J].中国建材科技,2004,13(6):1-7.ZHAO Ping,TONG Jifeng,MA Juanrong.The research on the system of the building material environment load index and evaluate [J].China Building Materials Science & Technology,2004,13(6):1-7.
[21]湖北省交通基本建设造价管理站.湖北省交通工程主要材料价格信息 2022年10月— 2022年11月[J].湖北交通工程造价信息,2022 (6):61-101.Transportation Infrastructure Construction Cost Management Station of Hubei Province.Price information of main materials of traffic engineering in Hubei Province from october 2022 to november 2022 [J].Hubei Transportation Engineering Cost Information,2022 (6):61-101.
[22]刘连战,刘晓东,邓新安,等.公路工程建设期碳排放测算标准(试行):Q/CCCG GL 105—2022 [S].北京:中国交通建设集团有限公司,2022.LIU Lianzhan,LIU Xiaodong,DENG Xin ’an,et al.Standard of carbon emission calculation for highway engineering:Q/CCCG GL 105—2022 [S].Beijing:China Communications Construction Group Co.,Ltd.,2022.
[23]刘连战,刘晓东,李英俊,等.公路工程碳排放预算定额(试行):Q/CCCG GL 107—2022 [S].北京:中国交通建设集团有限公司,2022.LIU Lianzhan,LIU Xiaodong,LI Yingjun,et al.Budget quota for carbon emissions in highway engineering:Q/CCCG GL 107—2022 [S].Beijing:China Communications Construction Group Co.,Ltd.,2022.

Share

COinS