Abstract

In mountainous regions,high fill slopes and bridge structures are common due to topographical limitations,often leading to difficulties in transporting prefabricated bridge components.To address this situation,this paper proposed arranging a sunken precast beam yard on high fill roadbeds.The research analyzed the primary factors of roadbed settlement and deformation,applied multiple deformation control measures to manage the deformation of high fill roadbeds and the precast beam yard,and characterized their deformation through a three-dimensional numerical model analysis.The results show that replacing the lower soil layer with poor physical properties with a filler layer with better physical properties can effectively reduce the uneven settlement of the precast beam yard.After implementing settlement control measures,the overall settlement of the precast beam yard is approximately 20 mm,with uneven settlement limited to only 3 mm.The construction impact range of the precast beam yard on the underlying fill layer is similar to that of the beam yard area.

Publication Date

4-10-2025

DOI

10.14048/j.issn.1671-2579.2025.02.029

First Page

256

Last Page

263

Submission Date

April 2025

Reference

[1]狄琛,宋战平.格鲁吉亚公路隧道放坡位置优化 [J].现代隧道技术,2020,57(增刊 1):544-555.DI Chen,SONG Zhanping.Optimization of slope cutting position of the Georgian highway tunnel [J].Modern Tunnelling Technology,2020,57(sup 1):544-555.
[2]JI Z G,LI J H,ZHANG X H,et al.A quantitative assessment method for the correlation between rock mass basic quality and Protodyakonov coefficient [J].Frontiers in Earth Science,2023,11:1249866.
[3]牛彦平,孟旭,刘朋.山岭重丘区预制梁场建设技术探索应用分析 [J].建筑结构,2020,50(增刊 2):922-926.NIU Yanping,MENG Xu,LIU Peng.Exploration and application analysis of precast beam yard construction technology in mountainous and hilly areas [J].Building Structure,2020,50(sup 2):922-926.
[4]罗锦刚,徐仁智,刘玉超.山区高速公路预制梁场规划与设计 [J].公路,2018,63(10):145-148.LUO Jingang,XU Renzhi,LIU Yuchao.Planning and design of prefabricated beam yard of mountainous expressway [J].Highway,2018,63(10):145-148.
[5]黄松,洪宝宁,刘鑫,等.软基差异沉降对现浇梁质量影响数值模拟研究 [J].河北工程大学学报 (自然科学版 ),2019,36(1):1-5,16.HUANG Song,HONG Baoning,LIU Xin,et al.Numerical simulation study on the effect of uneven settlement on the quality of cast-in-place beam [J].Journal of Hebei University of Engineering (Natural Science Edition ),2019,36(1):1-5,16.
[6]高均昭,高璞,杜佐龙.填方路基中影响沉降的关键因素[J].水文地质工程地质,2008,35(4):88-92.GAO Junzhao,GAO Pu,DU Zuolong.The key factors affecting settlement in ground fillings [J].Hydrogeology & Engineering Geology,2008,35(4):88-92.
[7]冯忠居,王溪清,芦佳,等.山区加宽路基挡土墙现场试验及数值模拟分析 [J].重庆交通大学学报 (自然科学版 ),2019,38(11):69-75.FENG Zhongju,WANG Xiqing,LU Jia,et al.Field test and numerical simulation of retaining wall on widening subgrade in mountain area [J].Journal of Chongqing Jiaotong University (Natural Science ),2019,38(11):69-75.
[8]李国锋,李宁,刘乃飞,等.多年冻岩土区露天矿边坡局部稳定性探究 [J].西安理工大学学报,2019,35(1):53-61.LI Guofeng,LI Ning,LIU Naifei,et al.Local stability of open-pit coal mine slope in permafrost regions [J].Journal of Xi’an University of Technology,2019,35(1):53-61.
[9]杨三强,段士超,刘娜,等.黄土质高填方 路基沉降变形与预 测 [J].河 北 大 学 学 报 (自 然 科 学 版 ),2020,40(5):454-460.YANG Sanqiang,DUAN Shichao,LIU Na,et al.Settlement deformation and prediction of loess high fill subgrade [J].Journal of Hebei University (Natural Science Edition ),2020,40(5):454-460.
[10]陈国舟,杜子博,田浩东,等.竹筋格栅加固高陡沟壑黄土填方路基数值模拟研究 [J].公路,2024,69(1):1-8.CHEN Guozhou,DU Zibo,TIAN Haodong,et al.Numerical simulation of loess filled subgrade reinforced with bamboo grids in high and steep gullies [J].Highway,2024,69(1):1-8.
[11]许帅,敖江忠,杨元治,等.路基不均匀沉降对高速列车动力 学 性 能 影 响 分 析 [J].铁 道 标 准 设 计,2023,67(12):83-89.XU Shuai,AO Jiangzhong,YANG Yuanzhi,et al.Analysis of influence of uneven settlement of subgrade on dynamic performance of high-speed train [J].Railway Standard Design,2023,67(12):83-89.
[12]宋金华,要晓迪,杨涛.基于 Abaqus的PHC桩网复合地基沉降变形特性研究 [J].公路,2019,64(12):34-41.SONG Jinhua,YAO Xiaodi,YANG Tao.Research on settlement deformation characteristics of PHC pile-net composite foundation based on Abaqus [J].Highway,2019,64(12):34-41.
[13]程小亮,田文迪,郜梦棵,等.填石路基梁场硬化层利用技术与压实质量控制研究 [J/OL ].中外公路,1-16[2024 -03-18].http://kns.cnki.net/kcms/detail/ 43.1363.U.20240318.1530.003.html.CHENG Xiaoliang,TIAN Wendi,GAO Mengke,et al.Research on the utilization technology and compaction quality control of the hardened layer in the beam yard of rock-filled road base [J/OL ].Journal of China & Foreign Highway,1-16[2024 -03-18].http://kns.cnki.net/kcms/detail/43.1363.U.20240318.1530.003.html.
[14]王艳巧,李一雷,刘康,等.土工袋排列方式对砂性土质边坡加固影响试验研究 [J].岩土工程学报,2020,42(增刊2):208-213.WANG Yanqiao,LI Yilei,LIU Kang,et al.Experimental study on influences of inter-layered arrangements of soilbags on reinforcement of sandy soil slopes [J].Chinese Journal of Geotechnical Engineering,2020,42(sup 2):208-213.
[15]吴兵,梁瑶,李杰,等.注浆微型钢管桩组合结构在公路滑坡处治中的应用 [J/OL ].中外公路,1-10[2024 -04-23].http://kns.cnki.net/kcms/detail/ 43.1363.U.20240423.2006.006.html.WU Bing,LIANG Yao,LI Jie,et al.Application of grouting miniature steel tubular pile composite structure in the treatment of highway landslide [J/OL ].Journal of China & Foreign Highway,1-10[2024 -04-23].http://kns.cnki.net/kcms/detail/ 43.1363.U.20240423.2006.006.html.
[16]张俊,马洪林,朱浮声.银川绕城高速非典型软弱土路基处治方法与效果监测 [J].东北大学学报 (自然科学版 ),2011,32(10):1499 -1502,1516.ZHANG Jun,MA Honglin,ZHU Fusheng.Treating and monitoring lacustrine soft soil subgrade at Yinchuan City ring road [J].Journal of Northeastern University (Natural Science ),2011,32(10):1499 -1502,1516.
[17]潘隆武,张红波.填石路基施工过程沉降变形规律研究[J].公路,2014,59(7):52-56.PAN Longwu,ZHANG Hongbo.Study of settlement deformation rules for rock-filled subgrade during construction [J].Highway,2014,59(7):52-56.
[18]张硕,裴向军,黄润秋,等.黄土高填方坡体加载过程变形 -力 学 响 应 特 征 研 究 [J].工 程 地 质 学 报,2017,25(3):657-670.ZHANG Shuo,PEI Xiangjun,HUANG Runqiu,et al.Loading deformation process and mechanical characterisitcs of high fill loess slope [J].Journal of Engineering Geology,2017,25(3):657-670.
[19]中交第三公路工程局有限公司.公路路基施工技术规范:JTG/T 3610—2019 [S].北京:人民交通出版社股份有限公司,2019.CCCC Third Highway Engineering Bureau Co.,Ltd..Technical specifications for construction of highway subgrades:JTG/T 3610—2019 [S].Beijing:China Communications Press Co.,Ltd.,2019.
[20]孙开畅,刘林锋,明华军,等.不同粒径及级配对碎石料休止角影响的试验研究 [J].长江科学院院报,2016,33(8):91-95.SUN Kaichang,LIU Linfeng,MING Huajun,et al.Experimental research on the influence of particle size and gradation on repose angle of rockfill [J].Journal of Yangtze River Scientific Research Institute,2016,33(8):91-95.
[21]崔伟,吕高航,刘春阳.高速公路拓宽新路基差异沉降计算分析 [J].科学技术与工程,2017,17(34):326-331.CUI Wei,LYU Gaohang,LIU Chunyang.Computational analysis of differential settlement on new subgrade in express way widening [J].Science Technology and Engineering,2017,17(34):326-331.

Share

COinS