Abstract

Based on the engineering background of the open-cut section by the shield machine with overall movement in the rapid transformation project of Wanghai Road,Shenzhen City,the structural stress and economy of three types of section forms under construction and operation conditions were analyzed to determine the optimal section design.The load-structure model was used to analyze the parameters affecting the internal force of the optimal section.The research results show that the top and bottom plates and side walls in the scheme with ribs set at the corner (scheme 3) have uniform force,and force during the construction period is close to that during the operation period.The scheme has the most economic and reasonable structural forms and is the optimal one.Setting uplift piles on the bottom plate solves the problem of anti-floating problem of tunn el structure,reduces the bending moment of the bottom plate,and optimizes the force conditions of the bottom plate.Under constant rib spacing,as the rib size gradually increases,the bending moment of the tunnel top plate support and mid-span position gradually decreases.The length and width of the rib have a more significant impact on the force on the top plate than the thickness of the rib.The optimal rib size is 6 m × 6 m × 1 m.

Publication Date

2-22-2025

DOI

10.14048/j.issn.1671-2579.2025.01.025

First Page

204

Last Page

211

Submission Date

March 2025

Reference

[1]雷亚峰,何修义.明挖隧道施工期间下方共线地铁盾构区间上浮控制技术:以深圳市桂庙路快速化改造工程为例[J].隧道建设 (中英文 ),2019,39(11):1888 -1897.LEI Yafeng,HE Xiuyi.Floating control technology of lower collinear metro shield section during cut-and-cover tunnel construction:A case study of rapid rehabilitation project on Guimiao Road in Shenzhen [J].Tunnel Construction,2019,39(11):1888 -1897.
[2]高颖.231省道某路段快速化改造工程结构设计分析 [J].交通世界,2022 (19):83-86.GAO Ying.Structural design analysis of a section of 231 provincial highway for rapid reconstruction project [J].TranspoWorld,2022 (19):83-86.
[3]史昊.银川沈阳西路快速化改造总体设计研究 [J].中国水运,2022 (2):144-146.SHI Hao.Study on the overall design of rapid transformation of Shenyang West Road in Yinchuan [J].China Water Transport,2022 (2):144-146.
[4]丁楠.徐州市三环南路快速化改造工程设计 [J].城市道桥与防洪,2022 (1):22-26,11.DING Nan.Design of Xuzhou south ring Ⅲ road expressway reconstruction project [J].Urban Roads Bridges & Flood Control,2022 (1):22-26,11.
[5]佟彬,张斌,朱汉标,等.双模盾构土压模式下下穿珠江断裂带开挖面稳定性研究 [J].中外公路,2024,44(5):232-240.TONG Bin,ZHANG Bin,ZHU Hanbiao,et al.Stability of excavation face of double-mode shield in earth pressure mode crossing fault zone of Pearl River [J].Journal of China & Foreign Highway,2024,44(5):232-240.
[6]刘勇,周怡晟,索晓明,等.盾构下穿高铁路基变形规律模型试验研究 [J].岩土力学,2023,44(4):941-951.LIU Yong,ZHOU Yisheng,SUO Xiaoming,et al.Model test on the deformation law of shield tunnel underpassing high speed railway roadbed [J].Rock and Soil Mechanics,2023,44(4):941-951.
[7]陈文明.快速路互通立交合流区交通冲突预测与安全评价研究 [D].西安:长安大学,2021.CHEN Wenming.Research on traffic conflict prediction and safety assessment method in merging area of expressway interchange [D].Xi’an:Chang’an University,2021.
[8]杨志豪,丁鹏飞,邹光炯.重庆地铁暗挖车站盾构过站方式研究及实践 [J].隧道建设 (中英文 ),2021,41(2):267-273.YANG Zhihao,DING Pengfei,ZOU Guangjiong.Research and practice of shield passing through mined metro station in Chongqing,China [J].Tunnel Construction,2021,41(2):267-273.
[9]朱朋金,赵康林,肖利星.TBM侧向平移、空推新设备的研发及应用 [J].隧道建设 (中英文 ),2020,40(3):417-425.ZHU Pengjin,ZHAO Kanglin,XIAO Lixing.Development and application of equipment for lateral moving and advancing without load of TBM [J].Tunnel Construction,2020,40(3):417-425.
[10]姜晓春.轨道交通盾构在非平整车站底板上的快速过站技术 [J].中国市政工程,2019 (6):40-42,103-104.JIANG Xiaochun.Rapid transit stop technology of rail transit shield on uneven station floor [J].China Municipal Engineering,2019 (6):40-42,103-104.
[11]刘汉东,张亚峰,刘海宁,等.水压作用下超大直径泥水盾构掌子面主动破坏模式研究 [J].中外公路,2020,40(1):185-190.LIU Handong,ZHANG Yafeng,LIU Haining,et al.Active failure mode of slurry shield-driven tunnel face with super large diameter under hydraulic pressure [J].Journal of China & Foreign Highway,2020,40(1):185-190.
[12]邓彬,顾小芳.盾构过空推段施工关键技术研究 [J].现代隧道技术,2012,49(2):54-58,64.DENG Bin,GU Xiaofang.Study of key techniques for a shield machine passing through a mined tunnel [J].Modern Tunnelling Technology,2012,49(2):54-58,64.
[13]李光山.超大直径泥水盾构矿山法隧道接收及空推技术研究 [J].价值工程,2020,39(16):99-101.LI Guangshan.Study on receiving and air-pushing technology of super-large diameter slurry shield mine tunnel [J].Value Engineering,2020,39(16):99-101.
[14]周禾,张庆贺,徐飞.盾构通过矿山法隧道段数值模拟研究[J].铁道建筑,2011,51(1):36-40.ZHOU He,ZHANG Qinghe,XU Fei.Numerical simulation study of shield machine passes through the mine method tunnel section [J].Railway Engineering,2011,51(1):36-40.
[15]胡安徽.盾构机过暗挖隧道平移技术研究 [J].中国设备工程,2019 (20):166-167.HU Anhui.Research on translation tehchnology of shield machine through undercover tunnel [J].China Plant Engineering,2019 (20):166-167.
[16]张子龙,姜谙男,于海,等.大跨度暗挖地铁车站拱盖法施工力学响应分析 [J].现代隧道技术,2021,58(3):139-146.ZHANG Zilong,JIANG Annan,YU Hai,et al.Analysis of the mechanical response in the construction of large-span mined metro stations by the arch-cover method [J].Modern Tunnelling Technology,2021,58(3):139-146.
[17]彭海中.拱盖法关键技术在地铁施工中的应用 [J].工程技术研究,2021,6(12):33-35.PENG Haizhong.Application of key technology of arch cover method in subway construction [J].Engineering and Technological Research,2021,6(12):33-35.
[18]杨旭.明挖法隧道标准矩形结构与折板拱结构选取分析[J].北方交通,2021 (3):78-82.YANG Xu.Analysis on selection of standard rectangular structure and folded plate arch structure of tunnel with open cut method [J].Northern Communications,2021 (3):78-82.
[19]曹文宏,申伟强.盾构法道路隧道工程中出入口匝道的设置 [J].地下工程与隧道,2013 (3):1-9,64.CAO Wenhong,SHEN Weiqiang.Setup of access and exit ramps for urban shield road tunnels [J].Underground Engineering and Tunnels,2013 (3):1-9,64.
[20]陈文明.大直径盾构机刀盘尺寸参数检测 [J].自动化应用,2021 (10):154-157.CHEN Wenming.Inspection of cutter head size parameters of large-diameter shield machine [J].Automation Application,2021 (10):154-157.
[21]姚坚.城市明挖道路隧道结构设计方法分析与研究 [J].城市道桥与防洪,2014 (7):384-387,28.YAO Jian.Analysis and study on design method of urban excavated road tunnel structure [J].Urban Roads Bridges & Flood Control,2014 (7):384-387,28.
[22]宋晓龙.大断面双层明挖隧道装配现浇组合式衬砌抗震性能分析 [D].天津:天津大学,2018.SONG Xiaolong.Seismic performance analysis of prefabricated and cast-in-place combined lining for double-layer open-cut tunnel with large section [D].Tianjin:Tianjin Unive rsity,2018.