Given the problems of narrow construction sites, difficult construction organization, and high safety and quality risks faced in the construction of bridges in steep canyon regions of mountainous areas, this paper carried out research on key technologies for bridge construction in mountainous areas based on the Yellow River Three Gorges Bridge of the Jiyuan‒Xin’an Expressway. For the excavation of deep and large anchorage foundation pits in mountainous areas, a technical scheme of “loosening controlled blasting combined mainly with mechanical excavation and supplemented by manual excavation” was adopted. As this project is a single-tower single-span ground-anchored rotating-cable suspension bridge, the technologies of cable strand folding and coiling and cable strand pre-bending forming were studied and applied. To address the common problems of erecting super-heavy steel girders in mountainous areas, construction technologies such as single-side site overall assembly and bridge deck section-divided girder storage and transportation were adopted; moreover, a construction process simulation analysis was conducted on the steel girder erection to seek the optimal scheme for main girder erection. The research shows that the technologies investigated in this paper have been implemented and applied, which demonstrates that they are not only advanced and efficient but also significantly reduce construction costs, providing a useful reference for the future construction of bridges in mountainous areas with complex terrains.

Publication Date

6-27-2026

DOI

10.14048/j.issn.1671-2579.2026.03.021

First Page

194

Last Page

200

Submission Date

June 2026

Reference

[1]陈平,方伏浪,丁仕洪.玉磨铁路元江特大桥钢桁梁悬臂架设关键技术 [J].桥梁建设,2021,51(5):123-129.CHEN Ping,FANG Fulang,DING Shihong.Key cantilever erection techniques for steel truss girder of Yuanjiang bridge of Yuxi ‒ Mohan railway [J].Bridge Construction,2021,51(5):123-129.
[2]李陆平,赵鹍鹏,冯广胜,等.湖北燕矶长江大桥上游侧猫道施工关键技术 [J].桥梁建设,2025,55(6):1-7.LI Luping,ZHAO Kunpeng,FENG Guangsheng,et al.Key construction techniques for upstream catwalk of Yanji Changjiang River bridge in Hubei province [J].Bridge Construction,2025,55(6):1-7.
[3]杨胜,樊小伟.山区钢桁架悬索桥设计与施工 [J].中外公路,2021,41(6):141-144.YANG Sheng,FAN Xiaowei.Design and constructions of steel truss suspension bridge in mountainous area [J].Journal of China & Foreign Highway,2021,41(6):141-144.
[4]张剑锋,徐向东,蓝先林,等.山区大跨径钢桁梁悬索桥抗震性能与减震优化研究 [J].世界桥梁,2025,53(6):75-83.ZHANG Jianfeng,XU Xiangdong,LAN Xianlin,et al.Research on seismic performance and vibration mitigation optimization for long-span steel truss suspension bridge in mountainous area [J].World Bridges,2025,53(6):75-83.
[5]毛伟琦,李小珍,王翔.大跨山区铁路悬索桥钢桁梁智能吊装系统研究 [J].铁道工程学报,2024,41(3):52-58.MAO Weiqi,LI Xiaozhen,WANG Xiang.Research of intelligent hoisting system for steel truss girder of long-span railway suspension bridge in mountain area [J].Journal of Railway Engineering Society,2024,41(3):52-58.
[6]陈常松,吴俊杰.钢桁梁悬索桥加劲梁节段安装连接方式研究 [J].中外公路,2024,44(5):143-148.CHEN Changsong,WU Junjie.Installation and connection mode of stiffening beam segment of steel truss suspension bridge [J].Journal of China & Foreign Highway,2024,44(5):143-148.
[7]邵广淼,潘权,颜东煌,等.大跨径钢桁梁悬索桥加劲梁吊装施工节段连接方式研究 [J].中外公路,2024,44(6):191-198.SHAO Guangmiao,PAN Quan,YAN Donghuang,et al.Segment connection mode for stiffening girder hoisting construction of long-span steel truss girder suspension bridge [J].Journal of China & Foreign Highway,2024,44(6):191-198.
[8]李明欢,张大兵.虎跳峡金沙江大桥钢桁梁施工技术 [J].施工技术,2021,50(12):72-75.LI Minghuan,ZHANG Dabing.Construction technology of steel truss girder of Jinsha River bridge of Tiger- Leaping Gorge [J].Construction Technology,2021,50(12):72-75.
[9]舒大勇,王建文,夏赞良,等.大跨度悬索桥钢桁梁架设方法对比分析 [J].施工技术,2018,47(增刊 1):1193 -1196.SHU Dayong,WANG Jianwen,XIA Zanliang,et al.Comparison and analysis of erection method for steel truss girder of large span suspension bridge [J].Construction Technology,2018,47(sup 1):1193 -1196.
[10]河南黄河勘测设计研究院.济源至新安高速公路黄河特大桥防洪评价报告 [R].郑州:河南黄河勘测设计研究院,2020.Yellow River Engineering Consulting Co.,Ltd..Flood control evaluation report of Yellow River bridge on Jiyuan to Xin’an expressway [R].Zhengzhou:Yellow River Engineering Consulting Co.,Ltd.,2020.
[11]薛有利,何博文,林阳.黄河三峡大桥桥型方案比选 [J].桥梁建设,2023,53(增刊 1):134-139.XUE Youli,HE Bowen,LIN Yang.Bridge type selection for Yellow River Three Gorges bridge [J].Bridge Construction,2023,53(sup 1):134-139.
[12]邓明超.山区峡谷悬索桥主梁安设工艺 [J].中国公路,2019 (3):114-115.DENG Mingchao.Installation technology of main girder of suspension bridge in mountainous canyon [J].China Highway,2019 (3):114-115.
[13]陈涛.三主桁钢梁两节间大节段架设关键技术 [J].桥梁建设,2020,50(6):8-13.CHEN Tao.Key erection techniques for two-panel large segments of three-main-truss steel girder [J].Bridge Construction,2020,50(6):8-13.
[14]周杜,刘武,石柱.悬索桥钢桁加劲梁架设施工关键技术研究 [J].中外公路,2019,39(3):129-134.ZHOU Du,LIU Wu,SHI Zhu.Research on key technologies of steel truss stiffening girder erection of suspension bridge [J].Journal of China & Foreign Highway,2019,39(3):129-134.
[15]朱红明,程海潜,李清,等.大节段钢桁梁悬索桥主梁架设 的 窗 口 铰 接 法 研 究 [J].中 外 公 路,2021,41(6):120-123.ZHU Hongming,CHENG Haiqian,LI Qing,et al.Window hinged method for erecting main girder of long-span steel truss suspension bridge [J].Journal of China & Foreign Highway,2021,41(6):120-123.
[16]张海顺.大跨度钢桁梁悬索桥临时连接方式分析研究[J].土木工程学报,2020,53(12):98-105.ZHANG Haishun.Analysis on temporary connection mode of the large-span steel truss girder suspension bridge[J].China Civil Engineering Journal,2020,53(12):98-105.
[17]熊邵辉,钱锋,程军委,等.非对称大跨度悬索桥主梁吊装顺序优化 [J].中外公路,2022,42(6):94-99.XIONG Shaohui,QIAN Feng,CHENG Junwei,et al.Optimization of main girder hoisting sequence of asymmetric long-span suspension bridge [J].Journal of China & Foreign Highway,2022,42(6):94-99.
[18]廖文涛.大跨径悬索桥大节段钢桁梁整体架设施工控制关键技术研究 [D].武汉:武汉工程大学,2020.LIAO Wentao.Research on key issues of construction controlling for the integral erection of large section steel truss girder of long-span suspension bridge [D].Wuhan:Wuhan Institute of Technology,2020.

Share

COinS