Abstract
In view of the poor traceability and low accuracy of the commonly used asphalt pavement construction methods at present, a research method for asphalt pavement construction simulation technology based on BIM was proposed. The basic models of the asphalt pavement construction stage were developed based on the Revit platform, including the construction vehicle model, three-dimensional geological model, etc., making the construction process visual and interactive. 3D simulation of construction animation based on Navisworks software, combined with the creation and application of features, can effectively avoid conflicts in advance. This paper expanded and deepened the application of BIM technology in the construction of asphalt pavement in road engineering, effectively promoting the development of information-based construction of asphalt pavement.
Publication Date
6-18-2022
DOI
10.14048/j.issn.1671-2579.2022.03.008
First Page
43
Last Page
47
Submission Date
May 2025
Recommended Citation
Kexin, Liu; Min, Xu; Xu, Li; Fengyang, Liu; and Ruiqi, Chang
(2022)
"Application Research on BIM Technology in Construction Simulation of Asphalt Pavement,"
Journal of China & Foreign Highway: Vol. 42:
Iss.
3, Article 8.
DOI: 10.14048/j.issn.1671-2579.2022.03.008
Available at:
https://zwgl1980.csust.edu.cn/journal/vol42/iss3/8
Reference
[1] 宋爱苹, 徐杰伟. 基于BIM技术的道路信息模型参数化构建研究[J]. 公路工程, 2017, 42(4): 337-341. SONG Aiping, XU Jiewei. Research on road parametric information model based on BIM technology[J]. Highway Engineering, 2017, 42(4): 337-341. [2] 汤易之. 基于BIM的智慧工地管理研究[J]. 价值工程, 2020, 39(1): 102-104. TANG Yizhi. Research on smart site management based on BIM[J]. Value Engineering, 2020, 39(1): 102-104. [3] 张文胜, 吴强, 祁平利, 等. BIM与3DGIS的集成技术及在铁路桥梁施工中的应用[J]. 中国铁道科学, 2019, 40(6): 45-51. ZHANG Wensheng, WU Qiang, QI Pingli, et al. Integration technology of BIM and 3DGIS and its application in railway bridge construction[J]. China Railway Science, 2019, 40(6): 45-51. [4] 包胜, 沈勇, 李鹏世, 等. 基于BIM技术的施工安全管理应用体系[J]. 施工技术, 2019, 48(18): 38-40, 110. BAO Sheng, SHEN Yong, LI Pengshi, et al. Construction safety management application system based on BIM technology[J]. Construction Technology, 2019, 48(18): 38-40, 110. [5] 翟博文, 张树理, 白杰. 基于BIM的施工项目部成本控制流程优化[J]. 施工技术, 2019, 48(18): 47-51, 63. ZHAI Bowen, ZHANG Shuli, BAI Jie. Optimization of cost control process in construction project department based on BIM[J]. Construction Technology, 2019, 48(18): 47-51, 63. [6] TANG F L, MA T, ZHANG J H, et al. Integrating three-dimensional road design and pavement structure analysis based on BIM[J]. Automation in Construction, 2020, 113: 103152. [7] KHANZADI M, SHEIKHKHOSHKAR M, BANIHASHEMI S. BIM applications toward key performance indicators of construction projects in Iran[J]. International Journal of Construction Management, 2020, 20(4): 305-320. [8] 周恒宇. 基于Revit的水电工程族库框架体系研究[J]. 水电站设计, 2019, 35(4): 55-57. ZHOU Hengyu. Research on clan bank framework system of hydropower project based on revit[J]. Design of Hydroelectric Power Station, 2019, 35(4): 55-57. [9] GODINHO M, MACHETE R, PONTE M, et al. BIM as a resource in heritage management: an application for the National Palace of Sintra, Portugal[J]. Journal of Cultural Heritage, 2020, 43: 153-162. [10] 周游, 陈建丰. 基于BIM技术的道路工程模型建立及应用[J]. 公路交通技术, 2018, 34(3): 29-32, 38. ZHOU You, CHEN Jianfeng. Construction and application of road engineering model based on BIM technology[J]. Technology of Highway and Transport, 2018, 34(3): 29-32, 38. [11] KOUTAMANIS A. Dimensionality in BIM: Why BIM cannot have more than four dimensions[J]. Automation in Construction, 2020, 114: 103153. [12] 杜文辉. 建筑施工项目管理中BIM技术的应用研究[J]. 价值工程, 2019, 38(34): 280-281. DU Wenhui. Application research of BIM technology in construction project management[J]. Value Engineering, 2019, 38(34): 280-281. [13] SONG S Y,ERIC Marks. Construction site path planning optimization through BIM[C].Computing in Civil Engineering 2019:Visualization, Information Modeling, and Simulation, 2019. [14] BOLSHAKOVA V, GUERRIERO A, HALIN G. Identifying stakeholders’ roles and relevant project documents for 4D-based collaborative decision making[J]. Frontiers of Engineering Management, 2020, 7(1): 104-118. [15] MAZARS T, FRANCIS A. Chronographical spatiotemporal dynamic 4D planning[J]. Automation in Construction, 2020, 112: 103076. [16] 黄晚清, 游宏, 陆阳. 热压式沥青混凝土路面施工关键控制参数的试验模拟[J]. 公路, 2015, 60(11): 10-15. HUANG Wanqing, YOU Hong, LU Yang. Experimental simulation on key control parameters for hot rolled asphalt pavement construction[J]. Highway, 2015, 60(11): 10-15.