Abstract
To obtain a better method for simulating prestressed reinforcement in the segment model analysis of the anchorage zone of towers on a cable-stayed bridge, this paper adopted Ansys to conduct segment model analysis on the anchorage zone of towers on a highway-railway cable-stayed bridge. In the model building, the entity segmentation method and constraint equation method were employed to simulate prestressed reinforcement. By comparing the stress differences in key parts of the tower body using two different methods, the reasons and patterns behind the differences were analyzed.
Publication Date
8-18-2022
DOI
10.14048/j.issn.1671-2579.2022.04.018
First Page
101
Last Page
106
Submission Date
May 2025
Recommended Citation
Songsong, SUN and Ziyun, CHEN
(2022)
"Research on Simulation of the Prestressed Reinforcement in Segment Model Analysis in Anchorage Zone of Cable-Stayed Bridge Tower,"
Journal of China & Foreign Highway: Vol. 42:
Iss.
4, Article 18.
DOI: 10.14048/j.issn.1671-2579.2022.04.018
Available at:
https://zwgl1980.csust.edu.cn/journal/vol42/iss4/18
Reference
[1] 魏奇芬, 叶文海, 范史文, 等. 大跨度斜拉桥混凝土索塔锚固区理论与设计的研究进展综述[J]. 现代交通技术, 2010, 7(6): 45-48. WEI Qifen, YE Wenhai, FAN Shiwen, et al. New advance of theory and design in cable-pylon anchorage zone of long-span cable-stayed bridge[J]. Modern Transportation Technology, 2010, 7(6): 45-48. [2] 王新敏. ANSYS工程结构数值分析[M]. 北京: 人民交通出版社, 2007.WANG Xinmin. Numerical analysis of ANSYS engineering structure[M]. Beijing: China Communications Press, 2007. [3] 赵曼, 王新敏, 高静. 预应力混凝土结构有限元数值分析[J]. 石家庄铁道学院学报, 2004, 17(1): 84-88. ZHAO Man, WANG Xinmin, GAO Jing. FEM numerical analysis of prestressed concrete structure[J]. Journal of Shijiazhuang Railway Institute, 2004, 17(1): 84-88. [4] 何美仲, 王敏丰, 董秀文. 普通钢筋与预应力筋在ANSYS中的实现方法的探讨[J]. 中国高新技术企业, 2007(12): 158, 162. HE Meizhong, WANG Minfeng, DONG Xiuwen. Discussion on the realization method of ordinary steel bar and prestressed steel bar in ANSYS[J]. China High Technology Enterprises, 2007(12): 158, 162. [5] 赵志刚. 紫金斜拉桥索塔锚固段局部应力分析与试验研究[D]. 长沙: 中南大学, 2007. ZHAO Zhigang. Local stress analysis and experimental study on anchorage section of pylon of Zijin cable-stayed bridge[D]. Changsha: Central South University, 2007. [6] 万利军. 斜拉桥索塔锚固区塔壁环向应力体系研究[D]. 哈尔滨: 东北林业大学, 2007. WAN Lijun. Study on circumferential stress system of tower wall in anchorage zone of cable-stayed bridge tower[D]. Harbin: Northeast Forestry University, 2007. [7] 余浪. 斜拉桥锚固区应力分析研究[D]. 成都: 西南交通大学, 2006. YU Lang. Stress analysis of anchorage zone of cable-stayed bridge[D]. Chengdu: Southwest Jiaotong University, 2006. [8] 龙琼, 熊焱. 曲线预应力的有限元模拟[J]. 森林工程, 2007, 23(4): 70-72.LONG Qiong, XIONG Yan. Simulation of the curved prestressing force using finite element method[J]. Forest Engineering, 2007, 23(4): 70-72. [9] 孙艳, 马崇亮. 预应力混凝土结构在ANSYS中的实现与比较[J]. 山西建筑, 2010, 36(6): 52-53. SUN Yan, MA Chongliang. The implementation and comparison of the prestressed concrete structure in ANSYS[J]. Shanxi Architecture, 2010, 36(6): 52-53. [10] 李律,钱济章,李敦.基于ANSYS的预应力筋数值模拟 [J].公路工程,2007,32(4):177-183. Li Lü, Qian Jizhang, Li Dun. Numerical Simulation of Prestressed Tendons Based on ANSYS [J]. Highway Engineering, 2007, 32(4): 177-183. [11] 肖勇刚, 黄炎, 谢鹏. 斜拉桥索塔锚固区节段足尺模型试验研究[J]. 中外公路, 2012, 32(5): 154-159. XIAO Yonggang, HUANG Yan, XIE Peng. Experimental study on full-scale model of anchorage zone of cable-stayed bridge pylon[J]. Journal of China & Foreign Highway, 2012, 32(5): 154-159. [12] 刘超, 徐书缘, 孙利军, 等. 斜拉桥索塔锚固区环向预应力布置形式研究[J]. 世界桥梁, 2018, 46(5): 7-12. LIU Chao, XU Shuyuan, SUN Lijun, et al. Study of looped prestressing arrangement in cable-pylon anchor zone of cable-stayed bridge[J]. World Bridges, 2018, 46(5): 7-12.