Abstract

Chishi Large Bridge along the Rucheng–Chenzhou Expressway is a four-tower, double-cable plane, and prestressed concrete cable-stayed bridge with a span of (165 +3 × 380 +165) m, with the highest main tower of 286.63 m. The volume of the heaviest beam section 1# block reaches 269.2 m3, and the height difference between the main beam and the ground is about 185 m. The main beam of the bridge adopts five key technologies, including 0# block construction technology under multiple constraints, super-large front fulcrum bucket hanging construction with 7 600 kN bearing force, unconstrained closure technology of side span, incremental launching and closure technology of mid-span and sub-mid-span, vertical downstay cable +TMD main beam wind resistance research, to solve the technical problems of the construction of ultra-high and overweight prestressed concrete main beams of the bridge. It can provide reference for the construction of the main beam of the same type of cable-stayed bridge.

Publication Date

1-18-2024

DOI

10.14048/j.issn.1671-2579.2022.06.017

First Page

99

Last Page

104

Submission Date

May 2025

Reference

[1] 苏潇阳, 康厚军, 丛云跃, 等. 不同斜拉索模型对多塔斜拉桥力学性能的影响[J]. 公路工程, 2017, 42(2): 42-46, 66.SU Xiaoyang, KANG Houjun, CONG Yunyue, et al. Influence of different cable models on mechanical performance of multi-tower cable-stayed bridge[J]. Highway Engineering, 2017, 42(2): 42-46, 66. [2] 庞杰, 康厚军, 王晚华, 等. 多塔斜拉桥中的共振模式研究[J]. 公路工程, 2017, 42(2): 56-62. PANG Jie, KANG Houjun, WANG Wanhua, et al. Study on the resonance mode of multi-tower cable-stayed bridge[J]. Highway Engineering, 2017, 42(2): 56-62. [3] 潘传宗, 任雷. 单箱多室现浇箱梁模板整体吊装工艺设计与施工[J]. 施工技术, 2018, 47(S4): 426-429.PAN Chuanzong, REN Lei. Design and construction of integral hoisting technology for single box and multi-chamber cast-in-place box girder formwork[J]. Construction Technology, 2018, 47(S4): 426-429. [4] 杨培诚, 陈卡拉. 赤石特大桥双面双曲线形主塔施工技术[J]. 中外公路, 2013, 33(5): 146-148.YANG Peicheng, CHEN (KaQia)(La). Journal of China & Foreign Highway, 2013, 33(5): 146-148. [5] 龚美, 董乐安, 吴明威, 等. 多约束条件下大桥0号块支架安拆技术[J]. 中国港湾建设, 2017, 37(9): 66-69.GONG Mei;DONG Lean;WU Mingwe, et al. Installation and demolition technology of No.0 block support with multi-constraints[J]. China Harbour Engineering, 2017, 37(9): 66-69. [6] 江雄. 赤石特大桥主梁合龙方案研究[J]. 桥梁建设, 2016, 46(1): 117-121.JIANG Xiong. Study of closure schemes for main girder of Chishi bridge[J]. Bridge Construction, 2016, 46(1): 117-121. [7] 宫成, 刘志文, 谢钢, 等. 高墩大跨斜拉桥悬臂施工期风致振动控制[J]. 工程力学, 2015, 32(S1): 122-128.GONG Cheng, LIU Zhiwen, XIE Gang, et al. Wind-induced vibration control of long-span cable-stayed bridge with high piers during cantilever construction[J]. Engineering Mechanics, 2015, 32(S1): 122-128. [8] 尹学军 ,张宝才,沙曾.调谐质量减振器(TMD)在桥梁振动控制措施的理论与应用[C].第十届全国噪声与振动控 制工程学术会议论文集,2005. [8] Yin Xuejun, Zhang Baocai, Sha Zeng. Theory and Application of Tuned Mass Dampers (TMD) in Bridge Vibration Control [C]. Proceedings of the 10th National Conference on Noise and Vibration Control Engineering, 2005. [9] 陈政清, 黄智文, 王建辉, 等. 桥梁用TMD的基本要求与电涡流TMD[J]. 湖南大学学报(自然科学版), 2013, 40(8): 6-10.CHEN Zhengqing, HUANG Zhiwen, WANG Jianhui, et al. Basic requirements of tuned mass damper for bridges and the eddy current TMD[J]. Journal of Hunan University (Natural Sciences), 2013, 40(8): 6-10. [10] 张鸣祥, 王建国, 汪权. 大跨度桥梁多模态耦合颤振的TMD控制[J]. 计算力学学报, 2012, 29(3): 315-320.ZHANG Mingxiang, WANG Jianguo, WANG Quan. Multi-mode coupled flutter numerical simulation for TMD control of long-span bridges[J]. Chinese Journal of Computational Mechanics, 2012, 29(3): 315-320.

Share

COinS