Abstract
The local structure of the outer web of a cable-beam anchorage area and the steel anchor box sub-model of a long-span cable-stayed bridge were established by using the sub-model modeling technology of Ansys software, and the structural strength analysis was completed. The results show that the stress concentration of the steel anchor box in the cable-beam anchorage area is serious, and the maximum stress value exceeds the yield limit of the material. Therefore, according to the stress concentration area of the steel anchor box structure, the local structure is optimized. The improved scheme obviously reduces the stress concentration of the structure, and the research results can provide a reference for the design of the anchor box structure of the same type of bridge.
Publication Date
1-18-2024
DOI
10.14048/j.issn.1671-2579.2022.06.018
First Page
105
Last Page
108
Submission Date
May 2025
Recommended Citation
Datao, LI; Yan, LI; and Pengmin, LV
(2024)
"Analysis on Structural Strength of Anchor Box Based on Sub-Modeling,"
Journal of China & Foreign Highway: Vol. 42:
Iss.
6, Article 18.
DOI: 10.14048/j.issn.1671-2579.2022.06.018
Available at:
https://zwgl1980.csust.edu.cn/journal/vol42/iss6/18
Reference
[1] 严国敏. 现代斜拉桥[M]. 成都: 西南交通大学出版社, 1996.YAN Guomin. Modern cable-stayed bridges[M]. Chengdu: Southwest Jiaotong University Press, 1996. [2] 林元培. 斜拉桥[M]. 北京: 人民交通出版社, 1994.LIN Yuanpei. Cable-stayed bridge[M]. Beijing: China Communications Press, 1994. [3] 张清华, 李乔. 超大跨度钢箱梁斜拉桥索梁锚固结构试验研究[J]. 土木工程学报, 2011, 44(9): 71-80. ZHANG Qinghua, LI Qiao. Experiment study on cable-girder anchorage for super long-span cable-stayed bridges with steel box girders[J]. China Civil Engineering Journal, 2011, 44(9): 71-80. [4] 彭霞, 王行耐. 钢锚箱式索梁锚固区段有限元仿真分析[J]. 公路, 2009, 54(9): 28-34.PENG Xia, WANG Xingnai. Finite element analysis of cable-girder anchorage zone for cable-stayed bridge with steel anchor box[J]. Highway, 2009, 54(9): 28-34. [5] 万臻, 李乔. 大跨度斜拉桥索梁锚固区三维有限元仿真分析[J]. 中国铁道科学, 2006, 27(2): 41-45.WAN Zhen, LI Qiao. 3D finite element analysis of cable-girder anchorage zone for long-span cable-stayed bridge[J]. China Railway Science, 2006, 27(2): 41-45. [6] 颜海, 范立础. 大跨度斜拉桥索梁锚固中的非线性接触问题[J]. 中国公路学报, 2004, 17(2): 46-49.YAN Hai, FAN Lichu. Research on nonlinear contact problem of cable-beam anchorage for long-span cable-stayed bridge[J]. China Journal of Highway and Transport, 2004, 17(2): 46-49. [7] 吴冲, 韦杰鼎, 曾明根, 等. 上海长江大桥斜拉桥索梁锚固区静力试验研究[J]. 桥梁建设, 2007, 37(6): 30-33.WU Chong, WEI Jieding, ZENG Minggen, et al. Experimental study of static force in cable and girder anchor zone of cable-stayed bridge of Shanghai Changjiang River bridge[J]. Bridge Construction, 2007, 37(6): 30-33. [8] 满洪高, 李乔, 张育智. 斜拉桥索梁锚固区边界条件对结构受力的影响[J]. 实验力学, 2006, 21(2): 190-194.MAN Honggao, LI Qiao, ZHANG Yuzhi. The affection of boundary conditions to the structure’s stresses in the cable-girder anchorage zone of steel cable-stayed bridges[J]. Journal of Experimental Mechanics, 2006, 21(2): 190-194. [9] 华晓勇. 钢桥塔索辅梁桥锚固区新型钢锚箱受力分析[J]. 公路, 2020, 65(1): 75-81.HUA Xiaoyong. Stress analysis of a new type steel anchor box in steel pylon anchorage zone of cable-supported girder bridge[J]. Highway, 2020, 65(1): 75-81. [10] 吕文舒, 陈星烨, 张祖军. 钢箱梁斜拉桥索梁锚固区钢锚箱受力性能及结构局部优化研究[J]. 中外公路, 2020, 40(3): 173-176. LV Wenshu, CHEN Xingye, ZHANG Zujun. Steel box girder cable-stayed bridge cable beam anchorage zone steel anchor box mechanical performance and structure optimization research[J]. Journal of China & Foreign Highway, 2020, 40(3): 173-176. [11] 博嘉科技. 有限元分析软件——ANSYS融会与贯通[M]. 北京: 中国水利水电出版社, 2002. Bojia Information Technology Co.,Ltd. Finite element analysis software: integration and penetration of: ANSYS[M]. Beijing: China Water & Power Press, 2002. [12] 陈佳德. 大跨度连续梁拱组合桥拱脚局部受力分析[D]. 兰州: 兰州交通大学, 2013. CHEN Jiade. Local stress analysis of arch foot of long-span continuous beam-arch composite bridge[D]. Lanzhou: Lanzhou Jiatong University, 2013.