Abstract

Benqiao River Bridge of Ziling West Road in Changde City adopts a (90 + 90) m single-tower double-cable plane cable-stayed bridge with a shaped arch tower. The main tower adopts a concrete arch tower. The alignment is a shaped curve composed of the catenary line segment and elliptical arc segment, and the tower height is 71 m. The main beam adopts a prestressed concrete double-ribbed main beam section with a width of 40 m. The cable-stayed cables on both sides are arranged through cables and anchored to the main tower through cable saddles, with friction pile group foundation. The finite element analysis results of the whole and local solid model of the bridge show that the structure is safe and reliable.

Publication Date

1-18-2024

DOI

10.14048/j.issn.1671-2579.2022.06.021

First Page

118

Last Page

121

Submission Date

May 2025

Reference

[1] 罗志贤. 三拱塔斜拉桥合理状态确定及施工控制研究[D]. 长沙: 长沙理工大学, 2012. LUO Zhixian. Study on reasonable state determination and construction control of cable-stayed bridge with three arch towers[D]. Changsha: Changsha University of Science & Technology, 2012. [2] 王晓波,苏中海,周永明,等.双套拱塔斜拉桥施工技术的研究与应用[J] .建设科技,2012(S1) :126-127. [2] Wang Xiaobo, Su Zhonghai, Zhou Yongming, et al. Research and Application of Construction Technology for Double-Set Arch Pylon Cable-Stayed Bridges [J]. Construction Science and Technology, 2012(Suppl. 1): 126–127. [3] 李鑫, 梁力, 王福春, 等. 公路钢拱塔斜拉桥车致振动试验与数值分析[J]. 桥梁建设, 2011, 41(4): 37-40, 56.LI Xin, LIANG Li, WANG Fuchun, et al. Testing and numerical analysis of vehicle-induced vibration of a highway cable-stayed bridge with steel arch pylons[J]. Bridge Construction, 2011, 41(4): 37-40, 56. [4] 李鑫. 公路钢拱塔斜拉桥车致振动及地震响应研究[D]. 沈阳: 东北大学, 2011. LI Xin. Study on vehicle-induced vibration and seismic response of highway steel arch tower cable-stayed bridge[D]. Shenyang: Northeastern University, 2011. [5] 李冬, 朱巍志, 张哲. 双套拱塔斜拉桥索力张拉优化及控制[J]. 桥梁建设, 2012, 42(4): 107-112.LI Dong, ZHU Weizhi, ZHANG Zhe. Optimization and control of tensioning of cables of cable-stayed bridge with double-set arch pylons[J]. Bridge Construction, 2012, 42(4): 107-112. [6] 赵能亮. 拱塔斜拉桥施工跟踪仿真计算与试验分析[D]. 合肥: 合肥工业大学, 2014. ZHAO Nengliang. Simulation calculation and experimental analysis of construction tracking of arch tower cable-stayed bridge[D]. Hefei: Hefei University of Technology, 2014. [7] 雒建哲. 拱塔斜拉桥设计参数及几何非线性分析[D]. 长沙: 中南大学, 2011. LUO Jianzhe. Design parameters and geometric nonlinear analysis of arch tower cable-stayed bridge[D]. Changsha: Central South University, 2011. [8] 霍学晋, 韩立中. 异型拱桥的几何非线性分析[J]. 公路交通科技, 2013, 30(7): 46-53. HUO Xuejin, HAN Lizhong. Analysis on geometric nonlinearity of variant arch bridges[J]. Journal of Highway and Transportation Research and Development, 2013, 30(7): 46-53. [9] 郝翠, 王建国, 曹新垒. 拱塔斜拉桥预应力索塔锚固区节段应力分析[J]. 世界桥梁, 2010, 38(4): 43-46.HAO Cui, WANG Jianguo, CAO Xinlei. Stress analysis of segments of prestressed cable-to-pylon anchor zone of an arch pylon cable-stayed bridge[J]. World Bridges, 2010, 38(4): 43-46. [10] 郝翠, 王建国, 曹新垒. 拱塔斜拉桥索塔锚固区应力分析[J]. 合肥工业大学学报(自然科学版), 2011, 34(5): 739-742, 747.HAO Cui, WANG Jianguo, CAO Xinlei. Stress analysis of cable-pylon anchorage zones of an arch-tower cable-stayed bridge[J]. Journal of Hefei University of Technology (Natural Science), 2011, 34(5): 739-742, 747.

Share

COinS