Abstract
According to the engineering environment and functional requirements of highway bridges in mountainous areas, the design characteristics of continuous box girder bridges with variable widths and the technical difficulties of cast-in-place construction by support method were analyzed. Based on the engineering environment and structural design characteristics, the technical feasibility, safety, operability, and economy of various support systems such as full-hall support, beam-to-column support, and combined support, hoop (steel bar) or bullleg support with pier, and floor mold were analyzed. The composite full-hall support and beam-to-column support scheme was scientifically and reasonably selected, and its construction quality control points were introduced. In view of the economic difference between the steel formwork and the wood formwork system, the wood formwork system was recommended, and the influence of internal mold removal on the bridge structure was analyzed. Based on the advantages and disadvantages of the first and second pouring schemes of box girder concrete, the technical countermeasures for the construction quality control of reinforcement, concrete, and prestress of continuous box girder bridges with variable width on mountainous highways were described in detail.
Publication Date
1-18-2024
DOI
10.14048/j.issn.1671-2579.2022.06.027
First Page
146
Last Page
151
Submission Date
May 2025
Recommended Citation
Youming, LI; Xiohong, BAI; and Qifu, WANG
(2024)
"Design Featuresand Cast-in-Place Construction Technique of Support Methods of Continuous Box Girder for Mountain Road,"
Journal of China & Foreign Highway: Vol. 42:
Iss.
6, Article 27.
DOI: 10.14048/j.issn.1671-2579.2022.06.027
Available at:
https://zwgl1980.csust.edu.cn/journal/vol42/iss6/27
Reference
[1] 钟加峰, 张威. 贝雷梁钢管柱柱式支架在山区桥梁施工中的应用[J]. 山西建筑, 2016, 42(2): 175-177.ZHONG Jiafeng, ZHANG Wei. Application of bailey-beam steel-pipe column bearing in mountainous bridge construction[J]. Shanxi Architecture, 2016, 42(2): 175-177. [2] 余定军, 任军. 超高钢管桩支架在山区桥梁施工中的应用[J]. 铁道标准设计, 2008, 52(6): 47-49.YU Dingjun, REN Jun. Railway Standard Design, 2008, 52(6): 47-49. [3] 李燕. 浅析梁柱式支架法在大目溪互通C匝道桥高墩现浇连续箱梁中的应用[J]. 江西建材, 2016(12): 208-209.LI Yan. Jiangxi Building Materials, 2016(12): 208-209. [4] 曹新龙. 以角互通D匝道桥现浇箱梁施工技术[J]. 交通世界(运输 车辆), 2015(11): 50-52. CAO Xinlong. Construction technology of cast-in-place box girder of D ramp bridge with intersection angle[J]. Transpo World, 2015(11): 50-52. [5] 曹建, 刘伟煜. 贝雷梁钢管柱和盘扣式组合支架体系在山区桥梁中的应用[J]. 建材发展导向, 2018, 16(8): 87-91. CAO Jian, LIU Weiyu. Application of Bailey beam steel tube column and disc buckle combined support system in mountain bridges[J]. Development Guide to Building Materials, 2018, 16(8): 87-91. [6] 吴肇宇. 浅谈某山区公路桥梁高墩现浇箱梁支架施工技术[J]. 四川水泥, 2019(4): 43-44. WU Zhaoyu. Sichuan Cement, 2019(4): 43-44. [7] 毛昌庆, 彭鹏, 陈平. 山区高速公路匝道桥双抱箍支撑支架施工技术[J]. 施工技术, 2018, 47(2): 96-98. MAO Changqing, PENG Peng, CHEN Ping. Construction of the double hoop support bracket on the highway ramp bridge in mountainous area[J]. Construction Technology, 2018, 47(2): 96-98. [8] 张爱春. 匝道桥现浇连续箱梁施工支架方案设计[J]. 铁道建筑, 2006, 46(6): 5-6. ZHANG Aichun. Design of scarffold serving casting in situ continuous box girder of ramp bridge[J]. Railway Engineering, 2006, 46(6): 5-6. [9] 李萍. SPS桁架式门支架在高墩变截面现浇梁中的应用[J]. 公路交通科技(应用技术版), 2019, 15(7): 133-135.LI Ping. Application of SPS truss door support in cast-in-place beam with variable cross-section of high pier[J]. Journal of Highway and Transportation Research and Development, 2019, 15(7): 133-135. [10] 余思军,朱宇峰.现浇预应力混凝土弯箱梁2×35 m匝道桥优化分析[J] .交通科技 ,2012(1) :24-26. [10] Yu Sijun, Zhu Yufeng. Optimization Analysis of Cast-in-Situ Prestressed Concrete Curved Box Girder for a 2×35 m Ramp Bridge [J]. Transportation Science & Technology, 2012(1): 24–26. [11] 曾爱. 小半径曲线匝道桥梁设计优化探讨[J]. 山西科技, 2013, 28(2): 89-90. ZENG Ai. Probe into the design optimization of the bridge with small-radius curve-ramp[J]. Shanxi Science and Technology, 2013, 28(2): 89-90. [12] 包启航. 现浇单箱多室宽箱梁横梁受力特性研究[J]. 中外公路, 2018, 38(6): 109-112. BAO Qihang. Journal of China & Foreign Highway, 2018, 38(6): 109-112. [13] 中华人民共和国住房和城乡建设部37号令.危险性较大的分部分项工程安全管理规定[Z] ,2018. [13] Ministry of Housing and Urban-Rural Development of the People's Republic of China (Order No. 37). Safety Management Regulations for Hazardous Subdivision and Subitem Projects [Z], 2018. [14] 中华人民共和国住房和城乡建设部建办质〔2018〕31号文.关于实施《危险性较大的分部分项工程安全管理规定》有关问题的通知[Z] ,2018. [14] Ministry of Housing and Urban-Rural Development of the People's Republic of China (Document No. Jian-Ban-Zhi [2018] 31). Notice on Implementing the "Safety Management Regulations for Hazardous Subdivision and Subitem Projects" [Z], 2018. [15] 贺亚林, 赵煜成, 田启军. 桥梁现浇支架整体平移施工关键技术研究[J]. 中外公路, 2017, 37(3): 157-160. HE Yalin, ZHAO Yucheng, TIAN Qijun. Journal of China & Foreign Highway, 2017, 37(3): 157-160. [16] 中铁二局集 团 有 限 公 司 , 中 铁 二 十 四 局 集 团 有 限 公 司 . 铁路混凝 土 梁 支 架 法 现 浇 施 工 技 术 规 程 : TB 10110— 2011[S] . 北京 : 中国铁道出版社 ,2011. [16] China Railway Eryuan Engineering Group Co., Ltd., China Railway 24th Bureau Group Co., Ltd. Technical Specification for Cast-in-Situ Construction of Railway Concrete Beams Using Scaffolding Method: TB 10110–2011 [S]. Beijing: China Railway Publishing House, 2011. [17] 中交第一公路工程局有限公司.公路桥涵施工技术规范:JTG/T F50—2011[S].北京:人民交通出版社,2011. [17] China First Highway Engineering Co., Ltd. Technical Specifications for Construction of Highway Bridges and Culverts: JTG/T F50–2011 [S]. Beijing: People's Communications Press, 2011. [18] 宏润建设集团股份有限公司 . 钢管满堂支架预压技术规 程 :JGJ/T 194—2009[S] . 北 京 : 中 国 建 筑 工 业 出 版 社 , 2009. [18] Hongrun Construction Group Co., Ltd. Technical Code for Preloading of Steel Tube Full Scaffolding: JGJ/T 194–2009 [S]. Beijing: China Architecture & Building Press, 2009.