Abstract
Currently, the expressways under construction in Henan Province are mainly concentrated in the Funiu Mountain area in the west, such as Yaoshan–Luanchuan–Xixia Expressway, Xixia–Xichuan Expressway, Yingchi–Luanchuan Expressway, and Luanchuan–Lushi Expressway. These projects are characterized by complex terrain conditions, difficult design, large-scale engineering, and a cluster of long tunnels and grand bridges. Under such complex conditions, how to arrange the interchange reasonably and ensure the optimal project plan becomes the key point of successful project design. This paper summarized the typical characteristics of toll interchange in Funiu Mountain area in recent years and put forward the design process of design preparation, control factor analysis, scheme formulation, and determination of the optimal scheme. In addition, the stage design process of Jiguandong Interchange over the Luanchuan–Lushi Expressway in Henan Province was analyzed.
Publication Date
3-17-2023
DOI
10.14048/j.issn.1671-2579.2023.01.042
First Page
235
Last Page
239
Submission Date
March 2025
Recommended Citation
Jie, ZHANG; Qing, YANG; and Xiaolong, CHAI
(2023)
"Research on design process of toll interchange‐expressway in the area of Funiu Mountain,"
Journal of China & Foreign Highway: Vol. 43:
Iss.
1, Article 86.
DOI: 10.14048/j.issn.1671-2579.2023.01.042
Available at:
https://zwgl1980.csust.edu.cn/journal/vol43/iss1/86
Included in
Construction Engineering and Management Commons, Other Civil and Environmental Engineering Commons, Statistical Methodology Commons, Structural Materials Commons, Transportation Engineering Commons