Abstract

Compared with cable-stayed bridges with pure steel girders, the installation of a steel main girder of the steel⁃concrete composite girder cable⁃stayed bridge is more complicated, and the installation error control is more difficult. In this paper, the composite girder with a double box section was taken as the research object, and a finite element model was established to compare the installation methods of steel main girders. The best installation method was selected according to the principle of safety loading, and the causes of the installation errors of steel main girders were analyzed. The corresponding error control methods were proposed.

Publication Date

7-14-2023

DOI

10.14048/j.issn.1671-2579.2023.03.020

First Page

126

Last Page

133

Submission Date

March 2025

Reference

[1] 谭文鹏, 赵伟, 敖登榜, 等. 山区钢混组合梁斜拉桥创新施工技术[J]. 公路, 2022, 67(2): 138-143. TAN Wenpeng, ZHAO Wei, AO Dengbang, et al. Innovative construction technology of steel-concrete composite beam cable-stayed bridge in mountainous area[J]. Highway, 2022, 67(2): 138-143. [2] 陈亮, 张龙, 卢江波, 等. 基于梁格法的组合梁斜拉桥力学性能研究[J]. 湖南交通科技, 2021, 47(1): 99-102. CHEN Liang, ZHANG Long,LU Jiangbo, et al. Study on mechanical properties of composite girder cable stayed bridge based on grillage method[J]. Hunan Communication Science and Technology, 2021, 47(1): 99-102. [3] 刘双, 聂玉东, 张铭, 等. 钢-混组合梁斜拉桥现浇混凝土桥面板关键设计技术研究[J]. 公路, 2020, 65(7): 359-363. LIU Shuang, NIE Yudong, ZHANG Ming, et al. Research on key design technology of cast-in-place concrete deck of steel-concrete composite beam cable-stayed bridge[J]. Highway, 2020, 65(7): 359-363. [4] 黄辉,邱攀,幸思佳,等.摩洛哥梭形塔钢混组合梁斜拉桥建造技术[Z].中铁大桥局集团有限公司,2020. HUANG Hui, QIU Pan, XING Sijia, et al. Construction technology of steel-hybrid combined girder cable-stayed bridge with pike tower in Morocco [Z]. China Railway Bridge Bureau Group Corporation, 2020. [5] 郭健, 朱敏俊, 孙博, 等. 复杂格构式梁体三分力系数精细化计算分析[J]. 中国公路学报, 2019, 32(5): 80-87. GUO Jian, ZHU Minjun, SUN Bo, et al. Refined study on three-component force coefficients of complicated lattice girder[J]. China Journal of Highway and Transport, 2019, 32(5): 80-87. [6] 张东. 格构式混凝土梁的施工及其现浇支架的设计[J]. 四川水泥, 2022(10): 147-149. ZHANG Dong. Construction of lattice concrete beam and design of its cast-in-place support[J]. Sichuan Cement, 2022(10): 147-149. [7] 林建茂, 欧智菁, 林上顺, 等. 钢管混凝土格构式梁桥设计参数抗震研究[J]. 福建工程学院学报, 2017, 15(6): 549-554. LIN Jianmao, OU Zhijing, LIN Shangshun, et al. Research on seismic applicability of design parameters of continuous bridges with concrete-filled steel-tube latticed high-rise piers[J]. Journal of Fujian University of Technology, 2017, 15(6): 549-554. [8] 侯新宇. 格构式钢骨-钢管混凝土构件轴压性能及承载力计算方法研究[D]. 西安: 西安建筑科技大学, 2020. HOU Xinyu. Study on calculation method of axial compression performance and bearing capacity of lattice steel reinforced concrete-filled steel tubular members[D]. Xi’an: Xi’an University of Architecture and Technology, 2020. [9] 吕建锋. 港珠澳大桥九洲航道桥组合梁钢主梁制作关键技术[J]. 施工技术(中英文), 2021, 50(23): 28-31. LYU Jianfeng. Key fabrication technology of the steel main girder of the composite girder of Jiuzhou channel bridge in Hong Kong-Zhuhai-Macau bridge[J]. Construction Technology, 2021, 50(23): 28-31. [10] 刘治国. 港珠澳大桥组合梁钢主梁大节段制作关键技术研究[J]. 施工技术, 2017, 46(22): 33-36. LIU Zhiguo. Key prefabrication technology research on large segment composite main steel girder in Hong Kong-Zhuhai-Macao bridge[J]. Construction Technology, 2017, 46(22): 33-36. [11] 徐亮, 王辉平, 张胜利, 等. 舟山西堠门跨海大桥分体式钢箱梁制造预拼装线形控制技术[J]. 中国工程科学, 2010, 12(7): 43-46. XU Liang, WANG Huiping, ZHANG Shengli, et al. The technology of the figure of test assembling when building the steel box of Xihoumen suspension big bridge[J]. Engineering Sciences, 2010, 12(7): 43-46. [12] 颜东煌, 陈常松, 董道福, 等. 大跨度钢主梁斜拉桥的自适应无应力构形控制[J]. 中国公路学报, 2012, 25(1): 55-58+82. YAN Donghuang, CHEN Changsong, DONG Daofu, et al. Control of self-adaptive zero-stress configuration for long-span cable-stayed bridge with steel main girders[J]. China Journal of Highway and Transport, 2012, 25(1): 55-58+82. [13] 涂光亚, 石洋, 邹磊. 大跨度钢混组合梁斜拉桥钢主梁截面参数对成桥状态主梁受力敏感性分析[J]. 中外公路, 2022, 42(1): 108-115. TU Guangya, SHI Yang, ZOU Lei. Sensitivity analysis of section parameters of steel main girder of long-span cable-stayed bridge with steel-concrete composite girder on mechanical behavior of main girder in completion state[J]. Journal of China & Foreign Highway, 2022, 42(1): 108-115. [14] 吴炜, 孙东超, 颜爱华. 结合双主梁斜拉桥节段拼装与构件拼装比较[J]. 世界桥梁, 2011, 39(1): 20-23. WU Wei, SUN Dongchao, YAN Aihua. Comparison of segmental assembling and component assembling for cable-stayed bridge with twin composite main girders[J]. World Bridges, 2011, 39(1): 20-23. [15] 洪丽娟, 周仙通, 郭杰鑫, 等. 组合梁斜拉桥主梁双节段循环安装施工技术[J]. 世界桥梁, 2013, 41(5): 44-47. HONG Lijuan, ZHOU Xiantong, GUO Jiexin, et al. Construction technique of two-section circulating assembly for cable-stayed bridge with composite girder[J]. World Bridges, 2013, 41(5): 44-47. [16] 董道福. 超大跨径混合梁斜拉桥上部结构安装误差分析与控制[D]. 长沙: 长沙理工大学, 2011. DONG Daofu. Analysis and control of installation error of superstructure of super-long-span hybrid beam cable-stayed bridge[D]. Changsha: Changsha University of Science & Technology, 2011. [17] 张玉平, 徐先鹏, 李香梅, 等. 混合式组合梁斜拉桥参数分析与施工控制[J]. 中外公路, 2022, 42(3): 85-92. ZHANG Yuping, XU Xianpeng, LI Xiangmei, et al. Construction control and parametric analysis of cable-stayed bridge with hybrid composite beam[J]. Journal of China & Foreign Highway, 2022, 42(3): 85-92. [18] 张建民, 肖汝诚. 千米级斜拉桥施工过程中主梁的预转折角研究[J]. 计算力学学报, 2005, 22(5): 618-622. ZHANG Jianmin, XIAO Rucheng. Study on the prearranged angle of girders in construction state for a thousand-meter scale cable-stayed bridge[J]. Chinese Journal of Computational Mechanics, 2005, 22(5): 618-622. [19] ZHANG J X, ZHANG M J, JIANG X L, et al. Causes and control to lateral displacement of the main girder in the super-long-span cable-stayed bridge with transverse asymmetry dead load[J]. Structures, 2022, 37: 168-184. [20] 易云焜, 岳青, 严和仲. 叠合梁斜拉桥主梁施工工序方案比选[J]. 公路, 2012, 57(12): 36-38. YI Yunkun, YUE Qing, YAN Hezhong. Comparison and selection of construction process schemes for main girder of composite beam cable-stayed bridge[J]. Highway, 2012, 57(12): 36-38. [21] 梁全章. 钢-混组合梁斜拉桥主梁整体吊装受力分析[J]. 工程建设, 2018, 50(8): 39-44. LIANG Quanzhang. Stress analysis on overall lifting of main girder for cable-stayed bridge with steel-concrete composite girder[J]. Engineering Construction, 2018, 50(8): 39-44. [22] 秦顺全. 桥梁施工控制: 无应力状态法理论与实践[M]. 北京: 人民交通出版社, 2007. QIN Shunquan. Bridge construction control: theory and practice of stress-free state method[M]. Beijing: China Communications Press, 2007. [23] 韩春秀. 钢—混凝土组合梁徐变和收缩效应的理论与试验研究[D]. 昆明: 昆明理工大学, 2016. HAN Chunxiu. Theoretical and experimental study on creep and shrinkage effects of steel-concrete composite beams[D]. Kunming: Kunming University of Science and Technology, 2016. [24] GRANATA M F, LONGO G, RECUPERO A, et al. Construction sequence analysis of long-span cable-stayed bridges[J]. Engineering Structures, 2018, 174: 267-281. [25] 涂可瑜. 组合梁斜拉桥主梁的实用分析方法[D]. 大连: 大连理工大学, 2019. TU Keyu. Practical analysis method of main girder of composite beam cable-stayed bridge[D]. Dalian: Dalian University of Technology, 2019.

Share

COinS