Abstract
Bridges constructed between the 1960s and 1970s have been damaged to different degrees during operation due to excessive traffic flow and severe overloading of vehicles, and thus cannot meet the requirements for safe passage of vehicles and navigation. Therefore, they need to be demolished and rebuilt. To safely, economically and efficiently demolish the old bridges and rebuild them in-situ, this paper studied a design concept of integrated construction and demolition. Based on the Wudou Bridge demolition and reconstruction project in Foshan, the combination of theoretical analysis and computational simulation was utilized to conduct a multi-scheme study from the perspectives of economy, safety and construction periods after field investigation and site conditions. The results show that the scheme of employing the old bridge as a support for new bridge construction and then leveraging the new bridge to help the demolition of the old bridge after comprehensively considering demolition and construction can save the amount of construction supports for new bridges, especially the amount of water supports and platforms, with the construction measure cost for the whole bridge saved by 33.5%.
Publication Date
9-14-2023
DOI
10.14048/j.issn.1671-2579.2023.04.025
First Page
153
Last Page
157
Submission Date
March 2025
Recommended Citation
Huaqiang, LI
(2023)
"Key technology of demolition and reconstruction design of wudou bridge,"
Journal of China & Foreign Highway: Vol. 43:
Iss.
4, Article 25.
DOI: 10.14048/j.issn.1671-2579.2023.04.025
Available at:
https://zwgl1980.csust.edu.cn/journal/vol43/iss4/25
Reference
[1] 蒋跃飞, 何贤辉, 刘桐, 等. 双侧紧贴运营新桥的大型桥梁爆破拆除技术[J]. 工程爆破, 2019, 25(3): 32-42. JIANG Yuefei, HE Xianhui, LIU Tong, et al. The blasting demolition technology of large-scale bridge in close proximity to bilateral new operational bridges[J]. Engineering Blasting, 2019, 25(3): 32-42. [2] 马芹永, 袁璞, 卢小雨. 静态破碎技术在桥梁临时支撑拆除中的应用[J]. 施工技术, 2013, 42(S2): 337-340. MA Qinyong, YUAN Pu, LU Xiaoyu. Application of soundless cracking technology in demolishing bridge temporary support[J]. Construction Technology, 2013, 42(S2): 337-340. [3] 王志刚, 余顺新, 陈亚莉. 桥梁快速建造技术[J]. 中外公路, 2018, 38(4): 184-188. WANG Zhigang, YU Shunxin, CHEN Yali. Discussion on accelerated bridge construction technology[J]. Journal of China & Foreign Highway, 2018, 38(4): 184-188. [4] 佛山市南海纵横交通建设质量检测有限公司.旧五斗大桥检测报告[R],2018. Foshan Nanhai Longitudinal and Horizontal Traffic Construction Quality Inspection Co. Old Wudou bridge inspection report [R], 2018. [5] 林元培, 章曾焕, 马骉, 等. 上海市黄浦江卢浦大桥设计[J]. 土木工程学报, 2005, 38(1): 71-77. LIN Yuanpei, ZHANG Zenghuan, MA Biao, et al. Lupu arch bridge, Shanghai[J]. China Civil Engineering Journal, 2005, 38(1): 71-77. [6] 宋泽冈, 邓旭东. 空腹式肋拱桥静载试验与荷载横向分布分析[J]. 中外公路, 2018, 38(1): 83-86. SONG Zegang, DENG Xudong. Static load test and load lateral distribution analysis of open-spandrel arch bridge[J]. Journal of China & Foreign Highway, 2018, 38(1): 83-86. [7] 邓可, 杨永红, 鲁乃唯, 等. 基于实测车流的中小跨径桥梁车载动力效应极值研究[J]. 中外公路, 2019, 39(5): 75-80. DENG Ke, YANG Yonghong, LU Naiwei, et al. Investigation on extreme dynamic traffic load effects on short-to-medium span bridges using monitored traffic flow[J]. Journal of China & Foreign Highway, 2019, 39(5): 75-80. [8] 肖汝诚. 桥梁结构体系[M]. 北京: 人民交通出版社, 2013. XIAO Rucheng. Bridge structural systems[M]. Beijing: China Communications Press, 2013. [9] 邓宗才, 张亚宁, 柳俊静. 桥梁处治中预应力束应力的变化规律[J]. 公路, 2019, 64(7): 126-130. DENG Zongcai, ZHANG Yaning, LIU Junjing. Variation law of prestress stress in bridge treatment[J]. Highway, 2019, 64(7): 126-130. [10] 李华强. 开口式基坑支护方法设计与运用[J]. 中外公路, 2013, 33(4): 62-65. LI Huaqiang. Design and application of open foundation pit support method[J]. Journal of China & Foreign Highway, 2013, 33(4): 62-65.
Included in
Construction Engineering and Management Commons, Other Civil and Environmental Engineering Commons, Statistical Methodology Commons, Structural Materials Commons, Transportation Engineering Commons