Abstract

Based on the overpass project over Beijing-Hong Kong-Macao Expressway on Changsha Pan-Pan Road,this paper proposed a construction method of large-slope walking-type incremental launching and high falling beam of steel box girder given the difficulties in busy traffic under the bridge,large pushing slope,and great total height of falling beam.After the steel box girder assembly was completed,some bridge deck ancillary facilities were constructed in advance in the preassembly yard and the weight was allocated.The steel box girder was pushed synchronously,thereby reducing the aerial work on the bridge in the later stage.During the incremental launching construction of the steel box girder above the large-slope approach bridge,the alignment of the steel box girder was adjusted by cyclic grading of the rear fulcrum.When high falling beam was carried out on the temporary pier,the drop beam hanging system was set on the bottom plate of the steel box girder,and the child and mother double circulation mode was adopted.The high falling beam was converted into continuous graded low falling beam by repeatedly “top-down ” method between the crawler shelf pier,the crawler slider,and the replacement pier.By analyzing the elevation matching and constraint conditions of incremental launching and falling beam systems in each process conversion,this paper established the system elevation calculation formula suitable for the general situation and gave a reasonable parameter range.

Publication Date

3-18-2024

DOI

10.14048/j.issn.1671-2579.2024.01.020

First Page

147

Last Page

154

Submission Date

February 2025

Reference

[1]赵 人 达 ,张 双 洋 .桥 梁 顶 推 法 施 工 研 究 现 状 及 发 展 趋 势[J].中国公路学报 ,2016 ,29(2): 32-43.ZHAO Renda ,ZHANG Shuangyang .Research status and development trend on incremental launching construction of bridges [J].China Journal of Highway and Transport ,2016 ,29(2):32-43.
[2]封晓平 .桥梁顶推法施工的现状及发展趋势 [J].交通世界,2018 (27):122-123.FENG Xiaoping .Current situation and development trend on incremental launching construction of bridges [J].TranspoWorld ,2018 (27):122-123.
[3]翁方文 ,田卿 ,田飞 .大跨连续钢箱梁桥顶推施工控制技术研究 [J].公路 ,2018 ,63(3):89-92.WENG Fangwen ,TIAN Qing ,TIAN Fei .Research on controlling technology of incremental launching construction for large-span continues steel box girders bridge [J].Highway ,2018 ,63(3):89-92.
[4]夏学军 .宽幅钢箱梁大跨高位顶推施工关键技术 [J].世界桥梁 ,2019 ,47(3):15-19.XIA Xuejun .Key construction techniques for long-span and high-position incremental launching of wide steel box girder [J].World Bridges ,2019 ,47(3):15-19.
[5]伍艺 .重庆南纪门轨道交通专用桥引桥钢箱梁顶推技术[J].桥梁建设 ,2021 ,51(1):130-135.WU Yi .Incremental launching techniques for steel box girders in approach bridge of Nanjimen light rail bridge [J].Bridge Construction ,2021 ,51(1):130-135.
[6]郝玉峰 .步履式顶推施工过程中大跨度钢箱梁的受力性状[J].工业建筑 ,2020 ,50(10):133-137.HAO Yufeng .Mechanical properties of long-span steel box girders under walking incremental launching construction [J].Industrial Construction ,2020 ,50(10):133-137.
[7]魏华 ,刘红钊 ,李炜东 ,等.跨线钢箱梁桥顶推落梁过程的数值模拟 [J].沈阳工业大学学报 ,2017 ,39(4):475-480.WEI Hua ,LIU Hongzhao ,LI Weidong ,et al .Numerical simulation of pushing and falling process of over-line steel box girder bridge [J].Journal of Shenyang University of Technology ,2017 ,39(4):475-480.
[8]李雁鸣 .步履式顶推钢箱梁高位落梁技术研究 [J].铁道建筑技术 ,2016 (7):44-47,52.LI Yanming .Technology research for steel box girder dropping beam from high location by the walking-type incremental launching [J]. Railway Construction Technology ,2016 (7):44-47,52.
[9]赵春林 ,甘泉 ,黄虎 ,等.大型钢箱梁高位落梁施工技术 [J].科技创新导报 ,2018 ,15(33):11-14.ZHAO Chunlin ,GAN Quan ,HUANG Hu ,et al .Construction technology of high-level falling beam of large steel [J].Science and Technology Innovation Herald ,2018 ,15(33):11-14.
[10]邓德员 ,戴维 ,吴有明 ,等.大跨径双幅简支钢箱梁同步顶推施工技术研究与应用 [J].钢结构 (中英文 ),2019 ,34(8):87-91.DENG Deyuan ,DAI Wei ,WU Youming ,et al .Study and application of sync incremental launching construction technique in long-span double-track simply-supported steel box girder [J].Steel Construction ,2019 ,34(8):87-91.
[11]左雁 ,彭云涌 ,万小龙 .场地受限条件简支钢箱梁不等跨顶推对策及受力分析 [J].中外公路 ,2021 ,41(6):137-140.ZUO Yan ,PENG Yunyong ,WAN Xiaolong .Countermeasure and force analysis of unequal span increment launching construction with simply supported steel box girder on restricted site [J].Journal of China & Foreign Highway ,2021 ,41(6):137-140.
[12]李传习 ,陈卓 ,董创文 ,等.横向四滑道步履式顶推宽幅钢箱梁局部应力分析 [J].公路交通科技 ,2019 ,36(4):72-79.LI Chuanxi ,CHEN Zhuo ,DONG Chuangwen ,et al .Analysis on local stress of wide steel box beam constructed by transverse four-slide walking-type incremental launching method [J].Journal of Highway and Transportation Research and Development ,2019 ,36(4):72-79.
[13]廖 应 先 ,达 勇 .小 半 径 大 坡 度 连 续 钢 箱 梁 顶 推 施 工 分 析[J].湖南交通科技 ,2016 ,42(3):142-145.LIAO Yingxian ,DA Yong .Analysis of jacking construction of small radius and large slope continuous steel box girder [J].Hunan Communication Science and Technology ,2016 ,42(3):142-145.

Share

COinS