In order to determine reasonable grouting parameters,control surface settlement,and reduce the risk of excessive surface settlement caused by irrational synchronous grouting parameters,this study studied the shield tunnel project between maglev T 2 station and maglev T 3 station.A numerical simulation method was adopted to study the influence of grouting pressure,grouting volume,and the elastic modulus of slurry on surface deformation.The results show that the tunnel synchronous grouting has a significant effect on surface settlement control.A greater grouting pressure,equivalent grouting layer thickness,and elastic modulus of slurry mean a smaller surface settlement.As the three parameters increase,the variation range of surface settlement decreases and gradually stabilizes,indicating that the grouting effect tends to saturate.By considering both grouting effectiveness and economic efficiency,it is recommended to adopt a grouting pressure of 200‒250 kPa,a grouting volume of 5.4 m3 per ring,and an elastic modulus of slurry between 200 and 250 MPa.The on-site application has verified the rationality of this parameter combination.The research provides a reference for grouting reinforcement in similar shield tunnel projects.

Publication Date

6-23-2025

DOI

10.14048/j.issn.1671-2579.2025.03.021

First Page

172

Last Page

182

Submission Date

August 2025

Reference

[1]钟小春,钟建玲,于伦超,等.考虑盾尾注浆影响的管片土压力模型试验研究 [J].地下空间与工程学报,2023,19(增刊1):201-208.ZHONG Xiaochun,ZHONG Jianling,YU Lunchao,et al.Experimental study on segment earth pressure model considering the influence of shield tail grouting [J].Chinese Journal of Underground Space and Engineering,2023,19(sup 1):201-208.
[2]宋洋,王宏帅,李昂,等.富水粉细砂层盾尾同步注浆浆液渗透 ‒压密扩散机制研究 [J].岩土力学,2023,44(5):1319 -1329.SONG Yang,WANG Hongshuai,LI Ang,et al.Permeation-compaction diffusion mechanism of shield tail synchronous grouting slurry in water-rich fine sand layer[J].Rock and Soil Mechanics,2023,44(5):1319 -1329.
[3]何历超.大直径泥水盾构穿越长江冲槽高效施工关键技术[J].中外公路,2021,41(5):203-206.HE Lichao.Key technology for efficient construction of large diameter slurry dhield passing through Yangtze River groove [J].Journal of China & Foreign Highway,2021,41(5):203-206.
[4]张云,殷宗泽,徐永福.盾构法隧道引起的地表变形分析[J].岩石力学与工程学报,2002,21(3):388-392.ZHANG Yun,YIN Zongze,XU Yongfu.Analysis on three-dimensional ground surface deformations due to shield tunnel [J].Chinese Journal of Rock Mechanics and Engineering,2002,21(3):388-392.
[5]魏新江,张彪,鲁梁梁,等.盾构隧道同步注浆的几个核心问题探讨 [J].现代隧道技术,2022,59(3):10-22.WEI Xinjiang,ZHANG Biao,LU Liangliang,et al.A discussion on several core issues of synchronous grouting in shield tunnelling [J].Modern Tunnelling Technology,2022,59(3):10-22.
[6]王福周,苏学贵,李自力,等.盾构隧道注浆参数对地表沉降的影响分析 [J].混凝土,2021 (11):10-13,20.WANG Fuzhou,SU Xuegui,LI Zili,et al.Research on the influence of shield tunnel grouting parameters on surface subsidence [J].Concrete,2021 (11):10-13,20.
[7]黄跃廷,王崇华,汪慧,等.隧道全断面超前注浆对地层扰动特性研究 [J].中外公路,2023,43(6):273-277.HUANG Yueting,WANG Chonghua,WANG Hui,et al.Study on disturbance characteristics of ground in full-section tunnel under advance grouting [J].Journal of China & Foreign Highway,2023,43(6):273-277.
[8]佘芳涛,吴征奇,周伟踪,等.考虑关键施工参数的矩形顶管隧道围岩变形控制分析 [J].岩土工程学报,2022,44(增刊1):247-253.SHE Fangtao,WU Zhengqi,ZHOU Weizong,et al.Deformation control analysis of surrounding rock of rectangular pipe jacking tunnel considering key construction parameters [J].Chinese Journal of Geotechnical Engineering,2022,44(sup 1):247-253.
[9]佟彬,张斌,朱汉标,等.双模盾构土压模式下下穿珠江断裂 带 开 挖 面 稳 定 性 研 究 [J].中 外 公 路,2024,44(5):232-240.TONG Bin,ZHANG Bin,ZHU Hanbiao,et al.Stability of excavation face of double-mode shield in earth pressure mode crossing fault zone of Pearl River [J].Journal of China & Foreign Highway,2024,44(5):232-240.
[10]刘继强,朱旻,郝琨,等.上方基坑施工引起新运营隧道变形与病害分析 [J].中外公路,2024,44(3):202-210.LIU Jiqiang,ZHU Min,HAO Kun,et al.Deformation and damage characteristics of a newly operated tunnel caused by above foundation pit construction [J].Journal of China & Foreign Highway,2024,44(3):202-210.
[11]蒋胜光,张子新.圆砾地层双线盾构施工参数及沉降特征分析 [J].地下空间与工程学报,2015,11(增刊 2):698-705.JIANG Shengguang,ZHANG Zixin.Analysis of construction parameters and settlement characteristics of double-line shield in gravel stratum [J].Chinese Journal of Underground Space and Engineering,2015,11(sup 2):698-705.
[12]雷华阳,仇王维,吕乾乾,等.盾构施工中注浆因素对地表沉 降 的 影 响 研 究 [J].地 下 空 间 与 工 程 学 报,2015,11(5):1303 -1309.LEI Huayang,QIU Wangwei,LYU Qianqian,et al.Study on the impact of the grouting factors on surface subsidence in the process of shield construction [J].Chinese Journal of Underground Space and Engineering,2015,11(5):1303 -1309.
[13]吴贤国,姜洲,方伟立,等.盾构同步注浆对地表沉降的影响分析 [J].城市轨道交通研究,2016,19(6):101-106,111.WU Xianguo,JIANG Zhou,FANG Weili,et al.Impact of shield synchronous grouting over rail transit ground subsidence [J].Urban Mass Transit,2016,19(6):101-106,111.
[14]丁万涛,杨起江,朱建,等.盾构同步注浆参数对地表变形的影响分析 [J].人民长江,2018,49(14):89-94..DING Wantao,YANG Qijiang,ZHU Jian,et al.Analysis on ground surface deformation caused by synchronous grouting of shield tunnels [J].Yangtze River,2018,49(14):89-94.
[15]包雨生,李策,梁敏飞,等.大直径泥水平衡盾构穿越砂性地 层 沉 降 控 制 分 析 [J].铁 道 标 准 设 计,2018,62(12):136-140.BAO Yusheng,LI Ce,LIANG Minfei,et al.Research on ground settlement control of large-diameter slurry shield through sandy strata [J].Railway Standard Design,2018,62(12):136-140.
[16]邓皇适,傅鹤林,史越,等.注浆压力非均匀分布引发的地表 沉 降 计 算 及 其 影 响 因 素 分 析 [J].中 南 大 学 学 报 (自 然科学版 ),2021,52(10):3550 -3558.DENG Huangshi,FU Helin,SHI Yue,et al.Calculation and influence factors analysis of surface subsidence caused by non-uniform distribution of grouting pressure [J].Journal of Central South University (Science and Technology ),2021,52(10):3550 -3558.
[17]窦炳珺,钟均民,赵鹏,等.硬岩地区盾构掘进地表竖向位移监测数据及数值模拟分析 [J].科学技术与工程,2022,22(25):11227 -11234.DOU Bingjun,ZHONG Junmin,ZHAO Peng,et al.Analysis on surface settlement of shield excavation in hard rock areas by field monitoring and numerical simulation [J].Science Technology and Engineering,2022,22(25):11227 -11234.
[18]孙萌萌,师文豪,徐阳,等.克泥效工法对盾构隧道地表变形的作用规律研究 [J].人民长江,2024,55(2):156-163.SUN Mengmeng,SHI Wenhao,XU Yang,et al.Action law of clay shock construction method on surface deformation of shield tunnels [J].Yangtze River,2024,55(2):156-163.
[19]李培楠,朱合华,李晓军,等.大断面异形盾构同步注浆两阶段复合扩散机制及压力时空分布模式 [J].土木工程学报,2023,56(3):90-106.LI Peinan,ZHU Hehua,LI Xiaojun,et al.Two stage compound diffusion mechanism and pressure space-time distribution mode of synchronous grouting for large cross-section special-shaped shield [J].China Civil Engineering Journal,2023,56(3):90-106.
[20]朱才辉,李宁,柳厚祥,等.盾构施工工艺诱发地表沉降规律浅析 [J].岩土力学,2011,32(1):158-164.ZHU Caihui,LI Ning,LIU Houxiang,et al.Analysis of ground settlement induced by workmanship of shield tunnelling [J].Rock and Soil Mechanics,2011,32(1):158-164.

Share

COinS