Abstract
This study aims to address poor adaptability and timeliness in the design of smooth blasting hole parameters in t he past.With the drilling and blasting method-based construction of large cross-section tunnels in Botanggou and Tielugou along the Zunhua‒Qinhuangdao Expressway as the research background and Ⅲ and Ⅳ grade surrounding rocks of porphyritic granite as the research object,statistical regression analysis and theoretical derivation were conducted on the measured data during on-site drilling according to the rock solidity coefficient.Based on this,a simple parameter design method for a smooth blasting layer based on the drilling speed index of an air leg anchor rod drill was proposed,and the relationship between the drilling speed and the parameters of the smooth blasting layer hole was obtained.The research results indicate that there is a good correlation between the drilling speed and parameters such as the spacing between surrounding holes and the thickness of the smooth blasting layer.Based on the engineering conditions of the Botanggou and Tielugou tunnels,a parameter design table was calculated for the drilling speed of the drill rod,the spacing between surrounding holes,and the thickness of the smooth blasting layer.Through on-site practice,this method achieves good smooth blasting results,with a hole trace rate of over 90%.The research findings can provide a theoretical basis and reference for the design of smooth blasting parameters of tunnels in similar geological conditions.
Publication Date
6-23-2025
DOI
10.14048/j.issn.1671-2579.2025.03.022
First Page
183
Last Page
190
Submission Date
August 2025
Recommended Citation
Haitao, WANG; Jianghua, LU; Yang, LIU; Mingli, HUANG; and Xuan, WU
(2025)
"Field Test Research on Optimization of Smooth Blasting Parameters Based on Drilling Speed,"
Journal of China & Foreign Highway: Vol. 45:
Iss.
3, Article 22.
DOI: 10.14048/j.issn.1671-2579.2025.03.022
Available at:
https://zwgl1980.csust.edu.cn/journal/vol45/iss3/22
Reference
[1]丁祥.互层岩体隧道爆破超欠挖控制技术研究 [J].铁道工程学报,2022,39(3):75-80.DING Xiang.Research on the control technology of over-under-excavation of tunnel blasting in interbedded rock masses [J].Journal of Railway Engineering Society,2022,39(3):75-80.
[2]刘 赶 平.大 断 面 隧 道 光 面 爆 破 设 计 [J].爆 破,2019,36(2):65-71,77.LIU Ganping.Smooth blasting design for large cross-section tunnel excavation [J].Blasting,2019,36(2):65-71,77.
[3]张继春,潘强,郑爽英,等.特大断面公路隧道的光面爆破技术研究 [J].爆破,2018,35(4):52-57.ZHANG Jichun,PAN Qiang,ZHENG Shuangying,et al.Technique of smooth blasting of highway tunnel with super-large section [J].Blasting,2018,35(4):52-57.
[4]尹文纲,王海亮,胡红星,等.隧道成型控制爆破技术及围岩 损 伤 范 围 研 究 [J].隧 道 建 设 (中 英 文 ),2018,38(5):851-856.YIN Wengang,WANG Hailiang,HU Hongxing,et al.Study of tunnel controlled blasting technology and blast-induced damage zone of surrounding rocks [J].Tunnel Construction,2018,38(5):851-856.
[5]高轩,王帅帅,王星,等.小断面铁路隧道凿岩台车钻孔施工光面爆破技术研究 [J].现代隧道技术,2022,59(增刊 1):811-817.GAO Xuan,WANG Shuaishuai,WANG Xing,et al.Study on smooth blasting technology in drilling construction of small cross-section railway tunnel with drill trolley [J].Modern Tunnelling Technology,2022,59(sup 1):811-817.
[6]LIU K Y,LIU B G.Optimization of smooth blasting parameters for mountain tunnel construction with specified control indices based on a GA and ISVR coupling algorithm [J].Tunnelling and Underground Space Technology,2017,70:363-374.
[7]FENG X M,ZHUANG J Z,JU J S,et al.Smooth blasting hole spacing and smooth surface layer depth optimization[J].Advanced Science Letters,2011,4(8):2703 -2707.
[8]SELLERS E.Controlled blasting for enhanced safety in the underground environment [J].Journal of the South African Institute of Mining and Metallurgy,2011,111:11-17.
[9]凌天龙,武宇,李胜林,等.煤矿巷道光面爆破智能设计系统开发与应用 [J].河南理工大学学报 (自然科学版 ),2018,37(2):29-35.LING Tianlong,WU Yu,LI Shenglin,et al.Development and application of intelligent design system for smooth blasting of coal mine roadway [J].Journal of Henan Polytechnic University (Natural Science ),2018,37(2):29-35.
[10]满轲,刘晓丽,王锡勇,等.周边孔炮眼间距对光面爆破效果的影响 [J].科学技术与工程,2016,16(29):47-53.MAN Ke,LIU Xiaoli,WANG Xiyong,et al.Research on the smooth blasting influenced by the surrounding hole space[J].Science Technology and Engineering,2016,16(29):47-53.
[11]谢全敏,殷建强,杨文东.基于 Hoek-Brown 方程的边坡光面爆破参数设计方法 [J].中国铁道科学,2017,38(2):1-5.XIE Quanmin,YIN Jianqiang,YANG Wendong.Design method for slope smooth blasting parameters based on Hoek-Brown equation [J].China Railway Science,2017,38(2):1-5.
[12]王维富,柴文勇,阴晓炜,等.高地应力硬岩重载铁路隧道开 挖 断 面 成 形 特 征 统 计 分 析 [J].中 外 公 路,2020,40(1):196-199.WANG Weifu,CHAI Wenyong,YIN Xiaowei,et al.Statistical analysis on forming characteristics of excavation cross section of heavy railway tunnels with high ground stress [J].Journal of China & Foreign Highway,2020,40(1):196-199.
[13]顾义磊,李晓红,杜云贵,等.隧道光面爆破合理爆破参数的确定 [J].重庆大学学报 (自然科学版 ),2005,28(3):95-97.GU Yilei,LI Xiaohong,DU Yungui,et al.Reasonable smooth blasting factor used in tunnel [J].Journal of Chongqing University,2005,28(3):95-97.
[14]范勇,孙金山,贾永胜,等.高地应力硐室光面爆破孔间应力相互作用与成缝机制 [J].岩石力学与工程学报,2023,42(6):1352 -1365.FAN Yong,SUN Jinshan,JIA Yongsheng,et al.Stress interaction and crack penetration mechanism between smooth blasting holes for tunnel excavation under high in situ stress [J].Chinese Journal of Rock Mechanics and Engineering,2023,42(6):1352 -1365.
[15]李启月,徐敏,董陇军,等.光面爆破效果参量预测的投影寻 踪 回 归 模 型 及 应 用 [J].中 南 大 学 学 报 (自 然 科 学 版 ),2012,43(10):3976 -3981.LI Qiyue,XU Min,DONG Longjun,et al.Projection pursuit regression model and its application for predicting smooth blasting effect parameters [J].Journal of Central South University (Science and Technology ),2012,43(10):3976 -3981.
[16]姚萌.基于凿岩台车钻进参数的隧道围岩智能分级方法研究 [D].成都:西南交通大学,2020.YAO Meng.Study on intelligent classification of surrounding rock based on drilling jumbo ’s drilling parameters [D].Chengdu:Southwest Jiaotong University.2020.
[17]韦建昌,邵羽,梁铭,等.超前水平钻探在岩溶隧道地质预报中的应用研究 [J].中外公路,2020,40(3):220-226.WEI Jianchang,SHAO Yu,LIANG Ming,et al.Application of advance horizontal drilling in geological prediction in Karst tunnels [J].Journal of China & Foreign Highway,2020,40(3):220-226.
[18]刘云付.基于钻孔数据的隧道围岩无侧限抗压强度估算方法 [J].中外公路,2020,40(6):215-218.LIU Yunfu.Estimation method of UCS strength of tunnel surrounding rock based on borehole data [J].Journal of China & Foreign Highway,2020,40(6):215-218.
[19]杨小林.地下工程爆破 [M].武汉:武汉理工大学出版社,2009.YANG Xiaolin.Underground engineering blasting [M].Wuhan:Wuhan University of Technology Press,2009.
[20]马芹永.光面爆破炮眼间距及光面层厚度的确定 [J].岩石力学与工程学报,1997,16(6):590-594.MA Qinyong.Definition of hole-space and burden in smoth blasting [J].Chinese Journal of Rock Mechanics and Engineering,1997,16(6):590-594.
Included in
Construction Engineering and Management Commons, Other Civil and Environmental Engineering Commons, Statistical Methodology Commons, Structural Materials Commons, Transportation Engineering Commons