Abstract
When excavating a waterway beneath an existing bridge,the pile foundations are subjected to unloading from excavation and the loading from the superstructure,which may lead to excessive displacement and potential safety hazards.Based on the underpass project of the Desheng Expressway Bridge along the Zhejiang section of the Beijing ‒ Hangzhou Canal,this study established a three-dimensional finite element model (FEM ) and combined it with field monitoring to investigate the impact of wide waterway excavation on adjacent bridge pile foundations and corresponding control measures.A novel combined control method involving a retaining wall with supporting piles and fully enclosed isolation piles was proposed.The results show that this combined support scheme exhibits the best control performance.The maximum horizontal displacement of the pile foundation is 7.43 mm,representing a 26% reduction compared to the deformation observed under the single-side isolation pile control scheme.When the insertion ratio of the retaining wall is not less than 1.2 and the thickness exceeds 0.8 m,a favorable deformation control effect is observed.Increasing the depth of isolation piles from 15 m to 27 m reduces the horizontal displacement induced by waterway excavation by 32.56%,although the rate of reduction diminishes with increasing depth.
Publication Date
8-15-2025
DOI
10.14048/j.issn.1671-2579.2025.04.018
First Page
144
Last Page
151
Submission Date
August 2025
Recommended Citation
Peisheng, ZHANG; Lyu, QIAO; Jianchao, SHENG; Haoxiang, SHENG; Hanchen, LIU; and Zhe, WANG
(2025)
"Analysis and Control of Impact of Wide Waterway Excavation on Adjacent Bridge Pile Foundations,"
Journal of China & Foreign Highway: Vol. 45:
Iss.
4, Article 18.
DOI: 10.14048/j.issn.1671-2579.2025.04.018
Available at:
https://zwgl1980.csust.edu.cn/journal/vol45/iss4/18
Reference
[1]KHOIRI M,OU C Y.Evaluation of deformation parameter for deep excavation in sand through case histories [J].Computers and Geotechnics,2013,47:57-67.
[2]刘松玉,李洪江,童立元,等.地下工程开挖卸荷既有桩基承载响应物理模拟及新进展 [J].岩土工程学报,2019,41(7):1329 -1338.LIU Songyu,LI Hongjiang,TONG Liyuan,et al.Model tests and new progress of pile response due to underground excavations [J].Chinese Journal of Geotechnical Engineering,2019,41(7):1329 -1338.
[3]陈发东.盾构隧道施工对临近桥梁桩基及周围土体影响的模拟研究 [J].中外公路,2018,38(6):177-181.CHEN Fadong.Research on influence of shield tunnel construction making on bridge pile foundation and surrounding soils [J].Journal of China & Foreign Highway,2018,38(6):177-181.
[4]刘建威,于鹏,李德建.大型深基坑紧邻磁浮高架桥和站场结构施工影响分析 [J].中外公路,2020,40(6):32-36.LIU Jianwei,YU Peng,LI Dejian.Analysis of impact of large deep foundation pit construction on adjacent maglev viaduct and station structure [J].Journal of China & Foreign Highway,2020,40(6):32-36.
[5]郑明新,夏一鸣,袁钎,等.深基坑开挖对邻近高速铁路桥墩桩基变形影响分析 [J].施工技术,2017,46(5):12-15,28.ZHENG Mingxin,XIA Yiming,YUAN Qian,et al.Deformation analysis of pile of bridge piers of high-speed railway affected by adjacent deep foundation excavation[J].Construction Technology,2017,46(5):12-15,28.
[6]贺健军,建鑫龙.基坑对既有桥梁桩基变形特性影响的有限元分析 [J].公路交通科技 (应用技术版 ),2016,12(5):255-257.HE Jianjun,JIAN Xinlong.Finite element analysis of the influence of foundation pit on pile foundation deformation characteristics of existing bridges [J].Journal of Highway and Transportation Research and Development,2016,12(5):255-257.
[7]李飞,徐劲,张飞,等.渗流作用下深基坑开挖对桩基影响的数值模拟 [J].工程勘察,2015,43(11):5-13,25.LI Fei,XU Jin,ZHANG Fei,et al.Numerical simulation of the affection of deep excavation seepage on pile foundation [J].Geotechnical Investigation & Surveying,2015,43(11):5-13,25.
[8]彭智勇,杨秀仁.基坑分块开挖参数对邻近地铁盾构隧道的变形影响分析 [J].中外公路,2019,39(2):206-210.PENG Zhiyong,YANG Xiuren.The deformation influence about block excavation parameters of foundation pit adjacent to metro shield tunnels [J].Journal of China & Foreign Highway,2019,39(2):206-210.
[9]盛军其,李佳玮,金彬彬,等.航道开挖对下方已建地铁工程的影响性分析 [J].水运工程,2018 (9):151-155,160.SHENG Junqi,LI Jiawei,JIN Binbin,et al.Impact of waterway excavation on existing tunnel structure under it[J].Port & Waterway Engineering,2018 (9):151-155,160.
[10]江杰,陈俊羽,马少坤,等.船坞基坑开挖对邻近桩基影响的三维数值分析 [J].地下空间与工程学报,2016,12(增刊 1):246-253,274.JIANG Jie,CHEN Junyu,MA Shaokun,et al.Three dimensional numerical analysis of pile response due to the excavation of foundation pit at dock [J].Chinese Journal of Underground Space and Engineering,2016,12(sup 1):246-253,274.
[11]李士中.京杭大运河新开挖航道对高速铁路桥墩的影响[J].铁道建筑,2020,60(8):33-36.LI Shizhong.Influence of Beijing-Hangzhou grand canal ’s newly excavated waterway on bridge pier of high speed railway [J].Railway Engineering,2020,60(8):33-36.
[12]谷素兵,李锋,谷雷雷,等.软土地区航道开挖对桥梁桩基变形影响研究 [J].地震工程学报,2022,44(4):844-853.GU Subing,LI Feng,GU Leilei,et al.Influence of channel excavation on the deformation of bridge pile foundation in soft soil area [J].China Earthquake Engineering Journal,2022,44(4):844-853.
[13]谷雷雷,李锋,谷素兵,等.航道开挖对上跨桥梁桩基影响及控制措施研究 [J].工程建设与设计,2022 (9):103-107.GU Leilei,LI Feng,GU Subing,et al.Study on the influence of channel excavation on upper span bridge pile foundation and its control measures [J].Construction & Design for Engineering,2022 (9):103-107.
[14]罗成恒,魏建华.减少软土深基坑周边环境初始位移的方法探讨 [J].岩土工程学报,2012,34(增刊 1):49-53.LUO Chengheng,WEI Jianhua.Reducing the initial displacement of the surrounding deep foundation pit of soft soil [J].Chinese Journal of Geotechnical Engineering,2012,34(sup 1):49-53.
[15]丁勇春,王建华.深基坑施工对高架基础的变形影响及控制研究 [J].土木工程学报,2012,45(7):155-161.DING Yongchun,WANG Jianhua.Influence of deep excavation on deformation of elevated bridge foundations and countermeasures [J].China Civil Engineering Journal,2012,45(7):155-161.
[16]杨敏,周洪波,杨桦.基坑开挖与临近桩基相互作用分析[J].土木工程学报,2005,38(4):91-96.YANG Min,ZHOU Hongbo,YANG Hua.Numerical analysis of pile response due to unsupported excavation-induced lateral soil movement [J].China Civil Engineering Journal,2005,38(4):91-96.
[17]曹利强,陈湘生,张顶立,等.隔离桩对隧道开挖诱发土体竖向位移牵制效应的理论分析 [J].岩土工程学报,2022,44(5):916-925.CAO Liqiang,CHEN Xiangsheng,ZHANG Dingli,et al.Theoretical investigation of restraint effect of isolation piles on vertical ground displacements due to tunneling under the plane state [J].Chinese Journal of Geotechnical Engineering,2022,44(5):916-925.
[18]刘秋常,马百顺,陈守开.盾构施工不同加固措施对临近高架桥桩基影响研究 [J].中外公路,2018,38(1):172-176.LIU Qiuchang,MA Baishun,CHEN Shoukai.Study on influence of different reinforcement measures of shield construction to pile foundation of adjacent viaduct [J].Journal of China & Foreign Highway,2018,38(1):172-176.
Included in
Construction Engineering and Management Commons, Other Civil and Environmental Engineering Commons, Statistical Methodology Commons, Structural Materials Commons, Transportation Engineering Commons