Abstract

This article presented a method that c ombined the forward-back analysis method and the difference iteration method to solve the initial cable tension according to the state of a built bridge for an arch bridge.Given the known target state of the bridge,a reasonable set of initial cable tensions was determined as the initial value of iteration by the forward-back method.These initial tensions were then applied to the calculation model based on the actual construction process.Through the difference iteration method,the initial cable tensions were optimized.The results show that the method can effectively determine the final cable tension that meets engineering precision requirements,significantly saving computation time.The article provides two bridge examples to illustrate the implementation process of the method in practical engineering applications,obtaining a set of cable tensions that meet the desired requirements and validating the effectiveness of the method.The method can be widely applied to the determination of initial cable tensions in various types of bridges.

Publication Date

12-24-2025

DOI

10.14048/j.issn.1671-2579.2025.06.017

First Page

146

Last Page

158

Submission Date

December 2025

Reference

[1]韩保勤.钢管混凝土拱桥吊杆张拉方案比选 [J].桥梁建设,2015,45(1):114-119.HAN Baoqin.Comparison and selection of tensioning scheme for hangers of concrete-filled steel tube arch bridge [J].Bridge Construction,2015,45(1):114-119.
[2]黄天立,傅金龙.支架现浇刚性系杆拱桥的吊杆施工张拉力确定方法 [J].桥梁建设,2016,46(5):35-40.HUANG Tianli,FU Jinlong.Determination method for construction tensioning forces of hangers of rigid tied arch bridges cast in situ on supports [J].Bridge Construction,2016,46(5):35-40.
[3]刘杰,魏立新.单跨三肋五索面超宽下承式系杆拱桥总体设计 [J].中外公路,2023,43(5):163-167.LIU Jie,WEI Lixin.Overall design of single span super wide tied arch bridge with three ribs and five cables [J].Journal of China & Foreign Highway,2023,43(5):163-167.
[4]周小勇,吕志敏,王加辉,等.支架现浇系杆拱桥吊杆张拉方案优化 [J].中外公路,2022,42(2):125-130.ZHOU Xiaoyong,LYU Zhimin,WANG Jiahui,et al.Optimization of suspender tensioning scheme for cast-in-place bracket tied-arch bridge [J].Journal of China & Foreign Highway,2022,42(2):125-130.
[5]廖盛荣,张松鹏,田太军.外倾钢管拱桥施工阶段吊杆张拉及索力分析 [J].公路,2023,68(10):174-179.LIAO Shengrong,ZHANG Songpeng,TIAN Taijun.Analysis of suspension cable tensioning and cable force during construction stage of outward-inclined steel pipe arch bridge [J].Highway,2023,68(10):174-179.
[6]于孟生,姚鑫玉,郑皆连,等.大跨度钢管混凝土拱桥吊杆索力优化实用方法 [J].桂林理工大学学报,2023,43(1):78-82.YU Mengsheng,YAO Xinyu,ZHENG Jielian,et al.Application of suspender cable force optimization for long-span concrete-filled steel tubular arch bridges [J].Journal of Guilin University of Technology,2023,43(1):78-82.
[7]巴文鹏.超大跨径矮塔斜拉桥成桥内力优化及施工线形控制研究 [J].中外公路,2025,45(3):163-171.BA Wenpeng.Internal force optimization in completed stage and construction alignment control of super long-span extradosed cable-stayed bridge [J].Journal of China & Foreign Highway,2025,45(3):163-171.
[8]李长坤,段庆普,魏玲利.斜靠式系杆拱桥吊杆施工初张力分析与控制 [J].工程建设,2019,51(5):42-46.LI Changkun,DUAN Qingpu,WEI Lingli.Analysis and control of preliminary tension in suspender construction of leaned tied-arch bridge [J].Engineering Construction,2019,51(5):42-46.
[9]项海帆.高等桥梁结构理论 [M].2版.北京:人民交通出版社,2013.XIANG Haifan.Advanced theory of bridge structures [M].2nd ed.Beijing:China Communications Press,2013.
[10]林天然,张勇,段元锋.梁拱同步施工的钢箱提篮拱桥吊杆施工张拉力的计算方法 [J].结构工程师,2016,32(4):170-175.LIN Tianran,ZHANG Yong,DUAN Yuanfeng.Computational method of In-construction suspender tension for beam-arch simultaneously constructed steel box basket-handling arch bridge [J].Structural Engineers,2016,32(4):170-175.
[11]刘耀东,聂闯,唐齐.基于差值迭代法的斜拉桥初张索力计算方法 [J].湖北工业大学学报,2018,33(1):98-100.LIU Yaodong,NIE Chuang,TANG Qi.Calculation method of initial tensile forces of cable-stayed bridge based on difference iteration method [J].Journal of Hubei University of Technology,2018,33(1):98-100.
[12]何炳涛.基于正装迭代法的钢管砼拱桥吊杆初始索力计算[J].公路与汽运,2022 (3):110-111,134.HE Bingtao.Initial cable force calculation of steel pipe concrete arch bridge suspension cables based on formal attire iteration method [J].Highways & Automotive Applications,2022 (3):110-111,134.
[13]徐郁峰,陈斯,谢云飞,等.斜拉桥由成桥状态求解施工初始索力方法研究 [J].中外公路,2024,44(5):201-209.XU Yufeng,CHEN Si,XIE Yunfei,et al.Method of solving initial construction cable force of completed cable-stayed bridge [J].Journal of China & Foreign Highway,2024,44(5):201-209.
[14]王帅军,陈飞雷,林杰.差值正装迭代法和无应力状态法确定混凝土斜拉桥施工索力 [J].福建交通科技,2023 (4):45-48.WANG Shuaijun,CHEN Feilei,LIN Jie.Determination of construction cable forces for concrete cable-stayed bridges using difference formal attire iteration method and stress-free state method [J].Fujian Journal of Transportation Science and Technology,2023 (4):45-48.
[15]黄春亮.正装迭代法求解矮塔斜拉桥初张索力研究 [J].公路与汽运,2017 (1):144-146.HUANG Chunliang.Study on calculation of initial cable tension in low-tower cable-stayed bridge using formal attire iteration method [J].Highways & Automotive Applications,2017 (1):144-146.
[16]杨吉新,李科文,张钦文.非对称双斜塔斜拉桥塔间索初张索力确定 [J].工程与建设,2018,32(4):465-468.YANG Jixin,LI Kewen,ZHANG Qinwen.Determination of the initial cable tension force between tower cables of asymmetrical twin tower cable-stayed bridges [J].Engineering and Construction,2018,32(4):465-468.
[17]李介立,夏永豪,张啸文,等.叠合梁斜拉桥合理施工状态确 定 的 正 装 差 值 迭 代 法 [J].中 外 公 路,2023,43(6):218-223.LI Jieli,XIA Yonghao,ZHANG Xiaowen,et al.Forward difference iteration method for determining reasonable construction state of cable-stayed bridges with stacked girders [J].Journal of China & Foreign Highway,2023,43(6):218-223.
[18]李鹏飞,王石磊,魏思聪,等.大型空间异形钢塔斜拉桥拉索张拉控制 [J].公路交通科技,2022,39(10):49-58.LI Pengfei,WANG Shilei,WEI Sicong,et al.Study on cable tension control of cable stayed bridge with large space special-shaped steel pylons [J].Journal of Highway and Transportation Research and Development,2022,39(10):49-58.
[19]谭俊.无应力状态控制法在桥梁施工控制中的应用 [J].公路,2016,61(4):122-126.TAN Jun.Application of stress-free state control method in bridge construction control [J].Highway,2016,61(4):122-126.
[20]吴月星,张博恒,周建庭,等.基于无应力正装迭代法的大跨混凝土斜拉桥合理施工状态分析 [J].公路工程,2020,45(5):15-20,72.WU Yuexing,ZHANG Boheng,ZHOU Jianting,et al.Analysis of reasonable construction state of the long-span concrete cable-stayed bridge based on stress-free forward iteration method [J].Highway Engineering,2020,45(5):15-20,72.
[21]涂光亚,周城勇.大跨度组合梁斜拉桥中跨合龙口相对转角误差分析 [J].中外公路,2023,43(6):115-119.TU Guangya,ZHOU Chengyong.Error analysis of relative angle at the central-span closure of long-span composite girder cable-stayed bridges [J].Journal of China & Foreign Highway,2023,43(6):115-119.
[22]朱龙龙.钢管混凝土系杆拱桥的初张力优化研究 [J].工程与建设,2021,35(5):893-895,901.ZHU Longlong.Study on optimization of initial tension of concrete filled steel tubular tied arch bridge [J].Engineering and Construction,2021,35(5):893-895,901.
[23]潘桂梅.索力调整中影响矩阵在 MIDAS/CIVIL 中的实现[J].科学技术与工程,2011,11(27):6763 -6766.PAN Guimei.Tension adjustment of matrix in MIDAS/CIVIL realization [J].Science Technology and Engineering,2011,11(27):6763 -6766.
[24]方鸿,高琼.影响矩阵法在系杆拱桥施工调索中的应用[J].中外公路,2014,34(6):146-148.FANG Hong,GAO Qiong.Application of influence matrix method in cable adjustment of system bar arch bridge construction [J].Journal of China & Foreign Highway,2014,34(6):146-148.
[25]赵伟,郑剑涵,陆森强.特大跨系杆钢拱桥成桥状态与吊杆张拉力优化分析 [J].中外公路,2016,36(1):113-118.ZHAO Wei,ZHENG Jianhan,LU Senqiang.Analysis of the bridge state and optimization of suspension cable tension in the completed state of extra-large span system bar steel arch bridge [J].Journal of China & Foreign Highway,2016,36(1):113-118.

Share

COinS