Abstract
This study aims to study the settlem ent changes and distribution of various parts of a complex building during the construction of a large-diameter and small-clearance parallel pipe jacking undercrossing complex building.On the basis of the pipe jacking project of water quality guarantee engineering 2# for Tiegang –Shiyan Reservoir in Shenzhen,the settlement mechanism of pipe jacking undercrossing construction was analyzed.Through numerical simulation,the influence of the presence or absence of grouting reinforcement,and parameters such as longitudinal spacing and burial depth of pipe jacking on the variation trend and distribution law of building settlement was analyzed.The theoretically predicted values,numerical simulation values,and on-site monitoring values were compared.The results show that the settlement value and settlement difference rate of the building after grouting reinforcement with sleeve valve pipes are significantly reduced.As the longitudinal spacing of pipe jacking increases,the settlement value and slope of the variation curve of the measuring point gradually decrease.The settlement value of measuring point 3 is the most decreased,with a reduction of 83.5%.When the burial depth of pipe jacking increases from 9 m to 21 m,the maximum settlement value of the building decreases by 1.9 mm,and the overall settlement distribution gradually becomes uniform.When the burial depth of pipe jacking is 9 m,using the scheme of grouting reinforcement with sleeve valve pipes and a longitudinal spacing of 108 m for pipe jacking can minimize the effect of pipe jacking construction on the building.
Publication Date
12-24-2025
DOI
10.14048/j.issn.1671-2579.2025.06.027
First Page
234
Last Page
244
Submission Date
December 2025
Recommended Citation
Gang, TANG; Wen jie, HUANG; Wenbo, ZHANG; Wenjie, LI; and Bin, LIANG
(2025)
"Settlement Mechanism and Re inforcement Measure for Large-Diameter and Small-Clearance Parallel P ipe Jacking Undercrossing Complex Building,"
Journal of China & Foreign Highway: Vol. 45:
Iss.
6, Article 27.
DOI: 10.14048/j.issn.1671-2579.2025.06.027
Available at:
https://zwgl1980.csust.edu.cn/journal/vol45/iss6/27
Reference
[1]柳盛霖,许斌锋,于洪波,等.顶管施工对既有管线服役状态影响的物联网监测与分析 [J].中外公路,2019,39(6):287-291.LIU Shenglin,XU Binfeng,YU Hongbo,et al.Monitoring and analysis of impact of pipe jacking construction on service status of existing pipeline based on internate of things [J].Journal of China & Foreign Highway,2019,39(6):287-291.
[2]杨景峰,苗冰阳,郭强,等.超大顶管侧穿密集建筑区施工影响及加固措施研究 [J/OL ].中外公路,1-11[2025 -04-14].https://link.cnki.net/urlid/ 43.1363.U.20250414.1910.004.YANG Jingfeng,MIAO Bingyang,GUO Qiang,et al.Construction influence and reinforcement measures for super-large pipe jacking side-crossing dense building areas[J/OL ].Journal of China & Foreign Highway,1-11[2025 -04-14].https://link.cnki.net/urlid/ 43.1363.U.20250414.1910.004.
[3]王朝杰,冯志华,樊浩博.公路隧道施工涌水处治与计量计价 [J].中外公路,2024,44(5):225-231.WANG Chaojie,FENG Zhihua,FAN Haobo.Treatment and measurement of water inrush during highway tunnel construction [J].Journal of China & Foreign Highway,2024,44(5):225-231.
[4]邵文泽,巩宁.弱膨胀黏性土地段大口径顶管工作井施工方案比选及优化 [J].公路,2020,65(6):202-205.SHAO Wenze,GONG Ning.Comparison,selection,and optimization of construction schemes for large-diameter pipe jacking working shaft in weakly expansive cohesive soil area [J].Highway,2020,65(6):202-205.
[5]胡聪,郝英奇.双线平行顶管在不同间距下施工的模型试验与数值模拟分析 [J].建筑结构,2021,51(增刊 2):1854 -1860.HU Cong,HAO Yingqi.Model test and numerical simulation analysis of double-line parallel pipe jacking construction at different intervals [J].Building Structure,2021,51(sup 2):1854 -1860.
[6]应宏伟,姚言,王奎华,等.双线平行顶管上跨地铁盾构隧道施工环境影响实测分析 [J].上海交通大学学报,2023,57(12):1639 -1647.YING Hongwei,YAO Yan,WANG Kuihua,et al.Observed environment response caused by construction of double-line parallel pipe jacking crossing over metro shield tunnels [J].Journal of Shanghai Jiao Tong University,2023,57(12):1639 -1647.
[7]杨仙,肖宇锋,黎永索,等.小间距平行顶管管道土压力计算方法研究 [J].工程科学学报,2021,43(10):1376 -1384.YANG Xian,XIAO Yufeng,LI Yongsuo,et al.Calculation method of the earth pressure for parallel pipe jacking with small spacing [J].Chinese Journal of Engineering,2021,43(10):1376 -1384.
[8]齐培林.并行矩形顶管施工力学与相互影响研究 [D].武汉:武汉科技大学,2018.QI Peilin.Research of construction mechanics and interaction of parallel rectangular pipe-jacking [D].Wuhan:Wuhan University of Science and Technology,2018.
[9]王道伟,王福芝,黎轩,等.水平平行顶管相互影响试验研究[J].地质科技情报,2016,35(2):71-74.WANG Daowei,WANG Fuzhi,LI Xuan,et al.Experimental study on influence between horizontal parallel pipe jacking [J].Geological Science and Technology Information,2016,35(2):71-74.
[10]韩占波,豆小天,曹伟明,等.浅覆土小间距矩形顶管施工地表变形控制技术 [J].隧道建设 (中英文 ),2019,39(3):496-503.HAN Zhanbo,DOU Xiaotian,CAO Weiming,et al.Control technology for surface deformation induced by construction of shallow-covered and small-spacing rectangular pipe jacking [J].Tunnel Construction,2019,39(3):496-503.
[11]李国鹏,王瑞,赵晓薇,等.小净距盾构隧道施工诱发邻近建筑物沉降分析 [J].铁道建筑,2023,63(1):105-110.LI Guopeng,WANG Rui,ZHAO Xiaowei,et al.Analysis of adjacent building settlement induced by shield construction of small spacing tunnel [J].Railway Engineering,2023,63(1):105-110.
[12]何况.盾构隧道下穿复杂建筑物变形分析及控制措施[J].城市轨道交通研究,2023,26(9):62-68,73.HE Kuang.Deformation analysis and control measures for shield tunnel under-passing complex buildings [J].Urban Mass Transit,2023,26(9):62-68,73.
[13]李梓亮,汤劲松,赵书银,等.盾构隧道下穿砌体结构住宅群的施工技术 [J].城市轨道交通研究,2021,24(6):115-120,124.LI Ziliang,TANG Jinsong,ZHAO Shuyin,et al.Construction technology of shield tunnel undercrossing masonry structure residential group [J].Urban Mass Transit,2021,24(6):115-120,124.
[14]王学斌.公路隧道施工对邻近建筑物的影响及控制 [J].公路交通科技,2022,39(8):182-190.WANG Xuebin.Influence and control of highway tunnel construction on adjacent buildings [J].Journal of Highway and Transportation Research and Development,2022,39(8):182-190.
[15]王立新,王强,施王帅胤,等.地铁隧道暗挖下穿玻璃幕墙建筑物稳定性分析 [J].济南大学学报 (自然科学版 ),2023,37(6):711-719.WANG Lixin,WANG Qiang,SHI Wangshuaiyin,et al.Stability analysis on subway tunnel concealed excavation through glass curtain wall buildings [J].Journal of University of Jinan (Science and Technology ),2023,37(6):711-719.
[16]于鹤然,赵巧兰,郭苏锐.浅埋矿山法隧道施工对地表建筑物的影响研究 [J].铁道标准设计,2015,59(8):144-149.YU Heran,ZHAO Qiaolan,GUO Surui.Study on influences of shallow tunnel construction on ground buildings [J].Railway Standard Design,2015,59(8):144-149.
[17]刘佩.大直径浅埋顶管隧道邻近桥桩施工安全控制技术研究 [J].公路,2019,64(10):293-298.LIU Pei.Study on control technology of construction safety for large diameter shallow pipe jacking tunnel near bridge piles [J].Highway,2019,64(10):293-298.
[18]陈志敏,范长海,张常书.地铁盾构下穿建筑群施工地面建筑沉降控制方案及富水砂 -黏地层沉降预测方法 [J].城市轨道交通研究,2023,26(1):39-43.CHEN Zhimin,FAN Changhai,ZHANG Changshu.Building subsidence control in metro shield tunneling under construction ground of buildings and water-rich sand-clay stratum subsidence prediction method [J].Urban Mass Transit,2023,26(1):39-43.
[19]路平,耿艳,张稳军,等.平行隧道穿越形式对砌体建筑变形的影响研究 [J].隧道建设 (中英文 ),2019,39(1):60-67.LU Ping,GENG Yan,ZHANG Wenjun,et al.Study of influence of crossing mode of parallel tunnels on deformation of masonry buildings [J].Tunnel Construction,2019,39(1):60-67.
[20]孙曦源,衡朝阳,周智.北京地铁隧道下穿砌体结构建筑物诱发基础沉降规律实测研究 [J].土木工程学报,2015,48(增刊 2):304-308.SUN Xiyuan,HENG Zhaoyang,ZHOU Zhi.Experimental study on foundation settlement induced by Beijing subway tunnel passing through masonry structure buildings [J].China Civil Engineering Journal,2015,48(sup 2):304-308.
[21]黄兴,贾少东,姚超凡,等.考虑地层应变软化的盾构下穿密集建筑物沉降分析 [J].铁道建筑,2022,62(1):111-116.HUANG Xing,JIA Shaodong,YAO Chaofan,et al.Settlement analysis of dense buildings under-passed by shield tunnel considering stratum strain softening [J].Railway Engineering,2022,62(1):111-116.
[22]杨益,李兴高,秦睿成,等.富水软土地层盾构隧道下穿建筑物沉降分析及控制研究 [J].现代隧道技术,2019,56(增刊2):647-653.YANG Yi,LI Xinggao,QIN Ruicheng,et al.Study on settlement analysis and control of shield tunnel passing through buildings in water-rich soft soil stratum [J].Modern Tunnelling Technology,2019,56(sup 2):647-653.
[23]李明杰,张孟喜,凌宇峰,等.超大直径盾构隧道穿越并列布置建筑群影响分析 [J].铁道标准设计,2023,67(11):134-141.LI Mingjie,ZHANG Mengxi,LING Yufeng,et al.Influence analysis of super-large diameter shield tunnel passing through building complexes with parallel layout [J].Railway Standard Design,2023,67(11):134-141.
[24]YAN B,WANG R,WANG Y.Deformation of adjacent buildings and ground settlement induced by shield construction of three-line small-spacing tunnels [J].Alexandria Engineering Journal,2023,79:237-251.
[25]REN T,ZHANG H L,GUO Y C,et al.Numerical simulation of ground surface settlement of underpass building in tunnel boring machine double-line tunnels [J].Frontiers in Earth Science,2022,10:937524.
[26]梁超强,葛忻声,赵娟,等.盾构下穿浅基础建筑的沉降规律分析 [J].太原理工大学学报,2021,52(2):256-262.LIANG Chaoqiang,GE Xinsheng,ZHAO Juan,et al.Analysis of settlement of buildings induced by shield tunnels under construction [J].Journal of Taiyuan University of Technology,2021,52(2):256-262.
[27]成怡冲,张挺钧,郑翔,等.软土地区明挖隧道施工引起周边建筑沉降的预测方法 [J].城市轨道交通研究,2018,21(10):62-66.CHENG Yichong,ZHANG Tingjun,ZHENG Xiang,et al.Prediction method of surrounding building settlement caused by open-excavated tunnel construction in soft soil area[J].Urban Mass Transit,2018,21(10):62-66.
[28]刘波,陶龙光,丁城刚,等.地铁双隧道施工诱发地表沉降预测研究与应用 [J].中国矿业大学学报,2006,35(3):356-361.LIU Bo,TAO Longguang,DING Chenggang,et al.Prediction for ground subsidence induced by subway double tube tunneling [J].Journal of China University of Mining & Technology,2006,35(3):356-361.
[29]中国建筑科学研究院.建筑结构荷载规范:GB 50009—2012 [S].北京:中国建筑工业出版社,2012.China Academy of Building Research.Load code for the design of building structures:GB 50009—2012 [S].Beijing:China Architecture & Building Press,2012.
[30]路平.基于模糊理论的盾构掘进参数对周围土体变形影响的研究 [D].天津:天津大学,2014.LU Ping.A fuzzy theory-based study on the influence of driving parameters to the surrounding soil deformation in shield tunneling [D].Tianjin:Tianjin University,2014.
[31]ROWE R K,KACK G J.A theoretical examination of the settlements induced by tunnelling:Four case histories [J].Canadian Geotechnical Journal,1983,20(2):299-314.