Matching Analysis of Cantilever Assembly for Wide Steel-UHPC Composite Girder in Cable-Stayed Bridge
Abstract
To control the deformation difference bet ween the to-be-installed and installed segments during the cantilever assembly of wide steel-UHPC composite girders in cable-stayed bridges and achieve precise matching, this paper first introduced a matching method combining pre-hanging cables with crane unloading. Then, by taking the Guanyin Temple Yangtze River Bridge (a super-kilometer-span cable-stayed bridge with wide steel-UHPC composite girders) as the engineering background, a locally refined finite element model was established to analyze the vertical deformation laws of the matching sections during the cantilever assembly construction phase. Finally, the effects of matching sequence, pre-hanging cable force, and crane unloading ratio on the deformation and stress of the girder segments were discussed. Calculation methods for pre-tensioning cable force and unloading ratio were proposed, and the optimal unloading scheme was determined. The results show that the method of pre-hanging cables with crane unloading can effectively reduce the vertical deformation difference between the to-be-installed and installed segments during the cantilever assembly of wide steel-UHPC composite girders, creating favorable conditions for the precise matching of the splicing between to-be-installed and installed segments.
Publication Date
2-5-2026
DOI
10.14048/j.issn.1671-2579.2026.01.015
First Page
140
Last Page
150
Submission Date
February 2026
Recommended Citation
Changsong, CHEN; Cong, WANG; and Gen, HUANG
(2026)
"Matching Analysis of Cantilever Assembly for Wide Steel-UHPC Composite Girder in Cable-Stayed Bridge,"
Journal of China & Foreign Highway: Vol. 46:
Iss.
1, Article 15.
DOI: 10.14048/j.issn.1671-2579.2026.01.015
Available at:
https://zwgl1980.csust.edu.cn/journal/vol46/iss1/15
Reference
[1]杨炎华,齐云慧.组合梁斜拉桥整体节段悬臂拼装足尺模型试验 [J].桥梁建设,2014,44(4):40-44.YANG Yanhua,QI Yunhui.Full-scale model tests for cantilever installation of integral blocks of composite girder cable-stayed bridge [J].Bridge Construction,2014,44(4):40-44.
[2]郝超,邱松定.大跨度钢斜拉桥扁平钢箱梁悬拼阶段相对变形研究 [J].钢结构,2002,17(2):34-37.HAO Chao,QIU Songding.The relative deformation study of flat steel box-shaped girder of long-span cable-stayed bridge during cantilever construction [J].Steel Construction,2002,17(2):34-37.
[3]徐金勇,颜全胜,王卫锋,等.斜拉桥扁平空腹钢箱梁悬拼施工时的截面变形 [J].华南理工大学学报 (自然科学版),2007,35(3):127-131.XU Jinyong,YAN Quansheng,WANG Weifeng,et al.Section deformation of flat hollow steel box girder of cable-stayed bridge during cantilever erection [J].Journal of South China University of Technology (Natural Science Edition ),2007,35(3):127-131.
[4]叶华文,管乐,卫星.斜拉桥扁平钢箱梁悬拼阶段截面对接 变 形 有 限 元 分 析 [J].公 路 交 通 科 技,2009,26(5):69-74.YE Huawen,GUAN Yue,WEI Xing.Analysis of section transverse deformation of flat steel box girder of cable-stayed bridge during cantilevered assembling based on finite element method [J].Journal of Highway and Transportation Research and Development,2009,26(5):69-74.
[5]李忠三,雷俊卿,林道锦.嘉绍大桥钢箱梁悬臂拼装截面变形分析 [J].桥梁建设,2014,44(1):31-36.LI Zhongsan,LEI Junqing,LIN Daojin.Analysis of section deformation of steel box girder of Jiashao bridge during cantilever assembling [J].Bridge Construction,2014,44(1):31-36.
[6]王凌波,刘鹏,李源,等.宽幅钢箱梁斜拉桥悬拼匹配技术研究 [J].中国公路学报,2016,29(12):102-108,141.WANG Lingbo,LIU Peng,LI Yuan,et al.Research on matching technology in cantilever erection for wide steel box girder of cable-stayed bridge [J].China Journal of Highway and Transport,2016,29(12):102-108,141.
[7]蔡炎标,孙立鹏,杨岳华,等.钢箱组合梁斜拉桥悬拼阶段 主 梁 变 形 及 受 力 研 究 [J].世 界 桥 梁,2022,50(6):86-93.CAI Yanbiao,SUN Lipeng,YANG Yuehua,et al.Study of main girder deformation and load bearing behavior of cable-stayed bridge during cantilever assembly of steel box-concrete composite girder [J].World Bridges,2022,50(6):86-93.
[8]HU J S,LI P H.Integral fabrication and hoisting technology of curved continuous steel box girder [M].Water Conservancy and Civil Construction Volume 1.London:CRC Press,2023:274-280.
[9]曹明明,韩洋洋,魏乐永.大跨斜拉桥宽幅 PK组合梁节段吊装精确匹配技术 [J].桥梁建设,2019,49(6):54-59.CAO Mingming,HAN Yangyang,WEI Leyong.Precise matching technique for segmental lifting and erection of wide PK composite girder of long-span cable-stayed bridge [J].Bridge Construction,2019,49(6):54-59.
[10]邹力,聂振龙,魏俊.牌楼长江大桥钢箱梁 “梁重转移 ”吊装技术应用分析 [J].世界桥梁,2020,48(4):21-24.ZOU Li,NIE Zhenlong,WEI Jun.Study of using “girder weight transfer ” technique to erect steel box girders of Pailou Changjiang River highway bridge [J].World Bridges,2020,48(4):21-24.
[11]张晶,赵全成,戚原.武汉青山长江公路大桥宽幅钢箱梁悬臂拼装横向线形匹配技术 [J].桥梁建设,2024,54(2):139-144.ZHANG Jing,ZHAO Quancheng,QI Yuan.Transverse alignment matching techniques for cantilever-assembled wide steel box girders of Wuhan Qingshan Changjiang River highway bridge [J].Bridge Construction,2024,54(2):139-144.
[12]吴启和,陈鸣,罗承斌.苏通大桥标准钢箱梁匹配技术研究[J].中外公路,2008,28(5):124-127.WU Qihe,CHEN Ming,LUO Chengbin.Research on matching technology of standard steel box girder of Sutong bridge [J].Journal of China & Foreign Highway,2008,28(5):124-127.
[13]姜志刚,唐家睿.温州七都大桥北汊桥主桥主梁精确匹配研究 [J].世界桥梁,2023,51(增刊 1):104-109.JIANG Zhigang,TANG Jiarui.Study of precise girder segment matching techniques for north main bridge of Qidu bridge in Wenzhou [J].World Bridges,2023,51(sup 1):104-109.
[14]孙立鹏,刘永健,杨岳华,等.台州湾跨海大桥通航孔桥悬 拼 匹 配 关 键 问 题 研 究 [J].桥 梁 建 设,2018,48(6):116-121.SUN Lipeng,LIU Yongjian,YANG Yuehua,et al.Research on key problems of matching technology in cantilever erection of navigation opening bridge of Taizhou Bay cross-sea bridge [J].Bridge Construction,2018,48(6):116-121.
[15]杨岳华.宽幅组合梁斜拉桥主梁节段预制与安装力学性能研究 [D].西安:长安大学,2017.YANG Yuehua.Research on mechanical properties of girder segment during precast and installation in composite cable stayed bridge with wide width [D].Xi’an:Chang’an University,2017.
[16]王兴.悬拼施工组合梁斜拉桥索梁锚固区桥面板开裂问题研究 [D].西安:长安大学,2020.WANG Xing.Research on cracking of bridge deck in cable-girder anchorage zone of cable-stayed bridge with cantilever assembling construction [D].Xi’an:Chang’an University,2020.
[17]袁博,王晓雷,邹本辉.大跨径斜拉桥扁平钢箱梁悬臂拼装截面变形分析 [J].公路交通科技 (应用技术版 ),2019,15(10):195-199.YUAN Bo,WANG Xiaolei,ZOU Benhui.Deformation analysis of cantilever assembly section of flat steel box girder of long-span cable-stayed bridge [J].Journal of Highway and Transportation Research and Development,2019,15(10):195-199.
[18]冯鹏程,刘新华,易蓓,等.湖北观音寺长江大桥主桥方案构思与总体设计 [J].桥梁建设,2023,53(增刊 1):1-8.FENG Pengcheng,LIU Xinhua,YI Bei,et al.Concept development and overall design for main bridge of Guanyinsi Changjiang river bridge in Hubei Province [J].Bridge Construction,2023,53(sup 1):1-8.
[19]邵旭东.桥梁设计百问 [M].3版.北京:人民交通出版社,2017.SHAO Xudong.Questions & answers for bridge design[M].3rd ed.Beijing:China Communications Press,2017.
[20]蒲洁,李江,王天琪,等.斜拉桥索力张拉优化方法研究[J].交通科技,2023 (5):57-61.PU Jie,LI Jiang,WANG Tianqi,et al.An optimization method for cable tension of cable-stayed bridges [J].Transportation Science & Technology,2023 (5):57-61.
[21]周雨.深中通道中山大桥超宽钢箱梁悬臂拼装横向变形分析及对策措施 [J].中外公路,2024,44(4):197-202.ZHOU Yu.Transverse deformation and countermeasures of cantilever assembly of super-wide steel box girder of Zhongshan bridge over Shenzhen-Zhongshan link [J].Journal of China & Foreign Highway,2024,44(4):197-202.