Corresponding Author

卞新伟,男,博士研究生.E-mail:2227889581@qq.com

Abstract

To address safety and efficiency concerns related to installing large equipment, such as gantry cranes, beneath a 500 kV extra-high-voltage transmission line during urban subway construction, Ansys finite element analysis software was used to simulate the electric field distribution around the transmission line and accurately determine the safe construction height at the site. On this basis, key factors, including foundation bearing capacity, truck crane lifting capacity, forces in slings and guy ropes, and ground anchor bearing capacity, were calculated and analyzed in detail. The results verified the rationality of the equipment selection, and a safe and feasible construction plan was developed. The plan effectively ensures construction safety and improves construction efficiency. It provides reliable technical support for subway station construction beneath 500 kV extra-high-voltage transmission lines, as well as an important reference and practical guidance for large-equipment hoisting operations under similar conditions.

Publication Date

8-16-2026

DOI

10.14048/j.issn.1671-2579.2026.04.001

First Page

1

Last Page

8

Submission Date

August 2026

Reference

[1]顾拥武.北京地铁八通线通环路高压线下的架梁施工[J].铁道建筑,2003,43(11):25-27.Gu Yongwu.Construction of girder bridge erection on Bawangfen-Tongzhou line of Beijing metro project under high-voltage cables [J].Railway Engineering,2003,43(11):25-27.
[2]晋云雷.既有 220 kV高压线下地铁车站深基坑施工技术研究 [J].低碳世界,2022,12(5):163-165.Jin Yunlei.Study on construction technology of deep foundation pit of subway station under existing 220 kV high-voltage line [J].Low Carbon World,2022,12(5):163-165.
[3]金明.220 kV高压架空线下地连墙施工安全控制措施[J].价值工程,2022,41(14):54-56.Jin Ming.Safety management and control measures for underground wall construction under 220 kV high-voltage overhead line [J].Value Engineering,2022,41(14):54-56.
[4]王巍,王宇,李辉,等.架空高压线下钻孔灌注桩安全快速施工方法 [J].云南水力发电,2022,38(5):125-127.Wang Wei,Wang Yu,Li Hui,et al.Safe and fast construction method of bored cast-in-place pile under overhead high-pressure line [J].Yunnan Water Power,2022,38(5):125-127.
[5]刘磊,赵璐璐,王红光,等.高压线下受限空间箱梁架设施工技术研究及应用 [J].建筑结构,2023,53(增刊 1):2287 -2291.Liu Lei,Zhao Lulu,Wang Hongguang,et al.Research and application of box girder erection technology in confined space under high voltage line [J].Building Structure,2023,53(S1):2287 -2291.
[6]周洋.220 kV架空输电线路电磁辐射的相关计算和减缓措施 [J].电工技术,2017 (12):48-49,72.Zhou Yang.Correlation calculation and mitigation measures of electromagnetic radiation of 220 kV overhead transmission lines [J].Electric Engineering,2017 (12):48-49,72.
[7]邵广淼,潘权,颜东煌,等.大跨径钢桁梁悬索桥加劲梁吊装施工节段连接方式研究 [J].中外公路,2024,44(6):191-198.Shao Guangmiao,Pan Quan,Yan Donghuang,et al.Segment connection mode for stiffening girder hoisting construction of long-span steel truss girder suspension bridge [J].Journal of China & Foreign Highway,2024,44(6):191-198.
[8]刘冬雪,马松,郭卫,等.超长高低跨钢结构外墙滑移法吊装安装施工技术研究与应用 [J].建筑结构,2023,53(增刊 1):2230 -2234.Liu Dongxue,Ma Song,Guo Wei,et al.Research and application of slippage method for hoisting and installation of exterior wall of super long high low span steel structure [J].Building Structure,2023,53(S1):2230 -2234.
[9]王忠林,张少露,李小妮.高压线下预制梁板吊装施工技术分析 [J].科技与创新,2023 (12):97-99.Wang Zhonglin,Zhang Shaolu,Li Xiaoni.Analysis on hoisting construction technology of precast beam and slab under high voltage line [J].Science and Technology & Innovation,2023 (12):97-99.
[10]张庆丰,赵德栋,江叶峰.10 kV架空高压线与起重机安全距离不足的分析及电磁辐射计算 [J].中国特种设备安全,2019,35(9):61-64,68.Zhang Qingfeng,Zhao Dedong,Jiang Yefeng.Analysis of insufficient safe distance between 10 kV overhead high voltage wire and a crane and calculation of electromagnetic radiation [J].China Special Equipment Safety,2019,35(9):61-64,68.
[11]杨海生,朱海龙.基于移动模架的明挖隧道衬砌施工方法研究 [J].中外公路,2021,41(1):182-185.Yang Haisheng,Zhu Hailong.Research on construction method of open cut tunnel lining based on movable formwork [J].Journal of China & Foreign Highway,2021,41(1):182-185.
[12]李嘉文,梁盼望,朱伟俊.500 kV交流单回紧凑型输电线路四分裂导线方案电磁环境研究 [J].智能城市,2021,7(21):77-78.Li Jiawen,Liang Panwang,Zhu Weijun.Study on electromagnetic environment of four-split conductor scheme for 500 kV AC single-circuit compact transmission line[J].Intelligent City,2021,7(21):77-78.
[13]GB 50545—2010 110 kV~ 750 kV架空输电线路设计规范[S].GB 50545—2010 Code for design of 110 kV~ 750 kV overhead transmission line [S].
[14]罗鹏,田仲初,张祖军,等.悬浇拱桥中缆索吊装对结构稳定性影响分析 [J/OL ].中外公路,2024 -05-20.https://link.cnki.net/urlid/ 43.1363.U.20240518.2129.010.Luo Peng,Tian Zhongchu,Zhang Zujun,et al.Analysis of the influence of cable hoisting on structural stability in cantilever casting arch bridge [J/OL ].Journal of China & Foreign Highway,2024 -05-20.https://link.cnki.net/urlid/43.1363.U.20240518.2129.010.
[15]李韬.软土地区超长群桩最终沉降估算的实用方法研究[J].建筑结构,2018,48(增刊 1):731-737.Li Tao.Practical method research on final settlement of extra-long pile groups in soft soil region [J].Building Structure,2018,48(S1):731-737.
[16]夏力农.基础工程 [M].北京:中国建材工业出版社,2012.Xia Linong.Foundation engineering [M].Beijing:China Building Material Industry Publishing House,2012.
[17]吕志贤.起重吊装中的载荷系数选取的探讨 [J].石油化工建设,2016,38(6):45-46.Lyu Zhixian.Discussion on the selection of load coefficient in hoisting [J].Petroleum and Chemical Construction,2016,38(6):45-46.
[18]李复懿,尹莉,钟懿,等.纤维绳与钢丝绳在起重机起升中的使用技术对比研究 [J].建设机械技术与管理,2018,31(10):59-64.Li Fuyi,Yin Li,Zhong Yi,et al.Comparison of operation technology about fiber rope and wire rope for hoisting in the crane [J].Construction Machinery Technology & Management,2018,31(10):59-64.
[19]吕维奇.起重机用钢丝绳可靠性安全系数及张力监测研究[D].太原:太原科技大学,2015.Lyu Weiqi.Study on reliability safety factor and tension monitoring of wire rope for crane [D].Taiyuan:Taiyuan University of Science and Technology,2015.
[20]GB 50652—2011 城市轨道交通地下工程建设风险管理规范 [S].GB 50652—2011 Code for risk management of underground works in urban rail transit [S].
[21]尹涛,周陈,刘志鹏,等.山区千米级大跨径拱桥缆索吊装系统结构设计 [J].公路,2023,68(12):107-117.Yin Tao,Zhou Chen,Liu Zhipeng,et al.Structural design of cable hoisting system for bridge with main span exceeding 1 000 min mountainous areas [J].Highway,2023,68(12):107-117.

Share

COinS