Abstract

To investigate the stability problems frequently arising in the push-from-the-rear incremental launching construction of steel box girders of curved ramp bridges, this study took the steel box girder project of the Qingshui Bridge Hub ramp bridge as the engineering background. A finite element model of the curved ramp girder‒launching nose‒support system was first established using Midas Civil. The model's validity was verified with monitoring data of incremental launching force, stress in the girder, and axis deviation from the actual incremental launching process. Subsequently, based on the validated model, the study analyzed the mechanical properties of the steel box girder of the curved ramp bridge under four typical incremental launching conditions, confirming the safety and feasibility of the push-from-the-rear incremental launching scheme. Furthermore, three potential risk factors—axis deviation, support uplift, and asynchronous incremental launching—were investigated, and corresponding integrated stability control measures were proposed. The results demonstrate that the stresses and deformations in the ramp girder and launching nose system and supports under the four typical incremental launching working conditions meet construction requirements. The overall stability coefficient of the incremental launching system of the ramp bridge exhibits negative correlations with both axis deviation and asynchronous incremental launching rates. Among the three risk factors, support uplift is the most critical, with edge support uplift having the most significant adverse impact on structural stability. Additionally, the coupling effect of vibrations and static deviations further reduces system stability. The proposed triple-factor stability control method effectively addresses the overall stability problem facing the steel box girder of the curved ramp bridge during the push-from-the-rear incremental launching process. This study provides a closed-loop risk early warning and control analysis methodology—integrating verification, warning, and control—for similar push-from-the-rear incremental launching projects of curved steel box girders.

Publication Date

8-16-2026

DOI

10.14048/j.issn.1671-2579.2026.04.014

First Page

125

Last Page

136

Submission Date

August 2026

Reference

[1]杨华强.匝道桥现浇梁混凝土工程模板计算与浇筑作业关键技术研究 [J].技术与市场,2025,32(5):139-142.Yang Huaqiang.Research on template calculation and concrete pouring technology for ramp bridge cast-in-place beam [J].Technology and Market,2025,32(5):139-142.
[2]王廷,高达,侯向阳.地铁上盖匝道桥施工技术研究 [J].建筑技术开发,2024,51(6):110-112.Wang Ting,Gao Da,Hou Xiangyang.Research on construction technology of ramp bridge on subway [J].Building Technique Development,2024,51(6):110-112.[3]伍彦斌,吕茂丰,殷齐家,等.大跨简支钢箱梁顶推及高位 落 梁 施 工 关 键 技 术 [J].中 外 公 路,2024,44(1):147-154.Wu Yanbin,Lyu Maofeng,Yin Qijia,et al.Key construction techniques for incremental launching and high falling beam of long-span simply supported steel box girder [J].Journal of China & Foreign Highway,2024,44(1):147-154.
[4]姜锡东,苑青海,何斌.顶推施工下不同腹板加劲间距对钢 梁 受 力 的 影 响 [J].建 筑 技 术 开 发,2023,50(4):140-142.Jiang Xidong,Yuan Qinghai,He Bin.Influence of different web stiffening spacing on steel beam stress under jacking construction [J].Building Technique Development,2023,50(4):140-142.
[5]张全帅,王洪梽,张宪胜,等.大跨度钢桁梁顶推施工横向 抗 倾 覆 研 究 [J].城 市 道 桥 与 防 洪,2023 (4):160-163,171.Zhang Quanshuai,Wang Hongzhi,Zhang Xiansheng,et al.Research on lateral anti-overturning of long-span steel truss girder in incremental launching construction [J].Urban Roads Bridges & Flood Control,2023 (4):160-163,171.
[6]杨长庚,何文,杨孟刚,等.小半径曲线钢箱梁桥顶推施工地震行为研究 [J].公路,2025,70(7):89-98.Yang Changgeng,He Wen,Yang Menggang,et al.Research on the seismic behavior of a small-radius curved bridge during pushing construction [J].Highway,2025,70(7):89-98.
[7]韩慧超,吕之豪,朱伟庆,等.受空间约束时曲线钢箱梁步履式多点顶推策略 [J].公路交通科技,2024,41(9):160-171.Han Huichao,Lyu Zhihao,Zhu Weiqing,et al.Hydraulic-walking multi-point incremental launching strategy for curved steel box girder under spatial constraint [J].Journal of Highway and Transportation Research and Development,2024,41(9):160-171.
[8]邝思芹.连续钢箱梁顶推施工风险评价与分析 [J].建筑结构,2023,53(增刊 1):2310 -2313.Kuang Siqin.Risk Evaluation and analysis of continuous steel box girder jacking construction [J].Building Structure,2023,53(S1):2310 -2313.
[9]伍艺.重庆南纪门轨道交通专用桥引桥钢箱梁顶推技术[J].桥梁建设,2021,51(1):130-135.Wu Yi.Incremental launching techniques for steel box girders in approach bridge of Nanjimen light rail bridge[J].Bridge Construction,2021,51(1):130-135.
[10]顾颖,彭冬梅,王翰林,等.基于矩阵位移法的平面直线形桥梁顶推全阶段受力计算方法研究 [J].桥梁建设,2025,55(5):166-173.Gu Ying,Peng Dongmei,Wang Hanlin,et al.Method to compute load bearing performance of planar straight bridges during whole incremental launching process based on matrix displacement method [J].Bridge Construction,2025,55(5):166-173.
[11]杨晖,傅中秋,何斌,等.变截面钢箱梁不调平顶推梁端倾角限值研究 [J].武汉理工大学学报 (交通科学与工程版),2023,47(6):1114 -1120.Yang Hui,Fu Zhongqiu,He Bin,et al.Research on the limit value of end inclination angle of unleveling incremental launching construction beam of variable-section steel box girder [J].Journal of Wuhan University of Technology (Transportation Science & Engineering ),2023,47(6):1114 -1120.
[12]左家强.复杂条件下顶推小半径连续弯梁设计研究 [J].铁道工程学报,2019,36(6):56-61.Zuo Jiaqiang.Study and design of incremental launched continuous bending girder with small radius under complex condition [J].Journal of Railway Engineering Society,2019,36(6):56-61.
[13]朱利明,唐俊,邢世玲.横向偏位对截面不对称槽形 PC梁受力的影响 [J].西南交通大学学报,2019,54(6):1155 -1161.Zhu Liming,Tang Jun,Xing Shiling.Effect of transverse deflection on force state of prestressed concrete trough girders with asymmetric cross-section [J].Journal of Southwest Jiaotong University,2019,54(6):1155 -1161.
[14]杨增权.大跨曲线钢槽梁顶推施工关键技术 [J].公路交通科技,2021,38(3):56-62,72.Yang Zengquan.Key Technologies for top-push construction of large-span curved steel channel girders [J].Highway Traffic Science and Technology,2021,38(3):56-62,72.
[15]夏学军.宽幅钢箱梁大跨高位顶推施工关键技术 [J].世界桥梁,2019,47(3):15-19.Xia Xuejun.Key construction techniques for long-span and high-position incremental launching of wide steel box girder [J].World Bridges,2019,47(3):15-19.
[16]黄成国,朱铮栋,唐益军,等.曲线钢箱梁桥步履式顶推施工横向倾覆稳定性影响因素的分析 [J].南京工业大学学报 (自然科学版 ),2020,42(3):399-404.Huang Chengguo,Zhu Zhengdong,Tang Yijun,et al.Analysis of factors influencing transverse overturning stability of curved steel box girder bridge by hydraulic-walking incremental launching construction [J].Journal of Nanjing University of Technology (Natural Science Edition ),2020,42(3):399-404.
[17]李浩,刘龙华,罗锦鸿,等.高铁钢箱梁跨中单临时支墩顶 推 施 工 关 键 技 术 [J].铁 道 工 程 学 报,2024,41(9):49-54.Li Hao,Liu Longhua,Luo Jinhong,et al.Key pushing construction technologies for high-speed railway steel box girders with a single mid-span temporary pier [J].Journal of Railway Engineering Society,2024,41(9):49-54.
[18]Li Q F,Guo H,Guo B.The dual-parameter control of synchronization in steel box girder incremental launching construction [J].Applied Sciences,2023,13(21):12074.
[19]Wang H P,Wang K,Gao N.Coordinate monitoring technology in the process of incremental launching construction of curved steel box girder bridge [J].Advances in Civil Engineering,2022,2022:1-12.
[20]Cheng T,Qian S C,Chen L,et al.Mechanical characterization of temporary facilities for jacking construction of curved steel box girders [J].Journal of Physics:Conference Series,2025,3021 (1):012087.
[21]孙晓强,岳新兴.钢箱梁双导梁顶推施工关键技术 [J].中外公路,2024,44(6):204-212.Sun Xiaoqiang,Yue Xinxing.Key technology for incremental launching construction of double guide beam of steel box girder [J].Journal of China & Foreign Highway,2024,44(6):204-212.
[22]莫山峰,黄才良,覃晖.基于非线性分析的顶推计算方法研究 [J].中外公路,2026,46(3)184-193.Mo Shanfeng,Huang Cailiang,Qin Hui.Study on calculation method for incremental launching based on nonlinear analysis [J].Journal of China & Foreign Highway,2,2026,46(3)184-193.

Share

COinS