Corresponding Author

尹晓峰,男,硕士研究生.E-mail:m15580964869@163.com

Abstract

To ensure the construction safety of the short-line precast wide-width concrete beam section on a high platform before splicing, the concrete beam and beam shifting support on the Jiangling side of the Guanyinsi Yangtze River Bridge were taken as the research object. Midas FEA/Civil was adopted to establish the solid model of the beam section and the beam element model of the support, respectively. The transverse stress and deformation in each construction stage before splicing, and the influence of support deformation on the stress of the beam section during beam shifting were calculated and analyzed. Considering the actual construction process and the influence of concrete shrinkage and creep, a reasonable transverse prestressed fractional tensioning scheme for the precast beam section was determined. The calculation results indicate that the transverse prestress of the precast beam section, which is mainly subjected to transverse stress before splicing, must be tensioned fractionally; the timing and degree of fractional tensioning should be adapted to the timing of system conversion and the specific conditions of supports; the deformation of the beam shifting support has a minor effect on the uneven settlement of the four supporting points of the beam section, but its adverse effect on the stress of the beam section still needs to be considered.

Publication Date

8-16-2026

DOI

10.14048/j.issn.1671-2579.2026.04.018

First Page

170

Last Page

177

Submission Date

August 2026

Reference

[1]王志刚,余顺新,陈亚莉.桥梁快速建造技术 [J].中外公路,2018,38(4):184-188.Wang Zhigang,Yu Shunxin,Chen Yali.Discussion on accelerated bridge construction technology [J].Journal of China & Foreign Highway,2018,38(4):184-188.
[2]Fouad F H,Rizk T,Stafford,E L,et al.Prefabricated precast concrete bridge system for the State of Alabama [R].UTCA Report 05215.Tuscaloosa:University Transportation Center for Alabama,2006.
[3]刘先鹏,刘亚东,戴书学,等.箱梁节段短线匹配法预制施工技术 [J].重庆建筑大学学报,2006,28(5):59-62.Liu Xianpeng,Liu Yadong,Dai Shuxue,et al.Short-line match casting technique for precast segmental construction[J].Journal of Chongqing Jianzhu University,2006,28(5):59-62.
[4]王殿伟.PC箱梁短线法节段预制施工技术 [J].世界桥梁,2016,44(3):25-29.Wang Dianwei.Construction techniques for PC box girder prefabricated by short-line match casting method [J].World Bridges,2016,44(3):25-29.
[5]Liu L,Huang T,Chen X F.Measurement techniques of precasting the No.4 Nanjing Yangtze River bridge ’s segmental girders by short-line [J].Applied Mechanics and Materials,2011,90/91/92/93:2891 -2896.
[6]Podolny W J,Muller J M.Construction and design of prestressed concrete segmental bridges [M].New York:Wiley,1982.
[7]李波,程千里,魏传海,等.迪拜 Shindagha 滨海大道高架桥梁短线法节段预制施工技术 [J].施工技术 (中英文 ),2022,51(24):33-39.Li Bo,Cheng Qianli,Wei Chuanhai,et al.Construction technology of short-line segmental precast bridge of Shindagha coastal avenue viaduct project in Dubai [J].Construction Technology,2022,51(24):33-39.
[8]张鸿,张喜刚,丁峰,等.短线匹配法节段预制拼装桥梁新技术研究 [J].公路,2011,56(2):76-82.Zhang Hong,Zhang Xigang,Ding Feng,et al.Research on new technology of segmented precast and assembled bridges by short-line matching method [J].Highway,2011,56(2):76-82.
[9]刘亚东.短线法预制节段桥梁施工工艺研究 [D].重庆:重庆交通大学,2013.Liu Yadong.Technology research of short-line precast segmental bridge construction [D].Chongqing:Chongqing Jiaotong University,2013.
[10]王英.城市桥梁预制箱梁节段拼装关键技术的研究 [D].成都:西南交通大学,2011.Wang Ying.The key technology research of seqmental precasted box girder assembly [D].Chengdu:Southwest Jiaotong University,2011.
[11]黄运林,杨聪,万和安,等.石首长江公路大桥宽幅短线预制混凝土箱梁横向受力有限元计算模型分析 [J].中外公路,2019,39(1):101-104.Huang Yunlin,Yang Cong,Wan Hean,et al.Finite element calculation model analysis of transverse force on wide short-line precast concrete box girder of Shishou Yangtze River highway bridge [J].Journal of China & Foreign Highway,2019,39(1):101-104.
[12]张卫红,代皓,涂满明.花瓶形板式桥墩墩顶开裂加固方案研究 [J].世界桥梁,2025,53(3):124-129.Zhang Weihong,Dai Hao,Tu Manming.Research on remedial solutions for pier-head cracks in vase-shaped wall piers [J].World Bridges,2025,53(3):124-129.
[13]耿丙昌,颜东煌,刘国坤.某斜拉桥索梁锚固区及顶板应力分析与优化 [J/OL ].中外公路,2025 -01-21.https://link.cnki.net/urlid/ 43.1363.U.20250121.1154.004.Geng Bingchang,Yan Donghuang,Liu Guokun.Stress analysis and optimization of cable-girder anchorage zone and roof of a cable-stayed bridge [J/OL ].Journal of China & Foreign Highway,2025 -01-21.https://link.cnki.net/urlid/43.1363.U.20250121.1154.004.
[14]Kurian B,Menon D.Correction of errors in simplified transverse bending analysis of concrete box-girder bridges[J].Journal of Bridge Engineering,2005,10(6):650-657.
[15]杨伟,沈燕霞,刘中原.节段预制箱梁横向受力有限元分析[J].中外公路,2022,42(5):138-144.Yang Wei,Shen Yanxia,Liu Zhongyuan.Finite element analysis of transverse stress of precast box girder [J].Journal of China & Foreign Highway,2022,42(5):138-144.
[16]乔朋,钟承星,狄谨,等.单箱多室波形钢腹板箱梁的横向受力分析 [J].工程力学,2020,37(9):161-172.Qiao Peng,Zhong Chengxing,Di Jin,et al.Analysis of single-box multi-cell composite box girder with corrugated steel webs due to transverse force [J].Engineering Mechanics,2020,37(9):161-172.
[17]涂光亚,雍郡,吕香华.宽幅短线预制混凝土箱梁横向预应力分次张拉研究 [J].世界桥梁,2019,47(2):67-71.Tu Guangya,Yong Jun,Lyu Xianghua.Study of multiple times of transverse prestress tensioning in wide concrete box girder fabricated by short-line match method [J].World Bridges,2019,47(2):67-71.
[18]JTG 3362—2018 公路钢筋混凝土及预应力混凝土桥涵设计规范 [S].JTG 3362—2018 Specifications for design of highway reinforced concrete and prestressed concrete bridges and culverts:[S].
[19]李贤仰,邓继华,梁璐祎,等.体外预应力钢筋混凝土梁收缩与徐变的精细有限元分析 [J].中外公路,2026,46(1):161-168.Li Xianyang,Deng Jihua,Liang Luyi,et al.Refined finite element analysis of shrinkage and creep in external prestressed reinforced concrete beams [J].Journal of China & Foreign Highway,2026,46(1):161-168.
[20]史爱红.双箱单室波形钢腹板组合箱梁力学性能试验研究[J].公路,2024,69(9):131-136.Shi Aihong.Experimental study on mechanical properties of double-box single-cell corrugated steel web composite box girder [J].Highway,2024,69(9):131-136.

Share